Total Projects: 764
Projects Under Construction: 45
Projects Completed: 698
Original Approved Budget (2011 Dollars): $366,631,175.00
Total Expenditure to Date: $156,978,751.24
Tax Revenue Collected to Date
$308,085,817.19
Filter projects by:
PI No: 0000833
Regional Project Id: RC09-000041
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015
Original Project Budgeted: $15,294,495 (Blended Project - Total Budget)
Invoiced to Date: $6,432,020.65
Project Description: Oconee River Bridge Project
PI No: 0001216
Regional Project Id: RC09-000003
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015
Original Project Budgeted: $24,848,903 (Blended Project - Total Budget)
Invoiced to Date: $4,274,744.43
Project Description: Bridge Replacement of SR 4/US 1 over Altamaha River and Overflow, and Williams Creek
PI No: 0007037
Regional Project Id: RC09-000030
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019
Original Project Budgeted: $6,963,332 (Blended Project - Total Budget)
Invoiced to Date: $1,612,480.00
Project Description: Bridge Replacement at SR 135 over Altamaha River
PI No: 0007413
Regional Project Id: RC09-000039
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2016 to 2019
Original Project Budgeted: $24,013,975 (Blended Project - Total Budget)
Invoiced to Date: $14,478,108.80
Project Description: Hillcrest Parkway from CR493/Industrial Blvd. to SR31/US 441
PI No: 0008289
Regional Project Id: RC09-000062
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Passing Lanes
Band: 3:2020 to 2022
Original Project Budgeted: $10,900,000
Invoiced to Date: $3,051,217.68
Project Description: SR 23, 57 Passing Lanes Glennville to Reidsville
PI No: 0011442
Regional Project Id: RC09-000015
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 1:2013 to 2015
Original Project Budgeted: $6,429,877
Invoiced to Date: $3,616,353.49
Project Description: CR 454/CR 225/Cartee Lee Rd/Salem Ch Rd/Lake Ch Rd - Swainsboro to Metter
PI No: 0011443
Regional Project Id: RC09-000027
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019
Original Project Budgeted: $1,745,000
Invoiced to Date: $1,583,297.96
Project Description: Replace Bridge over Canoochee River on Daisy Nevils Highway
PI No: 0011578
Regional Project Id: HG-0005
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $2,889,000
Invoiced to Date: $2,834,281.00
Project Description: Appling Zoar Road
PI No: 0011579
Regional Project Id: HG-0006
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019
Original Project Budgeted: $1,483,800
Invoiced to Date: $1,470,534.00
Project Description: Appling Red Oak Church Road
PI No: 0011580
Regional Project Id: HG-0007
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $900,000
Invoiced to Date: $891,454.00
Project Description: Appling Altamaha School Road
PI No: 0011581
Regional Project Id: HG-0009
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $8,400
Invoiced to Date: $9,080.14
Project Description: Baxley Barnes Street Seg 1
PI No: 0011582
Regional Project Id: HG-0010
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $9,800
Invoiced to Date: $9,093.53
Project Description: Baxley Lee Street Seg 1
PI No: 0011583
Regional Project Id: HG-0011
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $21,000
Invoiced to Date: $17,518.58
Project Description: Baxley Miles Street
PI No: 0011584
Regional Project Id: HG-0012
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $8,466
Invoiced to Date: $10,986.00
Project Description: Baxley Thomas Street Seg 1
PI No: 0011585
Regional Project Id: HG-0013
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $9,800
Invoiced to Date: $15,680.82
Project Description: Baxley Weaver Street East
PI No: 0011586
Regional Project Id: HG-0014
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $116,000
Invoiced to Date: $75,576.46
Project Description: Baxley NE Park Avenue
PI No: 0011587
Regional Project Id: HG-0015
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $32,200
Invoiced to Date: $12,965.34
Project Description: Baxley NFL Drive
PI No: 0011588
Regional Project Id: HG-0016
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $19,600
Invoiced to Date: $13,397.86
Project Description: Baxley Third Street
PI No: 0011589
Regional Project Id: HG-0017
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $61,600
Invoiced to Date: $24,124.86
Project Description: Baxley Pine Street Extension
PI No: 0011590
Regional Project Id: HG-0018
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $143,072
Invoiced to Date: $55,224.24
Project Description: Baxley East Allen Street
PI No: 0011591
Regional Project Id: HG-0019
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $11,200
Invoiced to Date: $10,311.77
Project Description: Baxley Heritage Drive
PI No: 0011592
Regional Project Id: HG-0020
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $11,200
Invoiced to Date: $7,802.35
Project Description: Baxley Ivey Street East
PI No: 0011593
Regional Project Id: HG-0021
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $16,800
Invoiced to Date: $244.00
Project Description: Baxley Page Street
PI No: 0011594
Regional Project Id: HG-0022
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $13,066
Invoiced to Date: $12,328.77
Project Description: Baxley Crosby Street Seg 1
PI No: 0011595
Regional Project Id: HG-0023
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $81,895
Invoiced to Date: $46,339.17
Project Description: Baxley SE Park Avenue
PI No: 0011596
Regional Project Id: HG-0024
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $119,248
Invoiced to Date: $56,794.67
Project Description: Baxley Anthony Street
PI No: 0011597
Regional Project Id: HG-0025
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,400
Invoiced to Date: $10,140.03
Project Description: Baxley Copeland Avenue
PI No: 0011598
Regional Project Id: HG-0026
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $201,766
Invoiced to Date: $92,413.26
Project Description: Baxley MLK Avenue Seg 1
PI No: 0011599
Regional Project Id: HG-0027
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $28,000
Invoiced to Date: $24,187.51
Project Description: Baxley Harley Street
PI No: 0011600
Regional Project Id: HG-0028
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $15,400
Invoiced to Date: $13,968.00
Project Description: Baxley Foundry Street
PI No: 0011601
Regional Project Id: HG-0029
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,400
Invoiced to Date: $10,343.91
Project Description: Baxley Kenny Lane
PI No: 0011602
Regional Project Id: HG-0030
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $36,397
Invoiced to Date: $21,099.81
Project Description: Baxley MLK Avenue Seg 2
PI No: 0011603
Regional Project Id: HG-0031
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $18,200
Invoiced to Date: $12,606.93
Project Description: Baxley Johnson Street
PI No: 0011604
Regional Project Id: HG-0032
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $12,600
Invoiced to Date: $7,477.21
Project Description: Baxley Lackawanna Street Seg 1
PI No: 0011605
Regional Project Id: HG-0033
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $77,000
Invoiced to Date: $44,627.65
Project Description: Baxley Pine Street
PI No: 0011606
Regional Project Id: HG-0034
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $19,248
Invoiced to Date: $18,884.07
Project Description: Baxley SW Park Avenue
PI No: 0011607
Regional Project Id: HG-0035
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $9,800
Invoiced to Date: $6,525.07
Project Description: Baxley North Lee Street Extension
PI No: 0011608
Regional Project Id: HG-0036
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,400
Invoiced to Date: $9,217.44
Project Description: Baxley Spruce Street
PI No: 0011609
Regional Project Id: HG-0037
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $133,218
Invoiced to Date: $132,027.00
Project Description: Baxley Fair Street
PI No: 0011610
Regional Project Id: HG-0038
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $138,100
Invoiced to Date: $87,467.35
Project Description: Baxley Holmesville Avenue
PI No: 0011611
Regional Project Id: HG-0039
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $36,398
Invoiced to Date: $26,463.00
Project Description: Baxley Crowder Street
PI No: 0011612
Regional Project Id: HG-0040
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $28,000
Invoiced to Date: $19,587.00
Project Description: Baxley Dogwood Lane
PI No: 0011613
Regional Project Id: HG-0041
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $36,400
Invoiced to Date: $14,829.00
Project Description: Baxley Lucerne Street
PI No: 0011614
Regional Project Id: HG-0042
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $49,000
Invoiced to Date: $40,268.00
Project Description: Baxley Magnolia Lane
PI No: 0011615
Regional Project Id: HG-0043
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $28,000
Invoiced to Date: $23,975.00
Project Description: Baxley Oak Street Seg 1
PI No: 0011616
Regional Project Id: HG-0044
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $57,400
Invoiced to Date: $0
Project Description: Baxley Penniman Street
PI No: 0011617
Regional Project Id: HG-0045
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $54,600
Invoiced to Date: $43,429.50
Project Description: Baxley Second Street
PI No: 0011618
Regional Project Id: HG-0046
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $51,800
Invoiced to Date: $46,399.00
Project Description: Baxley Hopps Street
PI No: 0011619
Regional Project Id: HG-0047
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $10,424
Invoiced to Date: $0
Project Description: Baxley Barnes Street Seg 2
PI No: 0011620
Regional Project Id: HG-0048
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $13,650
Invoiced to Date: $0
Project Description: Baxley West Allen Street
PI No: 0011621
Regional Project Id: HG-0049
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $8,632
Invoiced to Date: $11,689.00
Project Description: Baxley Washington Street
PI No: 0011622
Regional Project Id: HG-0050
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $21,000
Invoiced to Date: $0
Project Description: Baxley Dean Street
PI No: 0011623
Regional Project Id: HG-0051
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $25,200
Invoiced to Date: $10,760.00
Project Description: Baxley Douglas Drive
PI No: 0011624
Regional Project Id: HG-0052
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $49,000
Invoiced to Date: $34,082.00
Project Description: Baxley First Street
PI No: 0011625
Regional Project Id: HG-0053
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $19,600
Invoiced to Date: $0
Project Description: Baxley South Harvey Street
PI No: 0011626
Regional Project Id: HG-0054
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $14,000
Invoiced to Date: $7,826.00
Project Description: Baxley Jerome Street
PI No: 0011627
Regional Project Id: HG-0055
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $37,800
Invoiced to Date: $31,165.00
Project Description: Baxley Jr High Drive
PI No: 0011628
Regional Project Id: HG-0134
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $36,400
Invoiced to Date: $31,349.23
Project Description: Surrency Cemetery Street
PI No: 0011629
Regional Project Id: HG-0132
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $36,400
Invoiced to Date: $19,249.86
Project Description: Surrency Andrews Street
PI No: 0011630
Regional Project Id: HG-0129
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $33,600
Invoiced to Date: $0
Project Description: Surrency Norwood Street
PI No: 0011631
Regional Project Id: HG-0135
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015
Original Project Budgeted: $139,000
Invoiced to Date: $137,757.00
Project Description: Bleckley Jones Road Bridge
PI No: 0011632
Regional Project Id: HG-0137
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $140,170
Invoiced to Date: $55,122.51
Project Description: Bleckley Jac Arts Road Resurfacing
PI No: 0011633
Regional Project Id: HG-0138
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $235,800
Invoiced to Date: $233,692.00
Project Description: Bleckley Roy Bryant Road Paving
PI No: 0011634
Regional Project Id: HG-0139
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $113,385
Invoiced to Date: $112,532.73
Project Description: Bleckley Pineland Estates Road Paving
PI No: 0011635
Regional Project Id: HG-0140
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $70,000
Invoiced to Date: $52,781.70
Project Description: Bleckley Browning Drive Resurfacing
PI No: 0011636
Regional Project Id: HG-0141
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $252,000
Invoiced to Date: $210,830.43
Project Description: Bleckley Bates Road Resurfacing
PI No: 0011637
Regional Project Id: HG-0142
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $154,000
Invoiced to Date: $166,507.64
Project Description: Bleckley Crest Drive Resurfacing
PI No: 0011840
Regional Project Id: RC09-000089
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015
Original Project Budgeted: $13,978,470
Invoiced to Date: $13,593,948.39
Project Description: SR 169 Railroad Overpass
PI No: 0011841
Regional Project Id: RC09-000090
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 1:2013 to 2015
Original Project Budgeted: $2,978,086
Invoiced to Date: $2,665,109.76
Project Description: SR 169 Widening from Sunset Blvd. to NS Railroad Overpass in Jesup
PI No: 0011854
Regional Project Id: HG-0143
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $266,000
Invoiced to Date: $198,411.30
Project Description: Bleckley Trail Branch Road Resurfacing
PI No: 0011855
Regional Project Id: HG-0144
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $619,200
Invoiced to Date: $613,664.00
Project Description: Bleckley Limestone Road Resurfacing
PI No: 0011856
Regional Project Id: HG-0145
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $560,000
Invoiced to Date: $452,745.67
Project Description: Bleckley Cary Salem Road Resurfacing
PI No: 0011857
Regional Project Id: HG-0146
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $491,400
Invoiced to Date: $439,028.68
Project Description: Bleckley Talmadge Coley and Irve Land Roads Resurfacing
PI No: 0011858
Regional Project Id: HG-0147
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $280,000
Invoiced to Date: $351,072.00
Project Description: Bleckley Magnolia Road Resurfacing (Begin at Centennery Rd and go 2.0 miles North)
PI No: 0011859
Regional Project Id: HG-0148
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $36,273
Invoiced to Date: $35,949.00
Project Description: Cochran Railroad Avenue
PI No: 0011860
Regional Project Id: HG-0149
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $127,591
Invoiced to Date: $113,104.00
Project Description: Cochran Lewis Street
PI No: 0011861
Regional Project Id: HG-0150
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $130,322
Invoiced to Date: $141,558.07
Project Description: Cochran Beech Street
PI No: 0011862
Regional Project Id: HG-0151
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $35,663
Invoiced to Date: $32,441.53
Project Description: Cochran Maple Street
PI No: 0011863
Regional Project Id: HG-0152
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $78,803
Invoiced to Date: $64,634.30
Project Description: Cochran Martin Luther King Blvd
PI No: 0011864
Regional Project Id: HG-0153
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $45,076
Invoiced to Date: $37,961.31
Project Description: Cochran Seventh Street
PI No: 0011865
Regional Project Id: HG-0154
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $149,837
Invoiced to Date: $146,259.68
Project Description: Cochran Ash Street
PI No: 0011866
Regional Project Id: HG-0155
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $66,129
Invoiced to Date: $64,886.00
Project Description: Cochran Palm Street
PI No: 0011867
Regional Project Id: HG-0156
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $74,826
Invoiced to Date: $51,177.75
Project Description: Cochran Crest Drive
PI No: 0011868
Regional Project Id: HG-0158
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $266,000
Invoiced to Date: $210,241.27
Project Description: Candler East Pulaski Highway
PI No: 0011869
Regional Project Id: HG-0167
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $761,250
Invoiced to Date: $177,740.65
Project Description: Candler St Matthews Church Road
PI No: 0011870
Regional Project Id: HG-0166
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $688,017
Invoiced to Date: $688,017.00
Project Description: Candler Oak Tree Road
PI No: 0011871
Regional Project Id: HG-0159
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $532,000
Invoiced to Date: $634,997.22
Project Description: Candler Eden Church Road
PI No: 0011872
Regional Project Id: HG-0168
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $152,250
Invoiced to Date: $150,889.25
Project Description: Candler High Bluff Road
PI No: 0011873
Regional Project Id: HG-0169
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $203,000
Invoiced to Date: $201,185.00
Project Description: Candler Windmill Road
PI No: 0011874
Regional Project Id: HG-0170
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $180,606
Invoiced to Date: $153,551.69
Project Description: Metter Central Avenue
PI No: 0011875
Regional Project Id: HG-0171
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $17,479
Invoiced to Date: $17,148.00
Project Description: Metter North Williams Street
PI No: 0011876
Regional Project Id: HG-0172
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $21,540
Invoiced to Date: $21,348.00
Project Description: Metter Matthew Street
PI No: 0011877
Regional Project Id: HG-0174
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $200,928
Invoiced to Date: $197,123.00
Project Description: Metter Martin Luther King Jr Blvd
PI No: 0011878
Regional Project Id: HG-0173
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $48,086
Invoiced to Date: $47,656.00
Project Description: Metter West Vertia Street
PI No: 0011879
Regional Project Id: HG-0175
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $61,748
Invoiced to Date: $61,196.00
Project Description: Metter Green Street
PI No: 0011880
Regional Project Id: HG-0176
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $32,044
Invoiced to Date: $31,757.00
Project Description: Metter Burton Avenue
PI No: 0011881
Regional Project Id: HG-0177
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $117,977
Invoiced to Date: $116,922.00
Project Description: Metter South Kennedy Street
PI No: 0011882
Regional Project Id: HG-0178
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $99,031
Invoiced to Date: $98,146.00
Project Description: Metter Ellis Street
PI No: 0011883
Regional Project Id: HG-0179
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $33,487
Invoiced to Date: $33,188.00
Project Description: Metter Hulett Street
PI No: 0011884
Regional Project Id: HG-0180
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $45,095
Invoiced to Date: $44,692.00
Project Description: Metter Smith Street
PI No: 0011885
Regional Project Id: HG-0181
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $43,679
Invoiced to Date: $43,289.00
Project Description: Metter Boston Street
PI No: 0011886
Regional Project Id: HG-0182
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $46,647
Invoiced to Date: $46,230.00
Project Description: Metter Mincey Street
PI No: 0011887
Regional Project Id: HG-0183
