Transportation Investment Act
Your Penny, Your Progress


Heart of Georgia Altamaha Project List

Total Projects: 764
Projects Under Construction: 96
Projects Completed: 310
TIA Funds Budgeted (2011 Dollars): $334,975,267
Total Expenditure to Date: $64,964,817

Tax Revenue Collected to Date
$124,357,295

Filter projects by:







Oconee River Bridge Project


PI No: 0000833

Regional Project Id: RC09-000041

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 1:2013 to 2015

Original Project Budgeted: $15,294,495 (Blended Project - Total Budget)

Invoiced to Date: $3,551,561

Project Description: Oconee River Bridge Project

SR 4/US 1 over Altamaha River


PI No: 0001216

Regional Project Id: RC09-000003

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 1:2013 to 2015

Original Project Budgeted: $24,848,903 (Blended Project - Total Budget)

Invoiced to Date: $1,898,446

Project Description: Bridge Replacement of SR 4/US 1 over Altamaha River and Overflow, and Williams Creek

SR 135 over Altamaha River


PI No: 0007037

Regional Project Id: RC09-000030

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 2:2016 to 2019

Original Project Budgeted: $6,963,332 (Blended Project - Total Budget)

Invoiced to Date: $0

Project Description: Bridge Replacement at SR 135 over Altamaha River

Hillcrest Pwy Widening


PI No: 0007413

Regional Project Id: RC09-000039

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 2:2016 to 2019

Original Project Budgeted: $17,483,395

Invoiced to Date: $56,611

Project Description: Hillcrest Parkway from CR493/Industrial Blvd. to SR31/US 441

SR 23, 57 Passing Lanes Glennville to Reidsville


PI No: 0008289

Regional Project Id: RC09-000062

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Passing Lanes

Band: 3:2020 to 2022

Original Project Budgeted: $10,900,000

Invoiced to Date: $342,966

Project Description: SR 23, 57 Passing Lanes Glennville to Reidsville

CR 454/CR 225/Cartee Lee Rd/Salem Ch Rd/Lake Ch Rd Resurfacing


PI No: 0011442

Regional Project Id: RC09-000015

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Roadway Project

Band: 1:2013 to 2015

Original Project Budgeted: $6,429,877

Invoiced to Date: $3,612,258

Project Description: CR 454/CR 225/Cartee Lee Rd/Salem Ch Rd/Lake Ch Rd - Swainsboro to Metter

Daisy Nevils Hwy over Canoochee River


PI No: 0011443

Regional Project Id: RC09-000027

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 2:2016 to 2019

Original Project Budgeted: $1,745,000

Invoiced to Date: $247,761

Project Description: Replace Bridge over Canoochee River on Daisy Nevils Highway

HG-0005 Appling Zoar Road


PI No: 0011578

Regional Project Id: HG-0005

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $2,889,000

Invoiced to Date: $2,834,281

Project Description: Appling Zoar Road

HG-0006 Appling Red Oak Church Road


PI No: 0011579

Regional Project Id: HG-0006

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Roadway Project

Band: 2:2016 to 2019

Original Project Budgeted: $1,483,800

Invoiced to Date: $707,690

Project Description: Appling Red Oak Church Road

HG-0007 Appling Altamaha School Road


PI No: 0011580

Regional Project Id: HG-0007

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $900,000

Invoiced to Date: $0

Project Description: Appling Altamaha School Road

HG-0009 Baxley Barnes Street Seg 1 - Appling


PI No: 0011581

Regional Project Id: HG-0009

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $8,400

Invoiced to Date: $9,080

Project Description: Baxley Barnes Street Seg 1

HG-0010 Baxley Lee Street Seg 1 - Appling


PI No: 0011582

Regional Project Id: HG-0010

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $9,800

Invoiced to Date: $9,094

Project Description: Baxley Lee Street Seg 1

HG-0011 Baxley Miles Street - Appling


PI No: 0011583

Regional Project Id: HG-0011

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $21,000

Invoiced to Date: $17,519

Project Description: Baxley Miles Street

HG-0012 Baxley Thomas Street Seg 1 - Appling


PI No: 0011584

Regional Project Id: HG-0012

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $8,466

Invoiced to Date: $0

Project Description: Baxley Thomas Street Seg 1

HG-0013 Baxley Weaver Street East - Appling


PI No: 0011585

Regional Project Id: HG-0013

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $9,800

Invoiced to Date: $15,684

Project Description: Baxley Weaver Street East

HG-0014 Baxley NE Park Avenue - Appling


PI No: 0011586

Regional Project Id: HG-0014

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $116,000

Invoiced to Date: $75,576

Project Description: Baxley NE Park Avenue

HG-0015 Baxley NFL Drive - Appling


PI No: 0011587

Regional Project Id: HG-0015

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $32,200

Invoiced to Date: $12,965

Project Description: Baxley NFL Drive

HG-0016 Baxley Third Street - Appling


PI No: 0011588

Regional Project Id: HG-0016

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $19,600

Invoiced to Date: $13,398

Project Description: Baxley Third Street

HG-0017 Baxley Pine Street Extension - Appling


PI No: 0011589

Regional Project Id: HG-0017

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $61,600

Invoiced to Date: $24,125

Project Description: Baxley Pine Street Extension

HG-0018 Baxley East Allen Street - Appling


PI No: 0011590

Regional Project Id: HG-0018

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $143,072

Invoiced to Date: $55,224

Project Description: Baxley East Allen Street

HG-0019 Baxley Heritage Drive - Appling


PI No: 0011591

Regional Project Id: HG-0019

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $11,200

Invoiced to Date: $10,312

Project Description: Baxley Heritage Drive

HG-0020 Baxley Ivey Street East - Appling


PI No: 0011592

Regional Project Id: HG-0020

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $11,200

Invoiced to Date: $7,802

Project Description: Baxley Ivey Street East

HG-0021 Baxley Page Street - Appling


PI No: 0011593

Regional Project Id: HG-0021

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $16,800

Invoiced to Date: $244

Project Description: Baxley Page Street

HG-0022 Baxley Crosby Street Seg 1 - Appling


PI No: 0011594

Regional Project Id: HG-0022

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $13,066

Invoiced to Date: $12,329

Project Description: Baxley Crosby Street Seg 1

HG-0023 Baxley SE Park Avenue - Appling


PI No: 0011595

Regional Project Id: HG-0023

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $81,895

Invoiced to Date: $46,357

Project Description: Baxley SE Park Avenue

HG-0024 Baxley Anthony Street - Appling


PI No: 0011596

Regional Project Id: HG-0024

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $119,248

Invoiced to Date: $56,758

Project Description: Baxley Anthony Street

HG-0025 Baxley Copeland Avenue - Appling


PI No: 0011597

Regional Project Id: HG-0025

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,400

Invoiced to Date: $10,133

Project Description: Baxley Copeland Avenue

HG-0026 Baxley MLK Avenue Seg 1 - Appling


PI No: 0011598

Regional Project Id: HG-0026

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $201,766

Invoiced to Date: $92,353

Project Description: Baxley MLK Avenue Seg 1

HG-0027 Baxley Harley Street - Appling


PI No: 0011599

Regional Project Id: HG-0027

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $28,000