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $117,977
Invoiced to Date: $116,922.00
Project Description: Metter South Rountree Street
PI No: 0011888
Regional Project Id: HG-0184
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $58,239
Invoiced to Date: $57,718.00
Project Description: Metter South Williams Street
PI No: 0011889
Regional Project Id: HG-0185
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $59,717
Invoiced to Date: $0
Project Description: Metter Neal Street
PI No: 0011890
Regional Project Id: HG-0186
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2020 to 2022
Original Project Budgeted: $196,431
Invoiced to Date: $0
Project Description: Metter South Lewis Street
PI No: 0011891
Regional Project Id: HG-0187
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $181,997
Invoiced to Date: $0
Project Description: Metter East Lillian Street
PI No: 0011892
Regional Project Id: HG-0188
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $29,120
Invoiced to Date: $0
Project Description: Metter Haymans Street
PI No: 0011893
Regional Project Id: HG-0189
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $321,583
Invoiced to Date: $43,030.00
Project Description: Metter East Hiawatha Street
PI No: 0011894
Regional Project Id: HG-0191
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $14,000
Invoiced to Date: $11,946.74
Project Description: Pulaski Pulaski School Road
PI No: 0011895
Regional Project Id: HG-0192
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $14,000
Invoiced to Date: $14,351.86
Project Description: Pulaski West Railroad Street Seg 1
PI No: 0011896
Regional Project Id: HG-0194
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $14,000
Invoiced to Date: $19,429.21
Project Description: Pulaski Brannen Street
PI No: 0011897
Regional Project Id: HG-0195
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $28,000
Invoiced to Date: $32,651.71
Project Description: Pulaski East Railroad Street
PI No: 0011898
Regional Project Id: HG-0196
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $14,000
Invoiced to Date: $15,289.19
Project Description: Pulaski Back Street Seg 1
PI No: 0011899
Regional Project Id: HG-0198
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $28,000
Invoiced to Date: $10,746.77
Project Description: Pulaski Back Street Seg 2
PI No: 0011900
Regional Project Id: HG-0197
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $14,000
Invoiced to Date: $13,578.46
Project Description: Pulaski Lee Street
PI No: 0011901
Regional Project Id: HG-0206
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $1,178,400
Invoiced to Date: $980,064.35
Project Description: Dodge Chester Highway
PI No: 0011902
Regional Project Id: HG-0210
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $333,600
Invoiced to Date: $280,244.73
Project Description: Dodge Bell Line Road
PI No: 0011903
Regional Project Id: HG-0211
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019
Original Project Budgeted: $217,600
Invoiced to Date: $204,561.95
Project Description: Dodge East Chicken Road
PI No: 0011904
Regional Project Id: HG-0213
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019
Original Project Budgeted: $425,600
Invoiced to Date: $375,102.80
Project Description: Dodge Milan Chauncey Road
PI No: 0011905
Regional Project Id: HG-0216
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019
Original Project Budgeted: $710,400
Invoiced to Date: $575,706.27
Project Description: Dodge Rocky Springs Road
PI No: 0011906
Regional Project Id: HG-0212
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019
Original Project Budgeted: $620,000
Invoiced to Date: $508,692.67
Project Description: Dodge Middle Ground Church Road
PI No: 0011907
Regional Project Id: HG-0215
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019
Original Project Budgeted: $199,200
Invoiced to Date: $160,537.14
Project Description: Dodge Edna Moore Road
PI No: 0011908
Regional Project Id: HG-0207
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $631,200
Invoiced to Date: $568,975.27
Project Description: Dodge Roddy Highway
PI No: 0011909
Regional Project Id: HG-0208
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $470,400
Invoiced to Date: $402,427.02
Project Description: Dodge Horne Road
PI No: 0011910
Regional Project Id: HG-0209
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $236,000
Invoiced to Date: $350,914.40
Project Description: Dodge Jim Ross Road = Part (2.95 mi) - (Begin at SR 87 End at Ran Stewart Road (CR 74))
PI No: 0011911
Regional Project Id: HG-0221
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $56,000
Invoiced to Date: $57,331.78
Project Description: Chauncey Bussy Street
PI No: 0011912
Regional Project Id: HG-0219
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $42,000
Invoiced to Date: $39,303.75
Project Description: Chauncey Bush Avenue -(.3 mile not on LMIG)
PI No: 0011913
Regional Project Id: HG-0220
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $31,920
Invoiced to Date: $37,096.13
Project Description: Chauncey Durham Street - (.228 mile not on LMIG)
PI No: 0011914
Regional Project Id: HG-0242
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $63,636
Invoiced to Date: $53,238.38
Project Description: Eastman Ward St - Dodge Ave to 1st Ave
PI No: 0011915
Regional Project Id: HG-0228
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $17,632
Invoiced to Date: $17,247.28
Project Description: Eastman Oak Street-Golf Course Rd to Cochran Hwy
PI No: 0011916
Regional Project Id: HG-0229
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $3,447
Invoiced to Date: $3,354.61
Project Description: Eastman Douglas St-Rose St to dead end
PI No: 0011917
Regional Project Id: HG-0248
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $17,367
Invoiced to Date: $17,006.96
Project Description: Eastman Asbury Drive - Sheldon to Sheldon
PI No: 0011918
Regional Project Id: HG-0277
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $37,651
Invoiced to Date: $36,868.37
Project Description: Eastman Forest Lake Rd - 4th to 9th
PI No: 0011919
Regional Project Id: HG-0274
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $56,742
Invoiced to Date: $55,648.64
Project Description: Eastman 4th Ave - Congo Lane to Legion Dr
PI No: 0011920
Regional Project Id: HG-0264
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $34,072
Invoiced to Date: $33,138.08
Project Description: Eastman West Main - 5th to 9th Ave
PI No: 0011921
Regional Project Id: HG-0251
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $38,977
Invoiced to Date: $38,203.27
Project Description: Eastman Pine Haven Dr - College to Dead end
PI No: 0011922
Regional Project Id: HG-0247
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $30,492
Invoiced to Date: $29,638.70
Project Description: Eastman Norman Ave - 9th to Leitch
PI No: 0011923
Regional Project Id: HG-0243
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $6,708
Invoiced to Date: $5,611.78
Project Description: Eastman Ward St - Hwy 46 to 1st Ave
PI No: 0011924
Regional Project Id: HG-0240
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $14,371
Invoiced to Date: $14,028.44
Project Description: Eastman Bethel - 7th Ave to Anson
PI No: 0011925
Regional Project Id: HG-0280
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $43,219
Invoiced to Date: $42,369.87
Project Description: Eastman Main St - 14th Ave to 9th Ave
PI No: 0011926
Regional Project Id: HG-0261
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $32,348
Invoiced to Date: $31,503.47
Project Description: Eastman Leitch St - Livingston to 14th Ave
PI No: 0011927
Regional Project Id: HG-0283
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $14,981
Invoiced to Date: $14,645.38
Project Description: Eastman South Carolina St - 5th to Gum
PI No: 0011928
Regional Project Id: HG-0231
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $21,477
Invoiced to Date: $20,884.24
Project Description: Eastman North St-14th to Dixon St
PI No: 0011929
Regional Project Id: HG-0244
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $57,803
Invoiced to Date: $56,407.80
Project Description: Eastman James Ave - Ward St to South Carolina St
PI No: 0011930
Regional Project Id: HG-0233
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $29,644
Invoiced to Date: $28,861.57
Project Description: Eastman 4th Ave-Sheldon St to Hwy 46
PI No: 0011931
Regional Project Id: HG-0230
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $17,500
Invoiced to Date: $17,158.35
Project Description: Eastman 8th Ave-Bay to Oak
PI No: 0011932
Regional Project Id: HG-0296
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $8,617
Invoiced to Date: $8,540.00
Project Description: Eastman 8th Ave - Sheldon to Dead End
PI No: 0011933
Regional Project Id: HG-0265
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $29,299
Invoiced to Date: $28,623.22
Project Description: Eastman 13th Ave - Oak to Creighton
PI No: 0011934
Regional Project Id: HG-0239
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $18,560
Invoiced to Date: $18,069.25
Project Description: Eastman Rose St - Livingston to 9th Ave
PI No: 0011935
Regional Project Id: HG-0250
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $10,340
Invoiced to Date: $10,090.60
Project Description: Eastman Minter Ridge Dr - Minter Dr to Pine Haven
PI No: 0011936
Regional Project Id: HG-0252
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $10,340
Invoiced to Date: $10,113.39
Project Description: Eastman Minter Drive - College to Pine Haven
PI No: 0011937
Regional Project Id: HG-0385
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $37,784
Invoiced to Date: $37,446.00
Project Description: Eastman Woodlake Dr - North Lakes to Dead End
PI No: 0011938
Regional Project Id: HG-0276
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $61,276
Invoiced to Date: $60,074.04
Project Description: Eastman 7th Ave - Odgen to Forest Lake Rd
PI No: 0011939
Regional Project Id: HG-0272
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $6,628
Invoiced to Date: $6,453.89
Project Description: Eastman Pine St - 2nd to 1st
PI No: 0011940
Regional Project Id: HG-0246
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $19,223
Invoiced to Date: $19,051.00
Project Description: Eastman Leitch St - Livingston to 9th
PI No: 0011941
Regional Project Id: HG-0236
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $7,556
Invoiced to Date: $7,489.00
Project Description: Eastman Lee St - Dorough St to Leitch
PI No: 0011942
Regional Project Id: HG-0253
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $7,822
Invoiced to Date: $7,752.00
Project Description: Eastman Lakeview Ct - 10th to Dead End
PI No: 0011943
Regional Project Id: HG-0273
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $25,322
Invoiced to Date: $21,183.85
Project Description: Eastman Edgewood Rd - MLK Dr to MLK Dr
PI No: 0011944
Regional Project Id: HG-0294
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $27,628
Invoiced to Date: $27,381.00
Project Description: Eastman 7th Ave - Sheldon to Page
PI No: 0011945
Regional Project Id: HG-0312
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $17,234
Invoiced to Date: $17,079.00
Project Description: Eastman Foster St - 3rd Ave to Beulah
PI No: 0011946
Regional Project Id: HG-0234
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $21,079
Invoiced to Date: $20,891.00
Project Description: Eastman Page St- Hwy 46 to 1st Ave
PI No: 0011947
Regional Project Id: HG-0271
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $10,871
Invoiced to Date: $10,774.00
Project Description: Eastman 1st Ave - Oak to Plum
PI No: 0011948
Regional Project Id: HG-0263
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $27,443
Invoiced to Date: $27,197.00
Project Description: Eastman Delacey St - 4th to 7th
PI No: 0011949
Regional Project Id: HG-0245
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $74,242
Invoiced to Date: $73,578.00
Project Description: Eastman Main St - 1st Ave to Dodge Ave
PI No: 0011950
Regional Project Id: HG-0241
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $13,787
Invoiced to Date: $11,534.43
Project Description: Eastman Ada St - 14th to Dead end
PI No: 0011951
Regional Project Id: HG-0237
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $16,174
Invoiced to Date: $16,029.00
Project Description: Eastman Lee St - Leitch to Page
PI No: 0011952
Regional Project Id: HG-0235
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $22,803
Invoiced to Date: $22,599.00
Project Description: Eastman Neese St - 14th to Lee
PI No: 0011953
Regional Project Id: HG-0297
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $9,545
Invoiced to Date: $9,460.00
Project Description: Eastman Park St - 5th to 3rd
PI No: 0011954
Regional Project Id: HG-0286
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $31,287
Invoiced to Date: $31,008.00
Project Description: Eastman Eastman St - 9th to 12th
PI No: 0011955
Regional Project Id: HG-0313
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $49,497
Invoiced to Date: $48,255.29
Project Description: Eastman Beulah St - Mt Moriah St to Ward St
PI No: 0011956
Regional Project Id: HG-0320
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $50,644
Invoiced to Date: $50,191.00
Project Description: Eastman College St - Oak to 5th
PI No: 0011957
Regional Project Id: HG-0309
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $24,526
Invoiced to Date: $24,307.00
Project Description: Eastman King St - 1st Ave to Hwy 46
PI No: 0011958
Regional Project Id: HG-0326
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $27,045
Invoiced to Date: $22,625.72
Project Description: Eastman Morgan Creek Dr - Mary Alexander to Bypass
PI No: 0011959
Regional Project Id: HG-0335
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $40,037
Invoiced to Date: $39,679.00
Project Description: Eastman Creighton St - 14th to 9th
PI No: 0011960
Regional Project Id: HG-0404
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,246
Invoiced to Date: $15,109.00
Project Description: Eastman Greenhill - 4th to 7th Ave
PI No: 0011961
Regional Project Id: HG-0255
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $9,412
Invoiced to Date: $9,328.00
Project Description: Eastman Durhart St - Plum to Dead end
PI No: 0011962
Regional Project Id: HG-0256
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $9,943
Invoiced to Date: $9,854.00
Project Description: Eastman Morgan St - Plum to Dead End
PI No: 0011963
Regional Project Id: HG-0257
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $11,799
Invoiced to Date: $11,693.00
Project Description: Eastman Plum St - 2nd to MLK Dr
PI No: 0011964
Regional Project Id: HG-0258
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $6,894
Invoiced to Date: $5,768.27
Project Description: Eastman Popular St - 2nd to 1st
PI No: 0011965
Regional Project Id: HG-0259
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $11,534
Invoiced to Date: $11,431.00
Project Description: Eastman Burch St - 2nd to MLK Dr
PI No: 0011966
Regional Project Id: HG-0270
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $32,481
Invoiced to Date: $32,191.00
Project Description: Eastman 3rd Ave - Odgen to Oak
PI No: 0011967
Regional Project Id: HG-0278
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $22,935
Invoiced to Date: $22,730.00
Project Description: Eastman Lee St - Main to Dorough St
PI No: 0011968
Regional Project Id: HG-0238
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $25,984
Invoiced to Date: $25,751.00
Project Description: Eastman Park St - 14th Ave to Lee
PI No: 0011969
Regional Project Id: HG-0267
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $17,234
Invoiced to Date: $14,417.55
Project Description: Eastman 11th Ave - Pine Dr to Oak
PI No: 0011970
Regional Project Id: HG-0300
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $37,519
Invoiced to Date: $37,183.00
Project Description: Eastman Legion Dr - Griffin to 3rd Ave
PI No: 0011971
Regional Project Id: HG-0299
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $42,159
Invoiced to Date: $41,782.00
Project Description: Eastman MLK Dr - 1st to Legion Dr
PI No: 0011972
Regional Project Id: HG-0293
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $22,670
Invoiced to Date: $22,467.00
Project Description: Eastman 7th Ave - Page to Norman
PI No: 0011973
Regional Project Id: HG-0422
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $32,481
Invoiced to Date: $27,174.04
Project Description: Eastman 12th Ave - Fitzgerald to Oak
PI No: 0011974
Regional Project Id: HG-0423
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $18,295
Invoiced to Date: $15,306.34
Project Description: Eastman 11th Ave - Creighton to Pine Drive
PI No: 0011975
Regional Project Id: HG-0336
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $36,060
Invoiced to Date: $35,738.00
Project Description: Eastman Park St - 5th to 10th
PI No: 0011976
Regional Project Id: HG-0310
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $16,306
Invoiced to Date: $13,641.45
Project Description: Eastman Foster St - Hwy 46 to 3rd Ave
PI No: 0011977
Regional Project Id: HG-0311
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $5,674
Invoiced to Date: $4,746.82
Project Description: Eastman Foster St - Hwy 46 to Anson Ave
PI No: 0011978
Regional Project Id: HG-0350
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $30,094
Invoiced to Date: $25,169.26
Project Description: Eastman Golf Course Rd - Cochran Rd to Jack Johnson
PI No: 0011979
Regional Project Id: HG-0279
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $16,572
Invoiced to Date: $13,863.77
Project Description: Eastman Ogden St - 2nd to 5th
PI No: 0011980
Regional Project Id: HG-0282
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $9,545
Invoiced to Date: $7,985.54
Project Description: Eastman Livingston St - Leitch to Page
PI No: 0011981
Regional Project Id: HG-0290
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $17,287
Invoiced to Date: $14,462.68
Project Description: Eastman North St - Page to 14th Ave
PI No: 0011982
Regional Project Id: HG-0295
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $22,007
Invoiced to Date: $18,410.69
Project Description: Eastman Dorough St - 14th to Norman
PI No: 0011983
Regional Project Id: HG-0254
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $38,712
Invoiced to Date: $32,387.11
Project Description: Eastman 10th Ave - Forest Lake to 9th
PI No: 0011984
Regional Project Id: HG-0275
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $6,628
Invoiced to Date: $5,544.95
Project Description: Eastman 3rd Ave - Legion Dr to Delacy St
PI No: 0011985
Regional Project Id: HG-0353
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $13,257
Invoiced to Date: $11,090.58
Project Description: Eastman 10th Ave - Main to Oak
PI No: 0011986
Regional Project Id: HG-0348
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $11,269
Invoiced to Date: $9,427.81
Project Description: Eastman Greenwood St - 5th to 7th
PI No: 0011987
Regional Project Id: HG-0298
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $9,280
Invoiced to Date: $7,763.62
Project Description: Eastman Magnolia St - 5th to 3rd
PI No: 0011988
Regional Project Id: HG-0318
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $32,878
Invoiced to Date: $27,544.85
Project Description: Eastman 9th Ave - Page to City Limits
PI No: 0011989
Regional Project Id: HG-0337
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $30,094
Invoiced to Date: $25,169.26
Project Description: Eastman Pine St - 10th to 5th
PI No: 0011990
Regional Project Id: HG-0339
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $11,931
Invoiced to Date: $9,829.62
Project Description: Eastman 7th Ave - Oak St to Dead end
PI No: 0011991
Regional Project Id: HG-0354
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $11,534
Invoiced to Date: $9,649.72
Project Description: Eastman 12th Ave - Main to Oak
PI No: 0011992
Regional Project Id: HG-0355
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $10,871
Invoiced to Date: $9,095.24
Project Description: Eastman 13th Ave - Oak to Main
PI No: 0011993
Regional Project Id: HG-0346
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $13,257
Invoiced to Date: $11,090.58
Project Description: Eastman 14th Ave - Main to Oak
PI No: 0011994
Regional Project Id: HG-0356
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $16,306
Invoiced to Date: $13,641.45
Project Description: Eastman 8th Ave - Main to Oak
PI No: 0011995
Regional Project Id: HG-0357
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $13,655
Invoiced to Date: $11,424.17
Project Description: 7th Ave - Oak to Main
PI No: 0011996
Regional Project Id: HG-0358
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $12,197
Invoiced to Date: $10,204.23
Project Description: 6th Ave - Main to Oak
PI No: 0011997
Regional Project Id: HG-0362
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $9,015
Invoiced to Date: $7,542.71
Project Description: Eastman Hardin St - Page To Dead End
PI No: 0011998
Regional Project Id: HG-0249
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $10,340
Invoiced to Date: $10,248.00
Project Description: Eastman Minter Ct - Minter Dr to Dead end
PI No: 0011999
Regional Project Id: HG-0260
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $31,685
Invoiced to Date: $26,507.88
Project Description: Eastman Jessup St - 9th Ave to 4th Ave
PI No: 0012000
Regional Project Id: HG-0332
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $5,965
Invoiced to Date: $4,990.45
Project Description: Eastman Park Way - 5th Ave to Main
PI No: 0012006
Regional Project Id: HG-0317
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $44,015
Invoiced to Date: $3,939.06
Project Description: Eastman 9th Ave - Oak to Page
PI No: 0012008
Regional Project Id: HG-0302
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $7,689
Invoiced to Date: $6,433.73
Project Description: Eastman Oak Ct - Pine Haven to Dead End
PI No: 0012009
Regional Project Id: HG-0301
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $61,647
Invoiced to Date: $60,013.34
Project Description: Eastman 5th Ave - Odgen to Forest Lake Rd
PI No: 0012010
Regional Project Id: HG-0321
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $17,632
Invoiced to Date: $14,789.55
Project Description: Eastman Odgen Lane - 2nd to 5th
PI No: 0012014
Regional Project Id: HG-0281
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $11,391
Invoiced to Date: $9,529.67
Project Description: Eastman Clements St - 4th to 7th
PI No: 0012016
Regional Project Id: HG-0397
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $26,939
Invoiced to Date: $26,698.00
Project Description: Eastman Harrison St - 1st Ave to Nanacy
PI No: 0012017
Regional Project Id: HG-0409
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $11,931
Invoiced to Date: $9,829.62
Project Description: Eastman 1st Ave - 5th Ave to South Carolina
PI No: 0012020
Regional Project Id: HG-0376
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $17,500
Invoiced to Date: $14,640.88
Project Description: Eastman Locust Lane - Hawkinsville Rd to Dead End
PI No: 0012021
Regional Project Id: HG-0375
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $14,715
Invoiced to Date: $12,310.53
Project Description: Eastman Laurel Lane - Dead End to Dead End
PI No: 0012033
Regional Project Id: HG-0364
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $6,363
Invoiced to Date: $6,219.84
Project Description: Eastman Medical Center Dr - Legion to Griffin
PI No: 0012036
Regional Project Id: HG-0361
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $9,280
Invoiced to Date: $7,763.62
Project Description: Eastman 17th Ave - Main to Oak
PI No: 0012037
Regional Project Id: HG-0325
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $14,185
Invoiced to Date: $11,867.00
Project Description: Eastman Oak Forest Rd - Plaza to Dead End
PI No: 0012038
Regional Project Id: HG-0322
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $17,897
Invoiced to Date: $17,737.00
Project Description: Eastman Wright Dr - 2nd to 5th
PI No: 0012039
Regional Project Id: HG-0329
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $30,890
Invoiced to Date: $25,843.12
Project Description: Eastman 4th Ave - 5th to Main
PI No: 0012040
Regional Project Id: HG-0405
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $17,977
Invoiced to Date: $15,039.59
Project Description: Eastman Wendy Way - Nancy St to Russell St
PI No: 0012041
Regional Project Id: HG-0425
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $25,587
Invoiced to Date: $21,405.77
Project Description: Eastman Pine Dr - 9th to 12th
PI No: 0012042
Regional Project Id: HG-0292
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $53,030
Invoiced to Date: $44,353.82
Project Description: Eastman Sheldon St - Anson Ave to Dead End
PI No: 0012043
Regional Project Id: HG-0507
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $507,823
Invoiced to Date: $507,823.00
Project Description: Emanuel Extension Fairground Rd
PI No: 0012044
Regional Project Id: HG-0443
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 1:2013 to 2015
Original Project Budgeted: $840,000
Invoiced to Date: $814,500.25
Project Description: Emanuel Canoochee Rd
PI No: 0012045
Regional Project Id: HG-0493
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 3:2020 to 2022
Original Project Budgeted: $210,000
Invoiced to Date: $3,304.42
Project Description: Emanuel Odomville Church Rd
PI No: 0012046
Regional Project Id: HG-0464
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 2:2016 to 2019
Original Project Budgeted: $490,000
Invoiced to Date: $373,569.27
Project Description: Emanuel Meeks Rd
PI No: 0012047
Regional Project Id: HG-0473
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 2:2016 to 2019
Original Project Budgeted: $350,000
Invoiced to Date: $406,306.36
Project Description: Emanuel Quick Road
PI No: 0012048
Regional Project Id: HG-0482
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 2:2016 to 2019
Original Project Budgeted: $840,000
Invoiced to Date: $786,851.81
Project Description: Emanuel Old Kenfield Rd
PI No: 0012049
Regional Project Id: HG-0430
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 3:2020 to 2022
Original Project Budgeted: $924,000
Invoiced to Date: $895,121.62
Project Description: Emanuel Old Savannah Rd
PI No: 0012050
Regional Project Id: HG-0479
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 3:2020 to 2022
Original Project Budgeted: $490,000
Invoiced to Date: $0
Project Description: Emanuel Pendleton Springs Rd
PI No: 0012051
Regional Project Id: HG-0467
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 2:2016 to 2019
Original Project Budgeted: $378,000
Invoiced to Date: $222,312.12
Project Description: Emanuel Parrish Pond Rd
PI No: 0012052
Regional Project Id: HG-0516
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $42,000
Invoiced to Date: $23,596.08
Project Description: Garfield Old Augusta Rd
PI No: 0012053
Regional Project Id: HG-0522
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $27,128
Invoiced to Date: $16,059.07
Project Description: Garfield Sybil Street
PI No: 0012054
Regional Project Id: HG-0524
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $86,800
Invoiced to Date: $85,977.15
Project Description: Swainsboro North Green Street
PI No: 0012055
Regional Project Id: HG-0525
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $168,000
Invoiced to Date: $166,498.00
Project Description: Swainsboro Lambs Bridge Road
PI No: 0012056
Regional Project Id: HG-0526
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $122,080
Invoiced to Date: $113,396.59
Project Description: Swainsboro North Coleman St
PI No: 0012057
Regional Project Id: HG-0530
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $224,000
Invoiced to Date: $224,000.00
Project Description: Swainsboro Meadow Lake East
PI No: 0012058
Regional Project Id: HG-0531
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $184,800
Invoiced to Date: $184,800.00
Project Description: Swainsboro King Circle Dr
PI No: 0012059
Regional Project Id: HG-0552
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $42,000
Invoiced to Date: $42,000.00
Project Description: Swainsboro Braswell Blvd
PI No: 0012060
Regional Project Id: HG-0553
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $28,000
Invoiced to Date: $13,623.72
Project Description: Swainsboro Short Street
PI No: 0012061
Regional Project Id: HG-0529
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019
Original Project Budgeted: $299,864
Invoiced to Date: $297,183.00
Project Description: Swainsboro Downtown Sidewalk and Streetscape (Part)
PI No: 0012062
Regional Project Id: HG-0532
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $154,000
Invoiced to Date: $145,729.65
Project Description: Swainsboro Industrial Way
PI No: 0012063
Regional Project Id: HG-0537
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $56,000
Invoiced to Date: $32,476.03
Project Description: Swainsboro Fortune Loop
PI No: 0012064
Regional Project Id: HG-0539
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $56,000
Invoiced to Date: $30,886.50
Project Description: Swainsboro Hill St
PI No: 0012065
Regional Project Id: HG-0546
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $156,800
Invoiced to Date: $138,845.14
Project Description: Swainsboro Thigpen Dr
PI No: 0012066
Regional Project Id: HG-0551
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $112,000
Invoiced to Date: $76,856.02
Project Description: Swainsboro Oaklawn Dr
PI No: 0012067
Regional Project Id: HG-0554
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $56,000
Invoiced to Date: $50,806.61
Project Description: Swainsboro William Rountree St
PI No: 0012068
Regional Project Id: HG-0555
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $70,000
Invoiced to Date: $32,160.36
Project Description: Swainsboro Howard St
PI No: 0012069
Regional Project Id: HG-0536
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $84,000
Invoiced to Date: $54,447.96
Project Description: Swainsboro Prosperity Dr
PI No: 0012070
Regional Project Id: HG-0538
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $224,000
Invoiced to Date: $221,997.00
Project Description: Swainsboro West Meadow Lake
PI No: 0012071
Regional Project Id: HG-0540
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $112,000
Invoiced to Date: $86,125.42
Project Description: Swainsboro Arden Dr
PI No: 0012072
Regional Project Id: HG-0533
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $196,000
Invoiced to Date: $164,135.82
Project Description: Swainsboro Race Track St
PI No: 0012073
Regional Project Id: HG-0534
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $147,000
Invoiced to Date: $68,054.54
Project Description: Swainsboro Martin Luther King Jr
PI No: 0012074
Regional Project Id: HG-0543
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $126,000
Invoiced to Date: $118,740.56
Project Description: Swainsboro Mcleod Bridge Rd
PI No: 0012075
Regional Project Id: HG-0544
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $210,000
Invoiced to Date: $176,907.65
Project Description: Swainsboro Old Nunez Rd
PI No: 0012076
Regional Project Id: HG-0545
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $14,000
Invoiced to Date: $13,875.00
Project Description: Swainsboro East Moring St
PI No: 0012077
Regional Project Id: HG-0547
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $63,000
Invoiced to Date: $62,437.00
Project Description: Swainsboro Lake Luck Dr
PI No: 0012078
Regional Project Id: HG-0549
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $289,800
Invoiced to Date: $263,497.67
Project Description: Swainsboro Kite Rd
PI No: 0012079
Regional Project Id: HG-0550
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $56,000
Invoiced to Date: $32,517.13
Project Description: Swainsboro Moreland Ave
PI No: 0012080
Regional Project Id: HG-0570
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019
Original Project Budgeted: $985,000
Invoiced to Date: $969,849.96
Project Description: Evans Reg Replace Bridge over Bull Creek on Sunbury R
PI No: 0012081
Regional Project Id: HG-0571
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019
Original Project Budgeted: $580,000
Invoiced to Date: $568,477.42
Project Description: Evans Reg Replace Bridge over Scotts Creek on Daisy N
PI No: 0012082
Regional Project Id: HG-0564
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $434,000
Invoiced to Date: $364,650.83
Project Description: Evans Reg Bill Hodges Rd Resurfacing
PI No: 0012083
Regional Project Id: HG-0565
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $70,000
Invoiced to Date: $54,850.47
Project Description: EvansReg Commercial Blvd Resurfacing
PI No: 0012084
Regional Project Id: HG-0572
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $154,000
Invoiced to Date: $152,623.00
Project Description: Evans FE Beasly Rd
PI No: 0012085
Regional Project Id: HG-0574
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $504,000
Invoiced to Date: $391,755.16
Project Description: Evans Bowen Rd
PI No: 0012086
Regional Project Id: HG-0566
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $252,000
Invoiced to Date: $209,526.62
Project Description: EvansReg John W. Tippins Rd Resurfacing
PI No: 0012087
Regional Project Id: HG-0575
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $266,000
Invoiced to Date: $262,010.00
Project Description: Evans Stafford Rd
PI No: 0012088
Regional Project Id: HG-0577
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $154,000
Invoiced to Date: $151,690.00
Project Description: Evans Lex Strickland Rd
PI No: 0012089
Regional Project Id: HG-0578
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $56,000
Invoiced to Date: $55,160.00
Project Description: Evans Melissa Circle
PI No: 0012090
Regional Project Id: HG-0593
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $17,898
Invoiced to Date: $17,559.00
Project Description: Bellville Hugh Brewton St - (Part) (East City Limits West 675 ft)
PI No: 0012091
Regional Project Id: HG-0595
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $42,969
Invoiced to Date: $37,150.84
Project Description: Bellville Henry Street - Buckcravey Dr
PI No: 0012092
Regional Project Id: HG-0596
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $27,708
Invoiced to Date: $21,726.17
Project Description: Claxton Perry Lee Deloach
PI No: 0012093
Regional Project Id: HG-0597
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $15,297
Invoiced to Date: $613.91
Project Description: Claxton West Liberty Street Seg 1
PI No: 0012094
Regional Project Id: HG-0598
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $47,980
Invoiced to Date: $1,929.33
Project Description: Claxton West Liberty Street Seg 2
PI No: 0012095
Regional Project Id: HG-0599
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $22,323
Invoiced to Date: $20,404.94
Project Description: Claxton West Liberty Street Seg 3
PI No: 0012096
Regional Project Id: HG-0600
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $61,994
Invoiced to Date: $40,168.45
Project Description: Claxton West Liberty Street Seg 4
PI No: 0012097
Regional Project Id: HG-0601
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $29,531
Invoiced to Date: $20,655.80
Project Description: Claxton West Liberty Street Seg 5
PI No: 0012098
Regional Project Id: HG-0602
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $29,942
Invoiced to Date: $19,471.74
Project Description: Claxton Courthouse St
PI No: 0012099
Regional Project Id: HG-0603
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $7,772
Invoiced to Date: $9,384.34
Project Description: Claxton Turnpike Rd
PI No: 0012100
Regional Project Id: HG-0604
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $48,374
Invoiced to Date: $24,055.83
Project Description: Claxton North Peters St
PI No: 0012101
Regional Project Id: HG-0605
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $28,613
Invoiced to Date: $26,744.98
Project Description: Claxton North College St Seg 1
PI No: 0012102
Regional Project Id: HG-0606
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $20,565
Invoiced to Date: $22,909.12
Project Description: Claxton North College Street Seg 2
PI No: 0012103
Regional Project Id: HG-0607
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $11,287
Invoiced to Date: $12,113.45
Project Description: Claxton North Clark St
PI No: 0012104
Regional Project Id: HG-0608
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $21,329
Invoiced to Date: $21,461.90
Project Description: Claxton South Clark St
PI No: 0012105
Regional Project Id: HG-0609
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $21,371
Invoiced to Date: $17,026.79
Project Description: Claxton South Clark Street
PI No: 0012106
Regional Project Id: HG-0610
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $112,673
Invoiced to Date: $108,793.41
Project Description: Claxton Church St
PI No: 0012107
Regional Project Id: HG-0611
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $85,800
Invoiced to Date: $92,228.91
Project Description: Claxton S College St
PI No: 0012108
Regional Project Id: HG-0612
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $22,629
Invoiced to Date: $21,724.72
Project Description: Claxton S Ralph St
PI No: 0012109
Regional Project Id: HG-0613
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,989
Invoiced to Date: $10,661.92
Project Description: Claxton City Hall Alley
PI No: 0012110
Regional Project Id: HG-0614
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $40,600
Invoiced to Date: $1,882.90
Project Description: Claxton Barnes St
PI No: 0012111
Regional Project Id: HG-0615
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $13,881
Invoiced to Date: $14,420.56
Project Description: Claxton Freeman St
PI No: 0012112
Regional Project Id: HG-0616
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $63,169
Invoiced to Date: $51,498.41
Project Description: Claxton S Claxton Ave
PI No: 0012113
Regional Project Id: HG-0617
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $29,617
Invoiced to Date: $23,417.51
Project Description: Claxton Ridge Street
PI No: 0012114
Regional Project Id: HG-0618
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $120,733
Invoiced to Date: $4,908.29
Project Description: Claxton E Long St
PI No: 0012115
Regional Project Id: HG-0619
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $10,642
Invoiced to Date: $425.00
Project Description: Claxton Bowen Lane
PI No: 0012116
Regional Project Id: HG-0621
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $82,197
Invoiced to Date: $64,701.60
Project Description: Claxton S Peters St
PI No: 0012117
Regional Project Id: HG-0623
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $34,035
Invoiced to Date: $11,892.10
Project Description: Claxton E Smith St - (Part) (S. Newton St. to Anderson Ave.)