Invoiced to Date: $24,172

Project Description: Baxley Harley Street

HG-0028 Baxley Foundry Street - Appling


PI No: 0011600

Regional Project Id: HG-0028

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $15,400

Invoiced to Date: $0

Project Description: Baxley Foundry Street

HG-0029 Baxley Kenny Lane - Appling


PI No: 0011601

Regional Project Id: HG-0029

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,400

Invoiced to Date: $12,280

Project Description: Baxley Kenny Lane

HG-0030 Baxley MLK Avenue Seg 2 - Appling


PI No: 0011602

Regional Project Id: HG-0030

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $36,397

Invoiced to Date: $21,086

Project Description: Baxley MLK Avenue Seg 2

HG-0031 Baxley Johnson Street - Appling


PI No: 0011603

Regional Project Id: HG-0031

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $18,200

Invoiced to Date: $12,599

Project Description: Baxley Johnson Street

HG-0032 Baxley Lackawanna Street Seg 1 - Appling


PI No: 0011604

Regional Project Id: HG-0032

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $12,600

Invoiced to Date: $7,472

Project Description: Baxley Lackawanna Street Seg 1

HG-0033 Baxley Pine Street - Appling


PI No: 0011605

Regional Project Id: HG-0033

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $77,000

Invoiced to Date: $44,599

Project Description: Baxley Pine Street

HG-0034 Baxley SW Park Avenue - Appling


PI No: 0011606

Regional Project Id: HG-0034

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $19,248

Invoiced to Date: $18,872

Project Description: Baxley SW Park Avenue

HG-0035 Baxley North Lee Street Extension - Appling


PI No: 0011607

Regional Project Id: HG-0035

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $9,800

Invoiced to Date: $6,520

Project Description: Baxley North Lee Street Extension

HG-0036 Baxley Spruce Street - Appling


PI No: 0011608

Regional Project Id: HG-0036

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,400

Invoiced to Date: $9,211

Project Description: Baxley Spruce Street

HG-0037 Baxley Fair Street - Appling


PI No: 0011609

Regional Project Id: HG-0037

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $133,218

Invoiced to Date: $0

Project Description: Baxley Fair Street

HG-0038 Baxley Holmesville Avenue - Appling


PI No: 0011610

Regional Project Id: HG-0038

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $138,100

Invoiced to Date: $87,410

Project Description: Baxley Holmesville Avenue

HG-0039 Baxley Crowder Street - Appling


PI No: 0011611

Regional Project Id: HG-0039

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $36,398

Invoiced to Date: $0

Project Description: Baxley Crowder Street

HG-0040 Baxley Dogwood Lane - Appling


PI No: 0011612

Regional Project Id: HG-0040

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $28,000

Invoiced to Date: $0

Project Description: Baxley Dogwood Lane

HG-0041 Baxley Lucerne Street - Appling


PI No: 0011613

Regional Project Id: HG-0041

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $36,400

Invoiced to Date: $0

Project Description: Baxley Lucerne Street

HG-0042 Baxley Magnolia Lane - Appling


PI No: 0011614

Regional Project Id: HG-0042

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $49,000

Invoiced to Date: $0

Project Description: Baxley Magnolia Lane

HG-0043 Baxley Oak Street Seg 1 - Appling


PI No: 0011615

Regional Project Id: HG-0043

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $28,000

Invoiced to Date: $0

Project Description: Baxley Oak Street Seg 1

HG-0044 Baxley Penniman Street - Appling


PI No: 0011616

Regional Project Id: HG-0044

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $57,400

Invoiced to Date: $0

Project Description: Baxley Penniman Street

HG-0045 Baxley Second Street - Appling


PI No: 0011617

Regional Project Id: HG-0045

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $54,600

Invoiced to Date: $0

Project Description: Baxley Second Street

HG-0046 Baxley Hopps Street - Appling


PI No: 0011618

Regional Project Id: HG-0046

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $51,800

Invoiced to Date: $0

Project Description: Baxley Hopps Street

HG-0047 Baxley Barnes Street Seg 2 - Appling


PI No: 0011619

Regional Project Id: HG-0047

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $10,424

Invoiced to Date: $0

Project Description: Baxley Barnes Street Seg 2

HG-0048 Baxley West Allen Street - Appling


PI No: 0011620

Regional Project Id: HG-0048

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $13,650

Invoiced to Date: $0

Project Description: Baxley West Allen Street

HG-0049 Baxley Washington Street - Appling


PI No: 0011621

Regional Project Id: HG-0049

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $8,632

Invoiced to Date: $0

Project Description: Baxley Washington Street

HG-0050 Baxley Dean Street - Appling


PI No: 0011622

Regional Project Id: HG-0050

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $21,000

Invoiced to Date: $0

Project Description: Baxley Dean Street

HG-0051 Baxley Douglas Drive - Appling


PI No: 0011623

Regional Project Id: HG-0051