PI No: 0012118
Regional Project Id: HG-0629
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $15,900
Invoiced to Date: $14,097.65
Project Description: Daisy East Main St.
PI No: 0012119
Regional Project Id: HG-0628
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $18,200
Invoiced to Date: $36,380.88
Project Description: Daisy East Railroad St
PI No: 0012120
Regional Project Id: HG-0627
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $25,189
Invoiced to Date: $24,006.56
Project Description: Daisy West Railroad St
PI No: 0012121
Regional Project Id: HG-0631
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $68,800
Invoiced to Date: $61,402.04
Project Description: Hagan Cedar Ave - Tattnall St to City Limits
PI No: 0012122
Regional Project Id: HG-0632
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $93,800
Invoiced to Date: $63,971.91
Project Description: Hagan Turnpike Rd - Hodges St to City Limts
PI No: 0012123
Regional Project Id: HG-0633
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $39,200
Invoiced to Date: $25,582.11
Project Description: Hagan Hodges St - Hwy 280 to City Limits
PI No: 0012124
Regional Project Id: HG-0634
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $74,200
Invoiced to Date: $57,947.12
Project Description: Hagan Old Dublin Rd - Cemetery to Old Metter Hwy
PI No: 0012125
Regional Project Id: HG-0635
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $19,600
Invoiced to Date: $17,317.53
Project Description: Hagan Pine Ave - Brewton to Hodges
PI No: 0012126
Regional Project Id: HG-0636
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $30,800
Invoiced to Date: $26,135.97
Project Description: Hagan Cemetery Rd - Turnpike to Old Dublin
PI No: 0012127
Regional Project Id: HG-0637
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $7,000
Invoiced to Date: $5,146.83
Project Description: Hagan Calhoun Street
PI No: 0012128
Regional Project Id: HG-0630
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $68,600
Invoiced to Date: $46,371.23
Project Description: Hagan South Railroad Ave -Perkins Mill to Calhoun St
PI No: 0012129
Regional Project Id: HG-0638
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $37,800
Invoiced to Date: $32,581.44
Project Description: Hagan Hodges St - Hwy 280 to Cedar
PI No: 0012130
Regional Project Id: HG-0657
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $9,800
Invoiced to Date: $9,712.00
Project Description: Hagan Smith St - Hwy 280 to Turnpike
PI No: 0012131
Regional Project Id: HG-0664
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $99,400
Invoiced to Date: $97,517.00
Project Description: Jeff Davis CA Holmes Rd
PI No: 0012132
Regional Project Id: HG-0681
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $143,800
Invoiced to Date: $141,076.00
Project Description: Jeff Davis John Long Rd
PI No: 0012133
Regional Project Id: HG-0677
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $938,980
Invoiced to Date: $930,585.00
Project Description: Jeff Davis Bridgeford Church Rd - CR 296
PI No: 0012134
Regional Project Id: HG-0675
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $537,600
Invoiced to Date: $532,794.00
Project Description: Jeff Davis Pat Dixon Rd
PI No: 0012135
Regional Project Id: HG-0670
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $75,600
Invoiced to Date: $74,168.00
Project Description: Jeff Davis Buford Rd - CR 280
PI No: 0012136
Regional Project Id: HG-0676
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $80,080
Invoiced to Date: $78,563.00
Project Description: Jeff Davis John Osburne Rd
PI No: 0012137
Regional Project Id: HG-0669
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $323,120
Invoiced to Date: $317,000.00
Project Description: Jeff Davis JA Yawn Rd - CR 245
PI No: 0012138
Regional Project Id: HG-0666
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $637,420
Invoiced to Date: $631,721.00
Project Description: Jeff Davis WH Smith Rd - CR 38 and 297
PI No: 0012139
Regional Project Id: HG-0671
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $78,680
Invoiced to Date: $77,190.00
Project Description: Jeff Davis McDaniel Rd - CR 249
PI No: 0012140
Regional Project Id: HG-0667
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $547,200
Invoiced to Date: $538,992.00
Project Description: Jeff Davis Philadelphia Church Rd - CR 294
PI No: 0012141
Regional Project Id: HG-0672
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $245,000
Invoiced to Date: $241,325.00
Project Description: Jeff Davis Satilla Church Rd
PI No: 0012142
Regional Project Id: HG-0691
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $412,975
Invoiced to Date: $406,780.00
Project Description: Jeff Davis Elizabeth Church Rd
PI No: 0012143
Regional Project Id: HG-0695
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $84,000
Invoiced to Date: $82,409.00
Project Description: Hazlehurst North Miller St
PI No: 0012144
Regional Project Id: HG-0696
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $112,000
Invoiced to Date: $109,879.00
Project Description: Hazlehurst Latimer St
PI No: 0012145
Regional Project Id: HG-0697
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $98,000
Invoiced to Date: $96,112.94
Project Description: Hazlehurst West Odum St
PI No: 0012146
Regional Project Id: HG-0698
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $42,000
Invoiced to Date: $40,913.63
Project Description: Hazlehurst Pat Dixon Rd
PI No: 0012147
Regional Project Id: HG-0699
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $245,000
Invoiced to Date: $193,546.34
Project Description: Hazlehurst Hatten Still Rd
PI No: 0012148
Regional Project Id: HG-0700
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $56,000
Invoiced to Date: $54,824.93
Project Description: Hazlehurst Pine St
PI No: 0012149
Regional Project Id: HG-0701
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $56,000
Invoiced to Date: $33,254.19
Project Description: Hazlehurst Hester St
PI No: 0012150
Regional Project Id: HG-0702
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $98,000
Invoiced to Date: $74,889.97
Project Description: Hazlehurst Girtman St
PI No: 0012151
Regional Project Id: HG-0703
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $168,000
Invoiced to Date: $166,498.00
Project Description: Hazlehurst Williams St
PI No: 0012152
Regional Project Id: HG-0704
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $105,000
Invoiced to Date: $91,923.03
Project Description: Hazlehurst Martin Luther King Jr Dr
PI No: 0012153
Regional Project Id: HG-0705
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019
Original Project Budgeted: $7,500
Invoiced to Date: $7,432.50
Project Description: Hazlehurst South Tallahassee St - sidewalk
PI No: 0012154
Regional Project Id: HG-0706
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019
Original Project Budgeted: $45,000
Invoiced to Date: $41,497.29
Project Description: Hazlehurst Burketts Ferry Sidewalk
PI No: 0012155
Regional Project Id: HG-0707
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019
Original Project Budgeted: $125,000
Invoiced to Date: $122,169.43
Project Description: Hazlehurst Collins St Sidewalk
PI No: 0012156
Regional Project Id: HG-0708
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $98,000
Invoiced to Date: $49,741.82
Project Description: Hazlehurst Kersey St
PI No: 0012157
Regional Project Id: HG-0709
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $21,000
Invoiced to Date: $22,087.70
Project Description: Hazlehurst Sycamore St
PI No: 0012158
Regional Project Id: HG-0710
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $84,000
Invoiced to Date: $82,978.32
Project Description: Hazlehurst East Plum St
PI No: 0012159
Regional Project Id: HG-0711
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $98,000
Invoiced to Date: $93,556.24
Project Description: Hazlehurst Collins St
PI No: 0012160
Regional Project Id: HG-0712
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $140,000
Invoiced to Date: $92,616.00
Project Description: Hazlehurst Wilson St
PI No: 0012161
Regional Project Id: HG-0736
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015
Original Project Budgeted: $148,000
Invoiced to Date: $119,030.01
Project Description: Johnson Glen Donaldson Rd
PI No: 0012162
Regional Project Id: HG-0734
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015
Original Project Budgeted: $48,000
Invoiced to Date: $36,769.52
Project Description: Johnson Faith Tabernacle Rd
PI No: 0012163
Regional Project Id: HG-0733
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015
Original Project Budgeted: $168,000
Invoiced to Date: $145,921.50
Project Description: Johnson Calvary Church Rd
PI No: 0012164
Regional Project Id: HG-0745
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019
Original Project Budgeted: $284,000
Invoiced to Date: $224,776.00
Project Description: Johnson Snells Bridge Rd
PI No: 0012165
Regional Project Id: HG-0735
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015
Original Project Budgeted: $92,000
Invoiced to Date: $89,466.92
Project Description: Johnson Trinity Church Rd
PI No: 0012166
Regional Project Id: HG-0739
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015
Original Project Budgeted: $144,000
Invoiced to Date: $119,765.02
Project Description: Johnson James Grove Church Rd
PI No: 0012167
Regional Project Id: HG-0737
County: Johnson
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019
Original Project Budgeted: $320,000
Invoiced to Date: $241,161.50
Project Description: Johnson Cross Cedar Rd Seg 1
PI No: 0012168
Regional Project Id: HG-0738
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019
Original Project Budgeted: $212,000
Invoiced to Date: $160,707.50
Project Description: Johnson Cross Cedar Rd Seg 2
PI No: 0012169
Regional Project Id: HG-0747
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $574,000
Invoiced to Date: $0
Project Description: Johnson Tuckers Grove Church Rd Ph 1
PI No: 0012170
Regional Project Id: HG-0741
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 3:2020 to 2022
Original Project Budgeted: $200,000
Invoiced to Date: $185,316.40
Project Description: Johnson Pringle Rd
PI No: 0012171
Regional Project Id: HG-0750
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $42,000
Invoiced to Date: $25,351.89
Project Description: Kite College St Priority 1
PI No: 0012172
Regional Project Id: HG-0751
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $17,500
Invoiced to Date: $15,629.00
Project Description: Kite Ohoopee St Pr 2
PI No: 0012173
Regional Project Id: HG-0752
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $9,350
Invoiced to Date: $10,386.00
Project Description: Kite Claxton Blvd
PI No: 0012174
Regional Project Id: HG-0753
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $28,000
Invoiced to Date: $0
Project Description: Kite Hatcher St
PI No: 0012175
Regional Project Id: HG-0766
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $245,000
Invoiced to Date: $208,644.05
Project Description: Wrightsville Idylwild Dr
PI No: 0012176
Regional Project Id: HG-0765
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2013 to 2015
Original Project Budgeted: $250,000
Invoiced to Date: $249,912.54
Project Description: Wrightsville Sidewalk Repair (Rapid Response)
PI No: 0012177
Regional Project Id: HG-0764
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $290,000
Invoiced to Date: $287,407.00
Project Description: Wrightsville Flanders Lynn Jan and Helen Sts
PI No: 0012178
Regional Project Id: HG-0763
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $172,000
Invoiced to Date: $169,502.75
Project Description: Wrightsville Lakeview Dr
PI No: 0012179
Regional Project Id: HG-0762
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $65,500
Invoiced to Date: $53,766.54
Project Description: Wrightsville Lee St
PI No: 0012180
Regional Project Id: HG-0761
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $185,000
Invoiced to Date: $114,786.50
Project Description: Wrightsville Myrtle Ave
PI No: 0012181
Regional Project Id: HG-0767
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $263,000
Invoiced to Date: $143,311.40
Project Description: Wrightsville Court St
PI No: 0012182
Regional Project Id: HG-0768
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $46,000
Invoiced to Date: $32,410.46
Project Description: Wrightsville Georgia Ave
PI No: 0012183
Regional Project Id: HG-0770
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $47,000
Invoiced to Date: $1,388.85
Project Description: Wrightsville Bradford St
PI No: 0012184
Regional Project Id: HG-0775
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015
Original Project Budgeted: $162,500
Invoiced to Date: $160,163.00
Project Description: Laurens Springhaven Bridge
PI No: 0012185
Regional Project Id: HG-0774
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $725,000
Invoiced to Date: $714,574.00
Project Description: Laurens Springhaven Rd
PI No: 0012186
Regional Project Id: HG-0776
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015
Original Project Budgeted: $487,500
Invoiced to Date: $480,489.00
Project Description: Laurens Walke Dairy Bridge
PI No: 0012188
Regional Project Id: HG-0781
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $1,040,000
Invoiced to Date: $472,434.80
Project Description: Old Hawkinsville Rd
PI No: 0012189
Regional Project Id: HG-0780
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $637,800
Invoiced to Date: $632,098.00
Project Description: Laurens Country Club Rd
PI No: 0012190
Regional Project Id: HG-0779
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $565,600
Invoiced to Date: $316,072.42
Project Description: Laurens Valambrosia Arthur Wolf Rd
PI No: 0012191
Regional Project Id: HG-0786
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $933,000
Invoiced to Date: $932,560.00
Project Description: Laurens Butler Rd
PI No: 0012192
Regional Project Id: HG-0798
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $630,000
Invoiced to Date: $233,557.69
Project Description: Laurens Watkins Hall Rd
PI No: 0012193
Regional Project Id: HG-0787
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $600,000
Invoiced to Date: $3,636.00
Project Description: Laurens Thairdell Rd
PI No: 0012194
Regional Project Id: HG-0788
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $831,000
Invoiced to Date: $823,570.00
Project Description: Laurens Stanley Cemetery Rd
PI No: 0012195
Regional Project Id: HG-0789
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $543,000
Invoiced to Date: $0
Project Description: Laurens Anderson Rd
PI No: 0012196
Regional Project Id: HG-0793
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $600,600
Invoiced to Date: $595,230.00
Project Description: Laurens Dublin Eastman Rd
PI No: 0012197
Regional Project Id: HG-0802
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $637,000
Invoiced to Date: $339,797.63
Project Description: Laurens Mark Wood Rd
PI No: 0012198
Regional Project Id: HG-0807
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $1,117,200
Invoiced to Date: $901,246.88
Project Description: Laurens Old Toomsboro Rd
PI No: 0012199
Regional Project Id: HG-0792
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $1,173,200
Invoiced to Date: $773,557.65
Project Description: Laurens Rock Springs Rd
PI No: 0012200
Regional Project Id: HG-0805
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $162,292
Invoiced to Date: $160,841.00
Project Description: Laurens Ed Becham Rd
PI No: 0012201
Regional Project Id: HG-0812
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $17,712
Invoiced to Date: $17,157.71
Project Description: Cadwell Coleman St Seg 1
PI No: 0012202
Regional Project Id: HG-0813
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $16,837
Invoiced to Date: $14,416.23
Project Description: Cadwell Coleman St Seg 2
PI No: 0012203
Regional Project Id: HG-0808
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $13,151
Invoiced to Date: $15,639.07
Project Description: Cadwell Colter St
PI No: 0012204
Regional Project Id: HG-0809
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $12,833
Invoiced to Date: $10,421.53
Project Description: Cadwell Snowhill St - Hwy 117 to Railroad
PI No: 0012205
Regional Project Id: HG-0814
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $12,674
Invoiced to Date: $21,054.50
Project Description: Cadwell Coleman St Seg 3
PI No: 0012206
Regional Project Id: HG-0811
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $12,249
Invoiced to Date: $13,215.25
Project Description: Cadwell Walnut St - Hwy 126 to Snowhill
PI No: 0012207
Regional Project Id: HG-0815
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $25,162
Invoiced to Date: $20,334.55
Project Description: Cadwell Coleman St Seg 4
PI No: 0012208
Regional Project Id: HG-0810
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $25,321
Invoiced to Date: $22,887.95
Project Description: Cadwell Walnut McCook St
PI No: 0012209
Regional Project Id: HG-0816
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $30,014
Invoiced to Date: $20,214.99
Project Description: Cadwell Coleman St Seg 5
PI No: 0012210
Regional Project Id: HG-0818
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $46,339
Invoiced to Date: $31,813.07
Project Description: Dexter Shy St - Hwy 339 to Cemetery
PI No: 0012211
Regional Project Id: HG-0819
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $59,005
Invoiced to Date: $35,043.27
Project Description: Dexter Railroad St
PI No: 0012212
Regional Project Id: HG-0821
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $50,024
Invoiced to Date: $48,456.13
Project Description: Dexter Harvey St Seg 1
PI No: 0012213
Regional Project Id: HG-0825
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $30,182
Invoiced to Date: $32,986.88
Project Description: Dexter Harvey St Seg 2
PI No: 0012214
Regional Project Id: HG-0822
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $40,752
Invoiced to Date: $25,169.13
Project Description: Dexter Bryant St Seg 1
PI No: 0012215
Regional Project Id: HG-0826
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $13,255
Invoiced to Date: $0
Project Description: Dexter Bryant St Seg 2
PI No: 0012216
Regional Project Id: HG-0831
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 1:2013 to 2015
Original Project Budgeted: $1,130,000
Invoiced to Date: $1,135,867.42
Project Description: Dublin Hodges St
PI No: 0012217
Regional Project Id: HG-0830
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 2:2016 to 2019
Original Project Budgeted: $575,000
Invoiced to Date: $271,051.48
Project Description: Dublin Springdale Rd
PI No: 0012218
Regional Project Id: HG-0832
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 3:2020 to 2022
Original Project Budgeted: $3,530,000
Invoiced to Date: $1,144,594.61
Project Description: Dublin Stubbs Park Rd
PI No: 0012219
Regional Project Id: HG-0834
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $24,287
Invoiced to Date: $22,653.01
Project Description: Dudley Seventh St
PI No: 0012220
Regional Project Id: HG-0838
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $22,617
Invoiced to Date: $13,202.19
Project Description: Dudley Caroll Dr
PI No: 0012221
Regional Project Id: HG-0837
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $15,352
Invoiced to Date: $11,087.78
Project Description: Dudley Chestnut Dr
PI No: 0012222
Regional Project Id: HG-0833
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $12,462
Invoiced to Date: $7,673.26
Project Description: Dudley Carroll St
PI No: 0012223
Regional Project Id: HG-0840
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $36,882
Invoiced to Date: $30,282.88
Project Description: Dudley West St
PI No: 0012224
Regional Project Id: HG-0835
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $34,920
Invoiced to Date: $31,652.00
Project Description: Dudley Pecan St
PI No: 0012225
Regional Project Id: HG-0839
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $77,820
Invoiced to Date: $1,023.24
Project Description: Dudley Oak St
PI No: 0012226
Regional Project Id: HG-0873
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $61,992
Invoiced to Date: $35,888.78
Project Description: East Dublin Circle Dr
PI No: 0012227
Regional Project Id: HG-0842
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $41,231
Invoiced to Date: $24,218.21
Project Description: East Dublin Celia St
PI No: 0012228
Regional Project Id: HG-0843
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $22,246
Invoiced to Date: $10,431.15
Project Description: East Dublin Dwayne Dr
PI No: 0012229
Regional Project Id: HG-0845
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $17,023
Invoiced to Date: $11,892.31
Project Description: East Dublin Price St
PI No: 0012230
Regional Project Id: HG-0846
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $26,780
Invoiced to Date: $25,343.10
Project Description: East Dublin South Elm St
PI No: 0012231
Regional Project Id: HG-0844
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $46,269
Invoiced to Date: $29,493.28
Project Description: East Dublin Rice St
PI No: 0012232
Regional Project Id: HG-0847
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $31,182
Invoiced to Date: $20,978.00
Project Description: East Dublin Keen St
PI No: 0012233
Regional Project Id: HG-0848
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $7,955
Invoiced to Date: $10,371.00
Project Description: East Dublin Stanley St
PI No: 0012234
Regional Project Id: HG-0849
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $28,159
Invoiced to Date: $20,934.00
Project Description: East Dublin Virginia St
PI No: 0012235
Regional Project Id: HG-0850
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $32,640
Invoiced to Date: $26,149.00
Project Description: East Dublin Daley St
PI No: 0012236
Regional Project Id: HG-0851
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $25,905
Invoiced to Date: $26,051.00
Project Description: East Dublin Joiner St
PI No: 0012237
Regional Project Id: HG-0852
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $28,239
Invoiced to Date: $22,985.00
Project Description: East Dublin Derriso Ln
PI No: 0012238
Regional Project Id: HG-0853
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $39,189
Invoiced to Date: $31,369.00
Project Description: East Dublin North Elm St
PI No: 0012239
Regional Project Id: HG-0856
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $20,417
Invoiced to Date: $0
Project Description: East Dublin Piedmont Dr
PI No: 0012240
Regional Project Id: HG-0857
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $11,136
Invoiced to Date: $10,424.50
Project Description: East Dublin Torino Dr
PI No: 0012241
Regional Project Id: HG-0858
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $8,670
Invoiced to Date: $10,401.00
Project Description: East Dublin Falcon Dr
PI No: 0012242
Regional Project Id: HG-0874
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $31,845
Invoiced to Date: $26,113.00
Project Description: East Dublin Glen Dr
PI No: 0012243
Regional Project Id: HG-0872
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $11,375
Invoiced to Date: $10,477.50
Project Description: East Dublin Lewis St
PI No: 0012244
Regional Project Id: HG-0876
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $72,678
Invoiced to Date: $57,481.00
Project Description: East Dublin Attaway
PI No: 0012245
Regional Project Id: HG-0877
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $32,905
Invoiced to Date: $26,138.00
Project Description: East Dublin West Drive
PI No: 0012246
Regional Project Id: HG-0859
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $28,371
Invoiced to Date: $26,087.00
Project Description: East Dublin Atwood Dr
PI No: 0012247
Regional Project Id: HG-0860
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $23,227
Invoiced to Date: $29,332.00
Project Description: East Dublin Jordan St
PI No: 0012248
Regional Project Id: HG-0861
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $58,811
Invoiced to Date: $46,209.00
Project Description: East Dublin Marion St
PI No: 0012249
Regional Project Id: HG-0862
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $37,121
Invoiced to Date: $30,228.00
Project Description: East Dublin Braham St
PI No: 0012250
Regional Project Id: HG-0863
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $18,905
Invoiced to Date: $15,218.45
Project Description: East Dublin Rosewood Dr
PI No: 0012251
Regional Project Id: HG-0864
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $38,420
Invoiced to Date: $19,099.00
Project Description: East Dublin Larsen St
PI No: 0012252
Regional Project Id: HG-0865
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $18,110
Invoiced to Date: $13,730.00
Project Description: East Dublin South Dr
PI No: 0012253
Regional Project Id: HG-0866
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $109,269
Invoiced to Date: $93,922.70
Project Description: East Dublin Buckingham
PI No: 0012254
Regional Project Id: HG-0895
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $34,894
Invoiced to Date: $0
Project Description: East Dublin Powell Dr
PI No: 0012255
Regional Project Id: HG-0867
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $35,901
Invoiced to Date: $0
Project Description: East Dublin Ferry St Seg 1
PI No: 0012256
Regional Project Id: HG-0868
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $34,523
Invoiced to Date: $0
Project Description: East Dublin Getty St
PI No: 0012257
Regional Project Id: HG-0869
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $12,144
Invoiced to Date: $0
Project Description: East Dublin Taylor Ln
PI No: 0012258
Regional Project Id: HG-0870
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $62,008
Invoiced to Date: $0
Project Description: East Dublin Poplar St
PI No: 0012259
Regional Project Id: HG-0871
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $33,303
Invoiced to Date: $0
Project Description: East Dublin Stewart St
PI No: 0012260
Regional Project Id: HG-0875
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $20,549
Invoiced to Date: $18,774.00
Project Description: East Dublin Dorsey St
PI No: 0012261
Regional Project Id: HG-0878
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $25,826
Invoiced to Date: $0
Project Description: East Dublin Jackson St
PI No: 0012262
Regional Project Id: HG-0879
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $28,769
Invoiced to Date: $0
Project Description: East Dublin Ferry St Seg 2 - Part (Circle Dr to Johnson St)
PI No: 0012263
Regional Project Id: HG-0899
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $42,000
Invoiced to Date: $30,574.90
Project Description: Montrose Spur One
PI No: 0012264
Regional Project Id: HG-0896
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $30,606
Invoiced to Date: $26,604.38
Project Description: Montrose Railroad St - Part (.22 mile)
PI No: 0012265
Regional Project Id: HG-0909
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $16,465
Invoiced to Date: $15,709.29
Project Description: Rentz Pughsley Ave
PI No: 0012266
Regional Project Id: HG-0902
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $16,121
Invoiced to Date: $14,684.86
Project Description: Rentz Bedingfield St
PI No: 0012267
Regional Project Id: HG-0900
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $21,901
Invoiced to Date: $20,892.87
Project Description: Rentz Bates Ave Seg 1
PI No: 0012268
Regional Project Id: HG-0910
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $24,791
Invoiced to Date: $34,709.08
Project Description: Rentz West Railroad St
PI No: 0012269
Regional Project Id: HG-0911
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $27,973
Invoiced to Date: $21,397.68
Project Description: Rentz Simpson Ave
PI No: 0012270
Regional Project Id: HG-0904
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $34,946
Invoiced to Date: $0
Project Description: Rentz Circle Dr
PI No: 0012271
Regional Project Id: HG-0912
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $338,997
Invoiced to Date: $206,897.13
Project Description: Montgomery Thompson Pond Rd Ph 1
PI No: 0012272
Regional Project Id: HG-0913
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $443,520
Invoiced to Date: $316,285.02
Project Description: Montgomery Thompson Pond Rd Ph 2
PI No: 0012273
Regional Project Id: HG-0914
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $525,000
Invoiced to Date: $421,417.69
Project Description: Montgomery Thompson Pond Rd Ph 3
PI No: 0012274
Regional Project Id: HG-0915
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $525,000
Invoiced to Date: $471,777.35
Project Description: Montgomery Thompson Pond Rd Ph 4
PI No: 0012275
Regional Project Id: HG-0916
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $316,538
Invoiced to Date: $336,207.20
Project Description: Montgomery Taylor Springs Rd
PI No: 0012276
Regional Project Id: HG-0935
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2013 to 2015
Original Project Budgeted: $10,000
Invoiced to Date: $8,914.65
Project Description: Ailey West MLK Jr St Sidewalk (Rapid Response)
PI No: 0012277
Regional Project Id: HG-0934
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2013 to 2015
Original Project Budgeted: $10,000
Invoiced to Date: $8,009.85
Project Description: Ailey East MLK Jr Sidewalks (Rapid Response)
PI No: 0012278
Regional Project Id: HG-0933
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2013 to 2015
Original Project Budgeted: $20,000
Invoiced to Date: $18,197.77
Project Description: Ailey South Broad St sidewalk (Rapid Response)
PI No: 0012279
Regional Project Id: HG-0931
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $32,000
Invoiced to Date: $29,443.08
Project Description: Ailey East Gum St
PI No: 0012280
Regional Project Id: HG-0932
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $16,000
Invoiced to Date: $15,857.00
Project Description: Ailey S Lee St
PI No: 0012281
Regional Project Id: HG-0930
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $16,000
Invoiced to Date: $12,177.00
Project Description: Ailey East Peachtree St
PI No: 0012282
Regional Project Id: HG-0929
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $64,000
Invoiced to Date: $42,011.75
Project Description: Ailey North Broad St
PI No: 0012283
Regional Project Id: HG-0928
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $40,000
Invoiced to Date: $51,990.60
Project Description: Ailey West Old Ailey Lothair Rd
PI No: 0012284
Regional Project Id: HG-0927
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Pavement Markings
Band: 3:2020 to 2022
Original Project Budgeted: $18,480
Invoiced to Date: $16,817.80
Project Description: Ailey City Street Striping
PI No: 0012285
Regional Project Id: HG-0936
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $30,000
Invoiced to Date: $29,380.85
Project Description: Alston Outler St
PI No: 0012286
Regional Project Id: HG-0937
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $8,000
Invoiced to Date: $7,928.00
Project Description: Alston Church St
PI No: 0012287
Regional Project Id: HG-0938
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $33,302
Invoiced to Date: $46,646.50
Project Description: Alston Wilkes Circle - Part (From Carrie Drive North approximately .11 miles)
PI No: 0012288
Regional Project Id: HG-0953
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $98,000
Invoiced to Date: $75,911.04
Project Description: Mt Vernon Church St
PI No: 0012289
Regional Project Id: HG-0956
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $70,000
Invoiced to Date: $54,221.88
Project Description: Mt Vernon Johnson St
PI No: 0012290
Regional Project Id: HG-0954
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $28,000
Invoiced to Date: $21,689.15
Project Description: Mt Vernon Dobbins St
PI No: 0012291
Regional Project Id: HG-0955
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $14,000
Invoiced to Date: $10,844.58
Project Description: Mt Vernon Faye D Brewer St
PI No: 0012292
Regional Project Id: HG-0965
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $56,000
Invoiced to Date: $36,284.00
Project Description: Mt Vernon Alston Rd
PI No: 0012293
Regional Project Id: HG-0952
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $67,200
Invoiced to Date: $54,368.00
Project Description: Mt Vernon W. Broad St
PI No: 0012294
Regional Project Id: HG-0959
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $109,200
Invoiced to Date: $103,622.60
Project Description: Mt Vernon MLK JR Dr
PI No: 0012295
Regional Project Id: HG-0957
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $70,000
Invoiced to Date: $41,079.00
Project Description: Mt Vernon Lester Robinson
PI No: 0012296
Regional Project Id: HG-0950
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $168,000
Invoiced to Date: $112,658.20
Project Description: Mt Vernon Old Ailey Lothair Rd
PI No: 0012297
Regional Project Id: HG-0946
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $105,000
Invoiced to Date: $90,864.30
Project Description: Mt Vernon Robinson St
PI No: 0012298
Regional Project Id: HG-0942
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $109,200
Invoiced to Date: $120,943.30
Project Description: Mt Vernon North Washington St
PI No: 0012299
Regional Project Id: HG-0941
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $27,976
Invoiced to Date: $22,676.00
Project Description: Mt Vernon South Washington St
PI No: 0012300
Regional Project Id: HG-1370
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $44,100
Invoiced to Date: $26,507.66
Project Description: Hamilton-Tarrytown Road (resurfacing) - Part (Begin at SR 15/29 and go .315 miles)
PI No: 0012301
Regional Project Id: HG-0968
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $60,865
Invoiced to Date: $53,325.84
Project Description: Vidalia Miracle Lane
PI No: 0012302
Regional Project Id: HG-0972
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $467,500
Invoiced to Date: $467,500.00
Project Description: Tattnall Dennis Oliver Rd
PI No: 0012303
Regional Project Id: HG-0975
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $570,150
Invoiced to Date: $482,396.69