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $25,200

Invoiced to Date: $0

Project Description: Baxley Douglas Drive

HG-0052 Baxley First Street - Appling


PI No: 0011624

Regional Project Id: HG-0052

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $49,000

Invoiced to Date: $0

Project Description: Baxley First Street

HG-0053 Baxley South Harvey Street - Appling


PI No: 0011625

Regional Project Id: HG-0053

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $19,600

Invoiced to Date: $0

Project Description: Baxley South Harvey Street

HG-0054 Baxley Jerome Street - Appling


PI No: 0011626

Regional Project Id: HG-0054

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $14,000

Invoiced to Date: $0

Project Description: Baxley Jerome Street

HG-0055 Baxley Jr High Drive - Appling


PI No: 0011627

Regional Project Id: HG-0055

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $37,800

Invoiced to Date: $0

Project Description: Baxley Jr High Drive

HG-0134 Surrency Cemetery Street - Appling


PI No: 0011628

Regional Project Id: HG-0134

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $36,400

Invoiced to Date: $31,349

Project Description: Surrency Cemetery Street

HG-0132 Surrency Andrews Street - Appling


PI No: 0011629

Regional Project Id: HG-0132

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $36,400

Invoiced to Date: $19,237

Project Description: Surrency Andrews Street

HG-0129 Surrency Norwood Street - Appling


PI No: 0011630

Regional Project Id: HG-0129

County: Appling

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $33,600

Invoiced to Date: $0

Project Description: Surrency Norwood Street

HG-0135 Bleckley Jones Road Bridge


PI No: 0011631

Regional Project Id: HG-0135

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 1:2013 to 2015

Original Project Budgeted: $139,000

Invoiced to Date: $137,757

Project Description: Bleckley Jones Road Bridge

HG-0137 Bleckley Jac Arts Road Resurfacing


PI No: 0011632

Regional Project Id: HG-0137

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $140,170

Invoiced to Date: $55,048

Project Description: Bleckley Jac Arts Road Resurfacing

HG-0138 Bleckley Roy Bryant Road Paving


PI No: 0011633

Regional Project Id: HG-0138

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $235,800

Invoiced to Date: $10,887

Project Description: Bleckley Roy Bryant Road Paving

HG-0139 Bleckley Pineland Estates Road Paving


PI No: 0011634

Regional Project Id: HG-0139

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $113,385

Invoiced to Date: $112,533

Project Description: Bleckley Pineland Estates Road Paving

HG-0140 Bleckley Browning Drive Resurfacing


PI No: 0011635

Regional Project Id: HG-0140

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $70,000

Invoiced to Date: $0

Project Description: Bleckley Browning Drive Resurfacing

HG-0141 Bleckley Bates Road Resurfacing


PI No: 0011636

Regional Project Id: HG-0141

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $252,000

Invoiced to Date: $0

Project Description: Bleckley Bates Road Resurfacing

HG-0142 Bleckley Crest Drive Resurfacing


PI No: 0011637

Regional Project Id: HG-0142

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $154,000

Invoiced to Date: $0

Project Description: Bleckley Crest Drive Resurfacing

SR 169 Railroad Overpass


PI No: 0011840

Regional Project Id: RC09-000089

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 1:2013 to 2015

Original Project Budgeted: $13,978,470

Invoiced to Date: $8,148,776

Project Description: SR 169 Railroad Overpass

SR 169 Widening


PI No: 0011841

Regional Project Id: RC09-000090

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 1:2013 to 2015

Original Project Budgeted: $2,978,086

Invoiced to Date: $1,161,155

Project Description: SR 169 Widening from Sunset Blvd. to NS Railroad Overpass in Jesup

HG-0143 Bleckley Trail Branch Road Resurfacing


PI No: 0011854

Regional Project Id: HG-0143

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $266,000

Invoiced to Date: $154,168

Project Description: Bleckley Trail Branch Road Resurfacing

HG-0144 Bleckley Limestone Road Resurfacing


PI No: 0011855

Regional Project Id: HG-0144

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $619,200

Invoiced to Date: $421,364

Project Description: Bleckley Limestone Road Resurfacing

HG-0145 Bleckley Cary Salem Road Resurfacing


PI No: 0011856

Regional Project Id: HG-0145

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $560,000

Invoiced to Date: $0

Project Description: Bleckley Cary Salem Road Resurfacing

HG-0146 Bleckley Talmadge Coley and Irve Land Roads Resurfacing


PI No: 0011857

Regional Project Id: HG-0146

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $491,400

Invoiced to Date: $357,695

Project Description: Bleckley Talmadge Coley and Irve Land Roads Resurfacing

HG-0147 (Part) Bleckley Magnolia Road Resurfacing


PI No: 0011858

Regional Project Id: HG-0147

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $280,000

Invoiced to Date: $0

Project Description: Bleckley Magnolia Road Resurfacing (Begin at Centennery Rd and go 2.0 miles North)

HG-0148 Cochran Railroad Avenue - Bleckley


PI No: 0011859

Regional Project Id: HG-0148

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $36,273

Invoiced to Date: $0

Project Description: Cochran Railroad Avenue

HG-0149 Cochran Lewis Street - Bleckley


PI No: 0011860

Regional Project Id: HG-0149

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $127,591

Invoiced to Date: $0

Project Description: Cochran Lewis Street

HG-0150 Cochran Beech Street - Bleckley


PI No: 0011861

Regional Project Id: HG-0150

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $130,322

Invoiced to Date: $0

Project Description: Cochran Beech Street

HG-0151 Cochran Maple Street - Bleckley


PI No: 0011862

Regional Project Id: HG-0151

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $35,663

Invoiced to Date: $32,426

Project Description: Cochran Maple Street

HG-0152 Cochran Martin Luther King Blvd - Bleckley


PI No: 0011863

Regional Project Id: HG-0152

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $78,803

Invoiced to Date: $0

Project Description: Cochran Martin Luther King Blvd

HG-0153 Cochran Seventh Street - Bleckley


PI No: 0011864

Regional Project Id: HG-0153

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $45,076

Invoiced to Date: $37,941

Project Description: Cochran Seventh Street

HG-0154 Cochran Ash Street - Bleckley


PI No: 0011865

Regional Project Id: HG-0154

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $149,837

Invoiced to Date: $186,794

Project Description: Cochran Ash Street

HG-0155 Cochran Palm Street - Bleckley


PI No: 0011866

Regional Project Id: HG-0155

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $66,129

Invoiced to Date: $0

Project Description: Cochran Palm Street

HG-0156 Cochran Crest Drive - Bleckley


PI No: 0011867

Regional Project Id: HG-0156

County: Bleckley

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $74,826

Invoiced to Date: $0

Project Description: Cochran Crest Drive

HG-0158 Candler East Pulaski Highway


PI No: 0011868

Regional Project Id: HG-0158

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $266,000

Invoiced to Date: $210,124

Project Description: Candler East Pulaski Highway

HG-0167 Candler St Matthews Church Road


PI No: 0011869

Regional Project Id: HG-0167

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $761,250

Invoiced to Date: $0

Project Description: Candler St Matthews Church Road

HG-0166 Candler Oak Tree Road


PI No: 0011870

Regional Project Id: HG-0166

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $688,017

Invoiced to Date: $688,017

Project Description: Candler Oak Tree Road

HG-0159 Candler Eden Church Road


PI No: 0011871

Regional Project Id: HG-0159

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $532,000

Invoiced to Date: $0

Project Description: Candler Eden Church Road

HG-0168 Candler High Bluff Road


PI No: 0011872

Regional Project Id: HG-0168

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $152,250

Invoiced to Date: $150,889

Project Description: Candler High Bluff Road

HG-0169 Candler Windmill Road


PI No: 0011873

Regional Project Id: HG-0169

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $203,000

Invoiced to Date: $96,123

Project Description: Candler Windmill Road

HG-0170 Metter Central Avenue - Candler


PI No: 0011874

Regional Project Id: HG-0170

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $180,606

Invoiced to Date: $153,552

Project Description: Metter Central Avenue

HG-0171 Metter North Williams Street - Candler


PI No: 0011875

Regional Project Id: HG-0171

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $17,479

Invoiced to Date: $17,148

Project Description: Metter North Williams Street

HG-0172 Metter Matthew Street - Candler


PI No: 0011876

Regional Project Id: HG-0172

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $21,540