Project Description: Tattnall Raymond Bland Rd
PI No: 0012304
Regional Project Id: HG-0976
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022
Original Project Budgeted: $909,040
Invoiced to Date: $46,499.25
Project Description: Tattnall Cyril Burkhalter and Mile Field Rd (Part) (Begin at Cyril Burkhalter RD GA 23/57 and End at US 301/73)
PI No: 0012305
Regional Project Id: HG-0977
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $2,052,400
Invoiced to Date: $1,730,127.29
Project Description: Tattnall Lynntown Rd
PI No: 0012306
Regional Project Id: HG-0978
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $966,000
Invoiced to Date: $825,961.26
Project Description: Tattnall Bubba Kennedy Rd
PI No: 0012307
Regional Project Id: HG-0980
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $1,132,500
Invoiced to Date: $1,078,994.80
Project Description: Tattnall Hillview Rd
PI No: 0012308
Regional Project Id: HG-0987
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $610,000
Invoiced to Date: $40,379.63
Project Description: Tattnall Airport Rd
PI No: 0012309
Regional Project Id: HG-1008
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $13,710
Invoiced to Date: $12,813.42
Project Description: Collins Broad St
PI No: 0012310
Regional Project Id: HG-1001
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $2,800
Invoiced to Date: $5,427.83
Project Description: Collins Plant St
PI No: 0012311
Regional Project Id: HG-1007
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $10,267
Invoiced to Date: $15,288.20
Project Description: Collins Pine St
PI No: 0012312
Regional Project Id: HG-1005
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $56,000
Invoiced to Date: $42,337.69
Project Description: Collins Pearl St
PI No: 0012313
Regional Project Id: HG-1006
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $11,550
Invoiced to Date: $12,341.43
Project Description: Collins Jones St
PI No: 0012314
Regional Project Id: HG-1004
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,867
Invoiced to Date: $12,314.79
Project Description: Collins Church St
PI No: 0012315
Regional Project Id: HG-1003
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $4,375
Invoiced to Date: $5,884.65
Project Description: Collins Williams St
PI No: 0012316
Regional Project Id: HG-1002
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $7,000
Invoiced to Date: $7,615.46
Project Description: Collins Railroad St
PI No: 0012317
Regional Project Id: HG-1036
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $154,420
Invoiced to Date: $152,200.00
Project Description: Glennville Hilltop Rd
PI No: 0012318
Regional Project Id: HG-1023
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $12,740
Invoiced to Date: $12,557.00
Project Description: Glennville Durrence St
PI No: 0012319
Regional Project Id: HG-1012
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $25,760
Invoiced to Date: $25,389.00
Project Description: Glennville Bonnie St
PI No: 0012320
Regional Project Id: HG-1048
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $23,100
Invoiced to Date: $22,768.00
Project Description: Glennville Mendel Ave East
PI No: 0012321
Regional Project Id: HG-1013
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $140,560
Invoiced to Date: $138,539.00
Project Description: Glennville Caswell St
PI No: 0012322
Regional Project Id: HG-1051
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,960
Invoiced to Date: $12,561.75
Project Description: Glennville Park Ave
PI No: 0012323
Regional Project Id: HG-1042
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $67,340
Invoiced to Date: $63,269.74
Project Description: Glennville Laura St
PI No: 0012324
Regional Project Id: HG-1021
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $42,700
Invoiced to Date: $36,091.22
Project Description: Glennville Cowart Ave
PI No: 0012325
Regional Project Id: HG-1059
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $98,560
Invoiced to Date: $91,791.79
Project Description: Glennville Sylvester Ashford Dr
PI No: 0012326
Regional Project Id: HG-1031
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $12,040
Invoiced to Date: $10,884.81
Project Description: Glennville Hal St
PI No: 0012327
Regional Project Id: HG-1024
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $49,980
Invoiced to Date: $41,541.12
Project Description: Glennville Gordon St
PI No: 0012328
Regional Project Id: HG-1020
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $14,700
Invoiced to Date: $12,470.26
Project Description: Glennville Corene Ave
PI No: 0012329
Regional Project Id: HG-1046
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $72,520
Invoiced to Date: $66,530.54
Project Description: Glennville Mann St
PI No: 0012330
Regional Project Id: HG-1043
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $29,400
Invoiced to Date: $24,064.91
Project Description: Glennville Lewis St
PI No: 0012331
Regional Project Id: HG-1025
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $24,920
Invoiced to Date: $21,077.08
Project Description: Glennville Adamson Ave
PI No: 0012332
Regional Project Id: HG-1037
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,540
Invoiced to Date: $12,562.46
Project Description: Glennville Institute St
PI No: 0012333
Regional Project Id: HG-1015
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $42,840
Invoiced to Date: $34,348.38
Project Description: Glennville Charlton St
PI No: 0012334
Regional Project Id: HG-1049
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $20,440
Invoiced to Date: $17,388.01
Project Description: Glennville Oakdale Dr
PI No: 0012335
Regional Project Id: HG-1055
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $14,560
Invoiced to Date: $12,382.07
Project Description: Glennville Rowland Ave
PI No: 0012336
Regional Project Id: HG-1017
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $85,120
Invoiced to Date: $70,182.41
Project Description: Glennville Church St
PI No: 0012337
Regional Project Id: HG-1032
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $113,960
Invoiced to Date: $105,555.31
Project Description: Glennville Hencart Rd (East)
PI No: 0012338
Regional Project Id: HG-1041
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $63,980
Invoiced to Date: $55,299.71
Project Description: Glennville Lakeview Dr
PI No: 0012339
Regional Project Id: HG-1009
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $39,620
Invoiced to Date: $33,634.54
Project Description: Glennville Azalea Rd
PI No: 0012340
Regional Project Id: HG-1035
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $119,700
Invoiced to Date: $102,652.45
Project Description: Glennville Herrington St
PI No: 0012341
Regional Project Id: HG-1038
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $31,780
Invoiced to Date: $31,058.97
Project Description: Glennville Irvin St
PI No: 0012342
Regional Project Id: HG-1030
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $46,480
Invoiced to Date: $39,574.48
Project Description: Glennville Greenwood Dr
PI No: 0012343
Regional Project Id: HG-1039
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $12,040
Invoiced to Date: $10,274.46
Project Description: Glennville Kelley St
PI No: 0012344
Regional Project Id: HG-1022
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $42,140
Invoiced to Date: $35,480.57
Project Description: Glennville-DeLoach Lane
PI No: 0012345
Regional Project Id: HG-1058
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $86,660
Invoiced to Date: $73,591.89
Project Description: Glennville Simon St
PI No: 0012346
Regional Project Id: HG-1063
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $39,760
Invoiced to Date: $35,989.72
Project Description: Glennville Water St
PI No: 0012347
Regional Project Id: HG-1019
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $37,660
Invoiced to Date: $24,182.78
Project Description: Glennville Continental Dr
PI No: 0012348
Regional Project Id: HG-1057
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $24,220
Invoiced to Date: $20,852.65
Project Description: Glennville Sharon Rd
PI No: 0012349
Regional Project Id: HG-1060
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $24,500
Invoiced to Date: $22,515.26
Project Description: Glennville Taylor Lane
PI No: 0012350
Regional Project Id: HG-1053
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $33,460
Invoiced to Date: $30,196.60
Project Description: Glennville Queen Dr
PI No: 0012351
Regional Project Id: HG-1010
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $69,020
Invoiced to Date: $58,780.20
Project Description: Glennville Baker St
PI No: 0012352
Regional Project Id: HG-1054
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $135,520
Invoiced to Date: $114,519.72
Project Description: Glennville Railroad St
PI No: 0012353
Regional Project Id: HG-1040
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $40,180
Invoiced to Date: $34,444.69
Project Description: Glennville Kicklighter St
PI No: 0012354
Regional Project Id: HG-1050
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $68,180
Invoiced to Date: $59,110.23
Project Description: Glennville Oliver Ln
PI No: 0012355
Regional Project Id: HG-1014
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $61,460
Invoiced to Date: $58,868.46
Project Description: Glennville Cedar St
PI No: 0012356
Regional Project Id: HG-1056
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $51,380
Invoiced to Date: $34,859.65
Project Description: Glennville Rustin St
PI No: 0012357
Regional Project Id: HG-1016
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $70,280
Invoiced to Date: $46,380.16
Project Description: Glennville China St
PI No: 0012358
Regional Project Id: HG-1011
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $106,680
Invoiced to Date: $86,055.19
Project Description: Glennville Banks St
PI No: 0012359
Regional Project Id: HG-1045
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $140,700
Invoiced to Date: $113,350.43
Project Description: Glennville Loves Chapel Rd
PI No: 0012360
Regional Project Id: HG-1070
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $105,000
Invoiced to Date: $104,449.38
Project Description: Reidsville Brumby Ave
PI No: 0012361
Regional Project Id: HG-1077
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $174,528
Invoiced to Date: $172,651.10
Project Description: Reidsville Lloyd St
PI No: 0012362
Regional Project Id: HG-1081
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $129,418
Invoiced to Date: $118,058.87
Project Description: Reidsville Ohoopee St
PI No: 0012363
Regional Project Id: HG-1086
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $57,681
Invoiced to Date: $51,158.83
Project Description: Reidsville Woodlawn Terrace
PI No: 0012364
Regional Project Id: HG-1085
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $110,827
Invoiced to Date: $92,841.52
Project Description: Reidsville Smith St
PI No: 0012365
Regional Project Id: HG-1065
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019
Original Project Budgeted: $24,223
Invoiced to Date: $24,007.00
Project Description: Reidsville Memorial Drive Sidewalk
PI No: 0012366
Regional Project Id: HG-1080
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $21,587
Invoiced to Date: $20,841.23
Project Description: Reidsville Nelson St
PI No: 0012367
Regional Project Id: HG-1079
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $23,179
Invoiced to Date: $20,865.31
Project Description: Reidsville McLeod St
PI No: 0012368
Regional Project Id: HG-1069
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $104,621
Invoiced to Date: $5,418.31
Project Description: Reidsville Blount St
PI No: 0012369
Regional Project Id: HG-1067
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $112,100
Invoiced to Date: $5,805.66
Project Description: Reidsville Anderson St
PI No: 0012370
Regional Project Id: HG-1071
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $148,883
Invoiced to Date: $7,710.65
Project Description: Reidsville Chandler Ave
PI No: 0012371
Regional Project Id: HG-1072
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $36,651
Invoiced to Date: $1,898.13
Project Description: Reidsville Church St
PI No: 0012372
Regional Project Id: HG-1074
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $24,743
Invoiced to Date: $21,499.60
Project Description: Reidsville Glenview Dr
PI No: 0012373
Regional Project Id: HG-1094
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Transit
Band: 1:2013 to 2015
Original Project Budgeted: $19,820
Invoiced to Date: $8,213.30
Project Description: Telfair 5311 Capitial
PI No: 0012374
Regional Project Id: HG-1087
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $216,000
Invoiced to Date: $211,909.00
Project Description: Telfair McRae Milan Rd
PI No: 0012375
Regional Project Id: HG-1089
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $64,000
Invoiced to Date: $62,788.00
Project Description: Telfair Owens Rd
PI No: 0012376
Regional Project Id: HG-1090
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $808,000
Invoiced to Date: $734,280.92
Project Description: Telfair Tom Haley Rd
PI No: 0012377
Regional Project Id: HG-1092
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $352,000
Invoiced to Date: $348,853.00
Project Description: Telfair Fishing Creek Rd
PI No: 0012378
Regional Project Id: HG-1093
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $28,263
Invoiced to Date: $28,010.00
Project Description: Telfair Kinnett and Friendship Connector - Yawn Rd
PI No: 0012379
Regional Project Id: HG-1095
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Transit
Band: 1:2013 to 2015
Original Project Budgeted: $178,380
Invoiced to Date: $175,815.00
Project Description: Telfair 5311 Operations (Part)
PI No: 0012380
Regional Project Id: HG-1097
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $50,400
Invoiced to Date: $43,305.22
Project Description: Lumber City River St
PI No: 0012381
Regional Project Id: HG-1108
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $15,400
Invoiced to Date: $12,387.76
Project Description: Lumber City Randall St
PI No: 0012382
Regional Project Id: HG-1100
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $58,800
Invoiced to Date: $58,274.00
Project Description: Lumber City Johnson St
PI No: 0012383
Regional Project Id: HG-1101
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $37,800
Invoiced to Date: $28,477.04
Project Description: Lumber City West Ave
PI No: 0012384
Regional Project Id: HG-1103
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $49,000
Invoiced to Date: $48,562.00
Project Description: Lumber City Broad St
PI No: 0012385
Regional Project Id: HG-1096
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $60,200
Invoiced to Date: $59,662.00
Project Description: Lumber City Central Ave
PI No: 0012386
Regional Project Id: HG-1098
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $63,000
Invoiced to Date: $68,299.04
Project Description: Lumber City Church St
PI No: 0012387
Regional Project Id: HG-1099
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $46,200
Invoiced to Date: $45,787.00
Project Description: Lumber City Virginia Ave
PI No: 0012388
Regional Project Id: HG-1102
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $50,400
Invoiced to Date: $49,948.70
Project Description: Lumber City Pond Rd
PI No: 0012389
Regional Project Id: HG-1107
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $21,000
Invoiced to Date: $19,231.39
Project Description: Lumber City Burns St
PI No: 0012390
Regional Project Id: HG-1105
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $91,000
Invoiced to Date: $82,696.44
Project Description: Lumber City Sand Pit Rd
PI No: 0012391
Regional Project Id: HG-1106
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $84,000
Invoiced to Date: $81,120.50
Project Description: Lumber City E. Railroad St
PI No: 0012392
Regional Project Id: HG-1104
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $21,000
Invoiced to Date: $15,506.26
Project Description: Lumber City Pine St
PI No: 0012393
Regional Project Id: HG-1110
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $11,900
Invoiced to Date: $11,674.00
Project Description: McRae Central Ave
PI No: 0012394
Regional Project Id: HG-1111
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $11,900
Invoiced to Date: $11,674.00
Project Description: McRae Langley Ave
PI No: 0012395
Regional Project Id: HG-1112
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $4,200
Invoiced to Date: $4,120.00
Project Description: McRae Spring Ave
PI No: 0012396
Regional Project Id: HG-1113
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $9,800
Invoiced to Date: $9,614.00
Project Description: McRae Railroad St
PI No: 0012397
Regional Project Id: HG-1114
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $74,200
Invoiced to Date: $72,795.00
Project Description: HG-1135 (Part) McRae Bruce St (West Willow Creek to First Avenue) - (-$8,400)
PI No: 0012398
Regional Project Id: HG-1129
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $5,600
Invoiced to Date: $3,949.67
Project Description: (Part) McRae 2nd Ave Andrew St to Oak St