Invoiced to Date: $21,348

Project Description: Metter Matthew Street

HG-0174 Metter Martin Luther King Jr Blvd - Candler


PI No: 0011877

Regional Project Id: HG-0174

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $200,928

Invoiced to Date: $197,123

Project Description: Metter Martin Luther King Jr Blvd

HG-0173 Metter West Vertia Street - Candler


PI No: 0011878

Regional Project Id: HG-0173

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $48,086

Invoiced to Date: $0

Project Description: Metter West Vertia Street

HG-0175 Metter Green Street - Candler


PI No: 0011879

Regional Project Id: HG-0175

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $61,748

Invoiced to Date: $0

Project Description: Metter Green Street

HG-0176 Metter Burton Avenue - Candler


PI No: 0011880

Regional Project Id: HG-0176

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $32,044

Invoiced to Date: $0

Project Description: Metter Burton Avenue

HG-0177 Metter South Kennedy Street - Candler


PI No: 0011881

Regional Project Id: HG-0177

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $117,977

Invoiced to Date: $0

Project Description: Metter South Kennedy Street

HG-0178 Metter Ellis Street - Candler


PI No: 0011882

Regional Project Id: HG-0178

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $99,031

Invoiced to Date: $0

Project Description: Metter Ellis Street

HG-0179 Metter Hulett Street - Candler


PI No: 0011883

Regional Project Id: HG-0179

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $33,487

Invoiced to Date: $0

Project Description: Metter Hulett Street

HG-0180 Metter Smith Street - Candler


PI No: 0011884

Regional Project Id: HG-0180

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $45,095

Invoiced to Date: $0

Project Description: Metter Smith Street

HG-0181 Metter Boston Street - Candler


PI No: 0011885

Regional Project Id: HG-0181

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $43,679

Invoiced to Date: $0

Project Description: Metter Boston Street

HG-0182 Metter Mincey Street - Candler


PI No: 0011886

Regional Project Id: HG-0182

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $46,647

Invoiced to Date: $0

Project Description: Metter Mincey Street

HG-0183 Metter South Rountree Street - Candler


PI No: 0011887

Regional Project Id: HG-0183

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $117,977

Invoiced to Date: $0

Project Description: Metter South Rountree Street

HG-0184 Metter South Williams Street - Candler


PI No: 0011888

Regional Project Id: HG-0184

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $58,239

Invoiced to Date: $0

Project Description: Metter South Williams Street

HG-0185 Metter Neal Street - Candler


PI No: 0011889

Regional Project Id: HG-0185

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $59,717

Invoiced to Date: $0

Project Description: Metter Neal Street

HG-0186 Metter South Lewis Street - Candler


PI No: 0011890

Regional Project Id: HG-0186

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 3:2020 to 2022

Original Project Budgeted: $196,431

Invoiced to Date: $0

Project Description: Metter South Lewis Street

HG-0187 Metter East Lillian Street - Candler


PI No: 0011891

Regional Project Id: HG-0187

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $181,997

Invoiced to Date: $0

Project Description: Metter East Lillian Street

HG-0188 Metter Haymans Street - Candler


PI No: 0011892

Regional Project Id: HG-0188

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $29,120

Invoiced to Date: $0

Project Description: Metter Haymans Street

HG-0189 Metter East Hiawatha Street - Candler


PI No: 0011893

Regional Project Id: HG-0189

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $321,583

Invoiced to Date: $0

Project Description: Metter East Hiawatha Street (City contibution of $272,041 to complete)