PI No: 0012399
Regional Project Id: HG-1120
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $63,000
Invoiced to Date: $61,807.00
Project Description: McRae First Ave
PI No: 0012400
Regional Project Id: HG-1121
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $40,600
Invoiced to Date: $39,831.00
Project Description: (Part) McRae 8th Ave (Oak St to Graham St)
PI No: 0012401
Regional Project Id: HG-1122
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $56,000
Invoiced to Date: $54,939.00
Project Description: McRae Lakeside Ave
PI No: 0012402
Regional Project Id: HG-1123
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $70,000
Invoiced to Date: $69,374.00
Project Description: McRae Spring Ave
PI No: 0012403
Regional Project Id: HG-1124
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $150,000
Invoiced to Date: $148,659.00
Project Description: McRae Industrial Blvd
PI No: 0012404
Regional Project Id: HG-1125
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $68,600
Invoiced to Date: $67,987.00
Project Description: (Part) McRae Magnolia St (West City Limits to Ellison Ave)
PI No: 0012405
Regional Project Id: HG-1126
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $56,000
Invoiced to Date: $55,499.00
Project Description: McRae East Ave
PI No: 0012406
Regional Project Id: HG-1127
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $23,800
Invoiced to Date: $23,587.00
Project Description: (Part) McRae Telfair Ave (MLK Blvd to Parsonage St)
PI No: 0012407
Regional Project Id: HG-1128
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $70,000
Invoiced to Date: $69,374.00
Project Description: McRae College St
PI No: 0012408
Regional Project Id: HG-1129
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $86,800
Invoiced to Date: $86,024.00
Project Description: (Part) McRae 2nd Ave Huckabee St to Willow Creek Lane
PI No: 0012409
Regional Project Id: HG-1131
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $119,000
Invoiced to Date: $117,936.00
Project Description: McRae 1st Ave
PI No: 0012410
Regional Project Id: HG-1132
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $98,000
Invoiced to Date: $73,817.10
Project Description: McRae 5th Ave
PI No: 0012411
Regional Project Id: HG-1133
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $126,000
Invoiced to Date: $144,398.12
Project Description: McRae Graham St
PI No: 0012412
Regional Project Id: HG-1134
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $182,000
Invoiced to Date: $209,470.87
Project Description: McRae Brewton
PI No: 0012413
Regional Project Id: HG-1135
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $5,040
Invoiced to Date: $3,465.25
Project Description: (Part) McRae Bruce (Macville Ave to East Willow Creek Lane)
PI No: 0012414
Regional Project Id: HG-1136
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $154,000
Invoiced to Date: $178,052.87
Project Description: McRae 4th Ave
PI No: 0012415
Regional Project Id: HG-1121
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $22,400
Invoiced to Date: $16,917.45
Project Description: (Part) McRae 8th Ave (Liberty St to Willow Creek Lane)
PI No: 0012416
Regional Project Id: HG-1127
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $104,918
Invoiced to Date: $79,354.30
Project Description: (Part) McRae Telfair Ave (Smith to Willow Creek Lane)
PI No: 0012417
Regional Project Id: HG-1116
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $42,000
Invoiced to Date: $31,004.00
Project Description: McRae Strozier Street
PI No: 0012418
Regional Project Id: HG-1137
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $98,000
Invoiced to Date: $47,919.18
Project Description: Scotland Resurface 4th Ave to 4th Ave Ext
PI No: 0012419
Regional Project Id: HG-1141
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $628,600
Invoiced to Date: $622,980.00
Project Description: Toombs Lyons Center Rd
PI No: 0012420
Regional Project Id: HG-1140
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Pavement Markings
Band: 3:2020 to 2022
Original Project Budgeted: $279,900
Invoiced to Date: $261,774.70
Project Description: Toombs County wide Striping
PI No: 0012421
Regional Project Id: HG-1147
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Accel / Decel Lanes
Band: 1:2013 to 2015
Original Project Budgeted: $165,974
Invoiced to Date: $161,901.69
Project Description: Toombs 130 Accel-Decel Lane
PI No: 0012422
Regional Project Id: HG-1145
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $511,000
Invoiced to Date: $506,431.00
Project Description: Toombs Providence Church Rd
PI No: 0012423
Regional Project Id: HG-1146
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $319,200
Invoiced to Date: $316,346.00
Project Description: Toombs Donald Anderson
PI No: 0012424
Regional Project Id: HG-1148
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $214,200
Invoiced to Date: $212,285.00
Project Description: Toombs Five Point Resurfacing
PI No: 0012425
Regional Project Id: HG-1143
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $548,800
Invoiced to Date: $543,893.00
Project Description: Toombs Mt Moriah Church Rd
PI No: 0012426
Regional Project Id: HG-1142
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $845,600
Invoiced to Date: $838,040.00
Project Description: Toombs Marvin Church Rd
PI No: 0012427
Regional Project Id: HG-1149
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $1,140,000
Invoiced to Date: $963,930.23
Project Description: Toombs Ezra Taylor Rd
PI No: 0012428
Regional Project Id: HG-1144
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $631,929
Invoiced to Date: $626,279.00
Project Description: Toombs New Normantown Rd
PI No: 0012429
Regional Project Id: HG-1150
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $200,000
Invoiced to Date: $196,212.00
Project Description: Lyons South Victory Dr
PI No: 0012430
Regional Project Id: HG-1151
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $200,000
Invoiced to Date: $8,987.28
Project Description: Lyons West Oglethorpe Ave
PI No: 0012431
Regional Project Id: HG-1152
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $201,316
Invoiced to Date: $8,987.27
Project Description: Lyons North Lanier and North Lexington
PI No: 0012432
Regional Project Id: HG-1154
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 3:2020 to 2022
Original Project Budgeted: $1,059,000
Invoiced to Date: $483,957.00
Project Description: Lyons SR 292 and Oxley Dr
PI No: 0012433
Regional Project Id: HG-1157
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019
Original Project Budgeted: $1,136,567
Invoiced to Date: $925,560.81
Project Description: Vidalia Mose Coleman Rd
PI No: 0012434
Regional Project Id: HG-1156
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019
Original Project Budgeted: $125,000
Invoiced to Date: $124,941.00
Project Description: Vidalia Michael Collins Dr
PI No: 0012435
Regional Project Id: HG-1159
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019
Original Project Budgeted: $891,445
Invoiced to Date: $891,024.00
Project Description: Vidalia Airport Rd
PI No: 0012436
Regional Project Id: HG-1155
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $1,624,052
Invoiced to Date: $1,624,052.00
Project Description: Vidalia Adams Street
PI No: 0012437
Regional Project Id: HG-1158
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $218,029
Invoiced to Date: $186,706.56
Project Description: Vidalia Pete Phillips Rd
PI No: 0012438
Regional Project Id: HG-1160
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022
Original Project Budgeted: $221,010
Invoiced to Date: $179,384.71
Project Description: Vidalia Brinson Rd
PI No: 0012439
Regional Project Id: HG-1161
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022
Original Project Budgeted: $62,755
Invoiced to Date: $57,177.35
Project Description: Vidalia Lowery Place
PI No: 0012440
Regional Project Id: HG-1162
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022
Original Project Budgeted: $50,120
Invoiced to Date: $44,918.71
Project Description: Vidalia Curry St
PI No: 0012441
Regional Project Id: HG-1163
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022
Original Project Budgeted: $64,002
Invoiced to Date: $33,770.60
Project Description: Vidalia Truman St
PI No: 0012442
Regional Project Id: HG-1164
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022
Original Project Budgeted: $114,975
Invoiced to Date: $97,284.14
Project Description: Vidalia Rudell Rd
PI No: 0012443
Regional Project Id: HG-1165
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022
Original Project Budgeted: $114,975
Invoiced to Date: $99,006.04
Project Description: Vidalia Semco Rd
PI No: 0012444
Regional Project Id: HG-1167
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Railroad Crossings
Band: 3:2020 to 2022
Original Project Budgeted: $157,500
Invoiced to Date: $0
Project Description: Vidalia Upgrade Railroad Crossing (Part) (8 crossings)
PI No: 0012445
Regional Project Id: HG-1170
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $157,160
Invoiced to Date: $162,035.07
Project Description: Treutlen Miller Pond Rd (Part - 1.96 miles) (From Soperton City Limits to .4 miles beyond John Deere Rd)
PI No: 0012446
Regional Project Id: HG-1174
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $136,000
Invoiced to Date: $154,510.23
Project Description: Treutlen Lonesome Pine Rd
PI No: 0012447
Regional Project Id: HG-1187
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $312,000
Invoiced to Date: $309,211.00
Project Description: Treutlen Anderson Pond Rd
PI No: 0012448
Regional Project Id: HG-1180
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $224,000
Invoiced to Date: $186,288.70
Project Description: Treutlen Holton Chapel Rd (Part - 2.8 miles) (From SR 56 to Ohoopee Bend Circle)
PI No: 0012449
Regional Project Id: HG-1169
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $80,000
Invoiced to Date: $79,285.00
Project Description: Treutlen Old Dair Rd - Wommack Rd
PI No: 0012450
Regional Project Id: HG-1186
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $188,000
Invoiced to Date: $186,319.00
Project Description: Treutlen Rosemont Church Rd (Part - 2.35 miles) (From SR 199 and go 2.35 miles)
PI No: 0012451
Regional Project Id: HG-1177
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $168,000
Invoiced to Date: $0
Project Description: Treutlen Ohoopee Bend Rd (2.1 miles) (From SR 86 to Ohoopee Bend Rd. Dead End)
PI No: 0012452
Regional Project Id: HG-1176
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $64,000
Invoiced to Date: $56,270.00
Project Description: Treutlen Deer Run Rd (Part - 0.8 miles) (From Oglethorpe Rd to Holton Chapel Rd)
PI No: 0012453
Regional Project Id: HG-1182
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $112,000
Invoiced to Date: $92,717.00
Project Description: Treutlen Tobacco Trail
PI No: 0012454
Regional Project Id: HG-1178
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $24,000
Invoiced to Date: $45,404.10
Project Description: Treutlen Norristown Rd (Part - 0.3 miles) (3 bad spots of 0.1 mile each from Crooked Run Rd. to SR 171/US 221 at County Line)
PI No: 0012455
Regional Project Id: HG-1181
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $100,000
Invoiced to Date: $74,026.26
Project Description: Treutlen Crooked Run Rd (Part - 1.25 miles, Segment 2) (From begin at Twin Pond Rd and go 1.25 miles)
PI No: 0012456
Regional Project Id: HG-1173
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $80,000
Invoiced to Date: $119,162.00
Project Description: Treutlen Secret Forest Rd
PI No: 0012457
Regional Project Id: HG-1216
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $87,648
Invoiced to Date: $85,988.00
Project Description: Soperton Center Dr
PI No: 0012458
Regional Project Id: HG-1191
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $35,000
Invoiced to Date: $16,720.98
Project Description: Soperton Varnedo St
PI No: 0012459
Regional Project Id: HG-1232
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $87,648
Invoiced to Date: $85,988.00
Project Description: Soperton Parkway Dr
PI No: 0012460
Regional Project Id: HG-1222
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $91,000
Invoiced to Date: $87,663.30
Project Description: Soperton Belk St
PI No: 0012461
Regional Project Id: HG-1200
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $15,400
Invoiced to Date: $6,069.68
Project Description: Soperton Robby Lane
PI No: 0012462
Regional Project Id: HG-1217
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $38,552
Invoiced to Date: $41,466.42
Project Description: Soperton Varnedo St
PI No: 0012463
Regional Project Id: HG-1211
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $15,400
Invoiced to Date: $10,604.45
Project Description: Soperton Roydon Dr
PI No: 0012464
Regional Project Id: HG-1189
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $21,000
Invoiced to Date: $7,344.71
Project Description: Soperton Railroad Avenue Overlay
PI No: 0012465
Regional Project Id: HG-1227
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $38,552
Invoiced to Date: $38,208.00
Project Description: Soperton Westend Dr
PI No: 0012466
Regional Project Id: HG-1225
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $87,648
Invoiced to Date: $86,864.00
Project Description: Soperton Omega St
PI No: 0012467
Regional Project Id: HG-1228
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $38,552
Invoiced to Date: $38,208.00
Project Description: Soperton Straight St
PI No: 0012468
Regional Project Id: HG-1210
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $72,800
Invoiced to Date: $42,406.78
Project Description: Soperton Sessions St
PI No: 0012469
Regional Project Id: HG-1214
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $91,000
Invoiced to Date: $49,431.47
Project Description: Soperton Woodland Dr
PI No: 0012470
Regional Project Id: HG-1223
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,400
Invoiced to Date: $10,004.56
Project Description: Soperton Texas Ave
PI No: 0012471
Regional Project Id: HG-1193
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $35,000
Invoiced to Date: $25,328.41
Project Description: Soperton Edwin St
PI No: 0012472
Regional Project Id: HG-1208
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $119,000
Invoiced to Date: $100,140.11
Project Description: Soperton Florida Ave
PI No: 0012473
Regional Project Id: HG-1197
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $35,000
Invoiced to Date: $24,459.80
Project Description: Soperton Canady Ave
PI No: 0012474
Regional Project Id: HG-1192
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $35,000
Invoiced to Date: $34,687.00
Project Description: Soperton Arch St
PI No: 0012475
Regional Project Id: HG-1226
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $87,648
Invoiced to Date: $116,555.00
Project Description: Soperton Pitus Rd
PI No: 0012476
Regional Project Id: HG-1230
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $38,552
Invoiced to Date: $51,268.00
Project Description: Soperton Alpha Rd
PI No: 0012477
Regional Project Id: HG-1229
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $38,552
Invoiced to Date: $51,268.00
Project Description: Soperton Faith Circle
PI No: 0012478
Regional Project Id: HG-1231
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $59,670
Invoiced to Date: $79,351.00
Project Description: Soperton Flordia Ave Ext
PI No: 0012479
Regional Project Id: HG-1198
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $15,400
Invoiced to Date: $15,262.00
Project Description: Soperton Kelly St
PI No: 0012480
Regional Project Id: HG-1224
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $87,648
Invoiced to Date: $86,980.29
Project Description: Soperton Highland Dr
PI No: 0012481
Regional Project Id: HG-1196
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $35,000
Invoiced to Date: $34,687.00
Project Description: Soperton Ivy Circle
PI No: 0012482
Regional Project Id: HG-1199
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $15,400
Invoiced to Date: $15,262.00
Project Description: Soperton Maple St
PI No: 0012483
Regional Project Id: HG-1219
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $15,400
Invoiced to Date: $13,216.12
Project Description: Soperton Clover St
PI No: 0012484
Regional Project Id: HG-1194
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $35,000
Invoiced to Date: $34,687.00
Project Description: Soperton Berry St
PI No: 0012485
Regional Project Id: HG-1195
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $35,000
Invoiced to Date: $30,407.78
Project Description: Soperton Norman St
PI No: 0012486
Regional Project Id: HG-1245
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2016 to 2019
Original Project Budgeted: $1,000,000
Invoiced to Date: $976,019.90
Project Description: Wayne Widen Rayonier Rd
PI No: 0012487
Regional Project Id: HG-1248
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Raise the Grade
Band: 2:2016 to 2019
Original Project Budgeted: $275,000
Invoiced to Date: $274,427.86
Project Description: Wayne Gardi-Broadhurst Rd
PI No: 0012488
Regional Project Id: HG-1243
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015
Original Project Budgeted: $900,000
Invoiced to Date: $361,002.50
Project Description: Wayne Replace Bridge on Walter Griffis at Goose Creek
PI No: 0012489
Regional Project Id: HG-1234
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2016 to 2019
Original Project Budgeted: $2,500,000
Invoiced to Date: $2,746,704.61
Project Description: WayneReg Reclamation and Widening Broadhurst Rd West
PI No: 0012490
Regional Project Id: HG-1255
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Railroad Crossings
Band: 2:2016 to 2019
Original Project Budgeted: $33,000
Invoiced to Date: $32,704.20
Project Description: Wayne Railroad Crossing at Louisiana Rd
PI No: 0012491
Regional Project Id: HG-1256
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Railroad Crossings
Band: 2:2016 to 2019
Original Project Budgeted: $33,000
Invoiced to Date: $10,531.96
Project Description: Wayne Railroad Crossing at Ed Harrell Rd
PI No: 0012492
Regional Project Id: HG-1254
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Railroad Crossings
Band: 2:2016 to 2019
Original Project Budgeted: $33,000
Invoiced to Date: $24,718.52
Project Description: Wayne Railroad Crossing at Slover Rd
PI No: 0012493
Regional Project Id: HG-1258
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $103,400
Invoiced to Date: $102,476.00
Project Description: Wayne Whaley Rd
PI No: 0012494
Regional Project Id: HG-1246
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015
Original Project Budgeted: $409,400
Invoiced to Date: $301,515.09
Project Description: Wayne Collins Loop Rd
PI No: 0012495
Regional Project Id: HG-1241
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019
Original Project Budgeted: $600,000
Invoiced to Date: $344,743.38
Project Description: Wayne Replace Bridge on Holmesville Rd
PI No: 0012496
Regional Project Id: HG-1242
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019
Original Project Budgeted: $533,000
Invoiced to Date: $528,235.00
Project Description: Wayne US 341 Industrial Pk Rd
PI No: 0012497
Regional Project Id: HG-1251
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $49,529
Invoiced to Date: $60,259.76
Project Description: Wayne Linden Bluff Rd
PI No: 0012498
Regional Project Id: HG-1252
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $92,000
Invoiced to Date: $115,352.00
Project Description: Wayne Killingsworth Road
PI No: 0012499
Regional Project Id: HG-1253
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $330,000
Invoiced to Date: $413,764.00
Project Description: Wayne Holmesville Rd Resurfacing
PI No: 0012500
Regional Project Id: HG-1240
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $828,400
Invoiced to Date: $297,595.63
Project Description: Wayne Holemesville Rd Construction (from Odum Rd South 2.5 miles)
PI No: 0012501
Regional Project Id: HG-1280
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $59,250
Invoiced to Date: $32,631.76
Project Description: Jesup Cedar St
PI No: 0012502
Regional Project Id: HG-1279
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $239,250
Invoiced to Date: $205,398.36
Project Description: Jesup West Orange St Mill/Resurface
PI No: 0012503
Regional Project Id: HG-1267
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 3:2020 to 2022
Original Project Budgeted: $900,000
Invoiced to Date: $124,608.57
Project Description: Jesup West Orange St/US 84 Intersection
PI No: 0012504
Regional Project Id: HG-1281
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $900,000
Invoiced to Date: $406,374.00
Project Description: Jesup South Macon St
PI No: 0012505
Regional Project Id: HG-1266
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 3:2020 to 2022
Original Project Budgeted: $900,000
Invoiced to Date: $109,364.19
Project Description: Jesup West Cherry St
PI No: 0012506
Regional Project Id: HG-1282
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $154,200
Invoiced to Date: $116,259.96
Project Description: Jesup East Plum St
PI No: 0012507
Regional Project Id: HG-1274
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $148,600
Invoiced to Date: $136,289.50
Project Description: Jesup Eleventh St
PI No: 0012508
Regional Project Id: HG-1278
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $60,000
Invoiced to Date: $35,152.00
Project Description: Jesup Robert Hunter Circle
PI No: 0012509
Regional Project Id: HG-1276
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $16,400
Invoiced to Date: $14,014.00
Project Description: Jesup Hunter St
PI No: 0012510
Regional Project Id: HG-1265
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 3:2020 to 2022
Original Project Budgeted: $900,000
Invoiced to Date: $112,273.84
Project Description: Jesup West Pine St
PI No: 0012511
Regional Project Id: HG-1271
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019
Original Project Budgeted: $136,000
Invoiced to Date: $74,782.50
Project Description: Jesup Bay Acres Rd Sidewalk
PI No: 0012512
Regional Project Id: HG-1270
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019
Original Project Budgeted: $41,500
Invoiced to Date: $41,128.00
Project Description: Jesup New East Plum St Sidewalk
PI No: 0012513
Regional Project Id: HG-1268
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019
Original Project Budgeted: $52,000
Invoiced to Date: $50,909.00
Project Description: Jesup New US 301 S Sidewalk
PI No: 0012514
Regional Project Id: HG-1284
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $95,200
Invoiced to Date: $68,338.41
Project Description: Odum North Church St
PI No: 0012515
Regional Project Id: HG-1285
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,400
Invoiced to Date: $10,647.05
Project Description: Odum Ivey St
PI No: 0012516
Regional Project Id: HG-1290
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $17,920
Invoiced to Date: $11,573.97
Project Description: Odum Tillman St - Railroad to Hires
PI No: 0012517
Regional Project Id: HG-1286
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $74,082
Invoiced to Date: $73,062.18
Project Description: Odum Tillman St - (Part) (Main St. to Roberson Rd.)
PI No: 0012518
Regional Project Id: HG-1292
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015
Original Project Budgeted: $376,000
Invoiced to Date: $315,724.13
Project Description: Wheeler Snowhill Baptist Church Rd - CR 178 (Part - 4.7 miles) (Begin at CR 40 and end at SR 46)
PI No: 0012520
Regional Project Id: HG-1294
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 3:2020 to 2022
Original Project Budgeted: $277,500
Invoiced to Date: $701,028.00
Project Description: Wheeler Mt Olivet Church Rd Bridge
PI No: 0012522
Regional Project Id: HG-1296
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $154,000
Invoiced to Date: $136,560.30
Project Description: Alamo Broad St
PI No: 0012523
Regional Project Id: HG-1297
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019
Original Project Budgeted: $316,800
Invoiced to Date: $210,815.39
Project Description: Alamo Lucille Ave Sidewalk
PI No: 0012524
Regional Project Id: HG-1298
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $84,000
Invoiced to Date: $93,658.80
Project Description: Alamo Railroad St
PI No: 0012525
Regional Project Id: HG-1299
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $28,000
Invoiced to Date: $28,182.30
Project Description: Alamo Kent St
PI No: 0012526
Regional Project Id: HG-1300
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $56,000
Invoiced to Date: $39,534.76
Project Description: Alamo Second St
PI No: 0012527
Regional Project Id: HG-1301
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $56,000
Invoiced to Date: $61,060.00
Project Description: Alamo West Railroad
PI No: 0012528
Regional Project Id: HG-1302
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $14,000
Invoiced to Date: $23,848.00
Project Description: Alamo Snowhill Rd
PI No: 0012529
Regional Project Id: HG-1303
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $56,000
Invoiced to Date: $41,243.13
Project Description: Glenwood SW Third Ave
PI No: 0012530
Regional Project Id: HG-1304
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $63,000
Invoiced to Date: $46,399.16
Project Description: Glenwood N 5th St
PI No: 0012531
Regional Project Id: HG-1312
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $70,000
Invoiced to Date: $41,464.00
Project Description: Glenwood N 5th St
PI No: 0012532
Regional Project Id: HG-1310
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $72,000
Invoiced to Date: $70,661.00
Project Description: Glenwood N First St
PI No: 0012533
Regional Project Id: HG-1306
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $35,000
Invoiced to Date: $27,166.00
Project Description: Glenwood West 4th Ave and West 1st Ave (Part) (Only West 4th Ave)
PI No: 0012534
Regional Project Id: HG-1305
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $70,000
Invoiced to Date: $56,417.00
Project Description: Glenwood West 6th and 5th Ave
PI No: 0012535
Regional Project Id: HG-1308
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $29,638
Invoiced to Date: $14,560.00
Project Description: Glenwood S 4th St and N 4th St
PI No: 0012536
Regional Project Id: HG-1313
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $177,216
Invoiced to Date: $165,193.15
Project Description: Wilcox Mount Olive Rd
PI No: 0012537
Regional Project Id: HG-1314
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $32,216
Invoiced to Date: $31,928.00
Project Description: Wilcox Troutman Rd
PI No: 0012538
Regional Project Id: HG-1315
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $150,000
Invoiced to Date: $147,817.20
Project Description: Wilcox Thistle Rd
PI No: 0012539
Regional Project Id: HG-1321
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $390,000
Invoiced to Date: $40,076.09
Project Description: Wilcox Statham Shoals Rd
PI No: 0012540
Regional Project Id: HG-1322
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $450,000
Invoiced to Date: $2,727.00
Project Description: Wilcox Walker Rd
PI No: 0012541
Regional Project Id: HG-1320
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $154,000
Invoiced to Date: $152,623.00
Project Description: Wilcox Lebanon Rd
PI No: 0012542
Regional Project Id: HG-1348
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $39,879
Invoiced to Date: $29,552.18
Project Description: Abbeville E Neapolis St
PI No: 0012543
Regional Project Id: HG-1337
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015
Original Project Budgeted: $70,511
Invoiced to Date: $69,880.00
Project Description: Abbeville Palm Dr
PI No: 0012544
Regional Project Id: HG-1327
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $29,830
Invoiced to Date: $26,214.29
Project Description: Abbeville Bowen St
PI No: 0012545
Regional Project Id: HG-1341
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $43,193
Invoiced to Date: $31,595.28
Project Description: Abbeville Bell St
PI No: 0012546
Regional Project Id: HG-1331
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $20,947
Invoiced to Date: $15,851.97
Project Description: Abbeville Isabella St
PI No: 0012547
Regional Project Id: HG-1330
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $9,148
Invoiced to Date: $13,544.97
Project Description: Abbeville W Ocmulgee St
PI No: 0012548
Regional Project Id: HG-1329
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $50,856
Invoiced to Date: $0
Project Description: Abbeville Wilson Rd
PI No: 0012549
Regional Project Id: HG-1338
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022
Original Project Budgeted: $36,061
Invoiced to Date: $0
Project Description: Abbeville West Neopolis
PI No: 0012550
Regional Project Id: HG-1336
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $11,826
Invoiced to Date: $11,721.00
Project Description: Abbeville East Monroe
PI No: 0012551
Regional Project Id: HG-1345
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $30,652
Invoiced to Date: $30,378.00
Project Description: Abbeville Reid St
PI No: 0012552
Regional Project Id: HG-1342
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $15,485
Invoiced to Date: $15,347.00
Project Description: Abbeville Riverside Dr
PI No: 0012553
Regional Project Id: HG-1343
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $26,886
Invoiced to Date: $26,646.00
Project Description: Abbeville Barnes St
PI No: 0012554
Regional Project Id: HG-1346
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $39,110
Invoiced to Date: $237.00
Project Description: Abbeville W Neapolis St
PI No: 0012555
Regional Project Id: HG-1339
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019
Original Project Budgeted: $32,945
Invoiced to Date: $32,651.00
Project Description: Abbeville West Monroe
PI No: 0012556
Regional Project Id: HG-1334
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $43,591
Invoiced to Date: $0
Project Description: Abbeville Depot St
PI No: 0012557
Regional Project Id: HG-1340
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $11,455
Invoiced to Date: $0
Project Description: Abbeville Church St
PI No: 0012558
Regional Project Id: HG-1328
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $59,527
Invoiced to Date: $58,995.00
Project Description: Abbeville Simon Keen Rd
PI No: 0012559
Regional Project Id: HG-1326
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $6,841
Invoiced to Date: $0
Project Description: Abbeville College St
PI No: 0012560
Regional Project Id: HG-1335
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $59,792
Invoiced to Date: $0
Project Description: Abbeville College St Seg 2
PI No: 0012561
Regional Project Id: HG-1347
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $13,098
Invoiced to Date: $0
Project Description: Abbeville Sibbie Rd
PI No: 0012562
Regional Project Id: HG-1344
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $11,402
Invoiced to Date: $0
Project Description: Abbeville Burkett St
PI No: 0012563
Regional Project Id: HG-1333
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $7,822
Invoiced to Date: $0
Project Description: Abbeville West Park Ave
PI No: 0012564
Regional Project Id: HG-1332
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $12,913
Invoiced to Date: $0
Project Description: Abbeville East Park Ave
PI No: 0012565
Regional Project Id: HG-1351
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015
Original Project Budgeted: $110,000
Invoiced to Date: $28,485.84
Project Description: Rochelle Bessie Ave
PI No: 0012566
Regional Project Id: HG-1352
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $70,000
Invoiced to Date: $32,558.75
Project Description: Rochelle Ruben St
PI No: 0012567
Regional Project Id: HG-1353
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $110,000
Invoiced to Date: $25,782.88
Project Description: Rochelle Jessie St
PI No: 0012568
Regional Project Id: HG-1355
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $110,000
Invoiced to Date: $30,887.43
Project Description: Rochelle Ginhouse St
PI No: 0012569
Regional Project Id: HG-1356
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019
Original Project Budgeted: $35,000
Invoiced to Date: $36,101.13
Project Description: Rochelle Pine St
PI No: 0012570
Regional Project Id: HG-1357
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022
Original Project Budgeted: $35,000
Invoiced to Date: $13,924.44
Project Description: Rochelle Mill St
PI No: 0014178
Regional Project Id: HG-1295
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 3:2020 to 2022
Original Project Budgeted: $200,000
Invoiced to Date: $200,000.00
Project Description: Wheeler Ochwalkee Creek Bridge
PI No: 221975-
Regional Project Id: RC09-000013
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 1:2013 to 2015
Original Project Budgeted: $8,515,626 (Blended Project - Total Budget)
Invoiced to Date: $1,703,125.00
Project Description: SR 341/Northwest Eastman Bypass from SR 27/US 341 Northeast to SR 87/US 23
PI No: 222410-
Regional Project Id: RC09-000014
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2016 to 2019
Original Project Budgeted: $33,640,954 (Blended Project - Total Budget)
Invoiced to Date: $0
Project Description: SR 87/US 23 Widening from CR 8/Log Cabin Rd to South of SR 257
PI No: 270724-
Regional Project Id: HG-0777
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019
Original Project Budgeted: $400,000
Invoiced to Date: $396,424.00
Project Description: Laurens Chappel Mill Bridge
PI No: 522220-
Regional Project Id: RC09-000077
County: Toombs
Congressional District:
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022
Original Project Budgeted: $101,927,957 (Blended Project - Total Budget)
Invoiced to Date: $13,541,017.34
Project Description: Widening of U.S. 1/SR 4 from North of Williams Creek (near Appling line) to Green Oak Road, 522190, 522180
PI No: 532342-
Regional Project Id: HG-1291
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 3:2020 to 2022
Original Project Budgeted: $562,500
Invoiced to Date: $516,180.63
Project Description: Wheeler Alligator Creek Bridge