HG-0191 Pulaski Pulaski School Road - Candler


PI No: 0011894

Regional Project Id: HG-0191

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $14,000

Invoiced to Date: $11,941

Project Description: Pulaski Pulaski School Road

HG-0192 Pulaski West Railroad Street Seg 1 - Candler


PI No: 0011895

Regional Project Id: HG-0192

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $14,000

Invoiced to Date: $14,346

Project Description: Pulaski West Railroad Street Seg 1

HG-0194 Pulaski Brannen Street - Candler


PI No: 0011896

Regional Project Id: HG-0194

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $14,000

Invoiced to Date: $19,423

Project Description: Pulaski Brannen Street

HG-0195 Pulaski East Railroad Street - Candler


PI No: 0011897

Regional Project Id: HG-0195

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $28,000

Invoiced to Date: $0

Project Description: Pulaski East Railroad Street

HG-0196 Pulaski Back Street Seg 1 - Candler


PI No: 0011898

Regional Project Id: HG-0196

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $14,000

Invoiced to Date: $0

Project Description: Pulaski Back Street Seg 1

HG-0198 Pulaski Back Street Seg 2 - Candler


PI No: 0011899

Regional Project Id: HG-0198

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $28,000

Invoiced to Date: $0

Project Description: Pulaski Back Street Seg 2

HG-0197 Pulaski Lee Street - Candler


PI No: 0011900

Regional Project Id: HG-0197

County: Candler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $14,000

Invoiced to Date: $0

Project Description: Pulaski Lee Street

HG-0206 Dodge Chester Highway


PI No: 0011901

Regional Project Id: HG-0206

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $1,178,400

Invoiced to Date: $979,544

Project Description: Dodge Chester Highway

HG-0210 Dodge Bell Line Road


PI No: 0011902

Regional Project Id: HG-0210

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $333,600

Invoiced to Date: $280,098

Project Description: Dodge Bell Line Road

HG-0211 Dodge East Chicken Road


PI No: 0011903

Regional Project Id: HG-0211

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 2:2016 to 2019

Original Project Budgeted: $217,600

Invoiced to Date: $204,562

Project Description: Dodge East Chicken Road

HG-0213 Dodge Milan Chauncey Road


PI No: 0011904

Regional Project Id: HG-0213

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 2:2016 to 2019

Original Project Budgeted: $425,600

Invoiced to Date: $375,103

Project Description: Dodge Milan Chauncey Road

HG-0216 Dodge Rocky Springs Road


PI No: 0011905

Regional Project Id: HG-0216

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 2:2016 to 2019

Original Project Budgeted: $710,400

Invoiced to Date: $575,706

Project Description: Dodge Rocky Springs Road

HG-0212 Dodge Middle Ground Church Road


PI No: 0011906

Regional Project Id: HG-0212

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 2:2016 to 2019

Original Project Budgeted: $620,000

Invoiced to Date: $494,084

Project Description: Dodge Middle Ground Church Road

HG-0215 Dodge Edna Moore Road


PI No: 0011907

Regional Project Id: HG-0215

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 2:2016 to 2019

Original Project Budgeted: $199,200

Invoiced to Date: $160,537

Project Description: Dodge Edna Moore Road

HG-0207 Dodge Roddy Highway


PI No: 0011908

Regional Project Id: HG-0207

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $631,200

Invoiced to Date: $0

Project Description: Dodge Roddy Highway

HG-0208 Dodge Horne Road


PI No: 0011909

Regional Project Id: HG-0208

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $470,400

Invoiced to Date: $0

Project Description: Dodge Horne Road

HG-0209 Dodge Jim Ross Road


PI No: 0011910

Regional Project Id: HG-0209

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $236,000

Invoiced to Date: $0

Project Description: Dodge Jim Ross Road = Part (2.95 mi) - (Begin at SR 87 End at Ran Stewart Road (CR 74))

HG-0221 Chauncey Bussy Street - Dodge


PI No: 0011911

Regional Project Id: HG-0221

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $56,000

Invoiced to Date: $57,307

Project Description: Chauncey Bussy Street

HG-0219 Chauncey Bush Avenue - Dodge


PI No: 0011912

Regional Project Id: HG-0219

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $42,000

Invoiced to Date: $39,161

Project Description: Chauncey Bush Avenue -(.3 mile not on LMIG)

HG-0220 Chauncey Durham Street - Dodge


PI No: 0011913

Regional Project Id: HG-0220

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $31,920

Invoiced to Date: $0

Project Description: Chauncey Durham Street - (.228 mile not on LMIG)

HG-0242 Eastman Ward St - Dodge Ave to 1st Ave - Dodge


PI No: 0011914

Regional Project Id: HG-0242

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $63,636

Invoiced to Date: $0

Project Description: Eastman Ward St - Dodge Ave to 1st Ave

HG-0228 Eastman Oak Street-Golf Course Rd to Cochran Hwy - Dodge


PI No: 0011915

Regional Project Id: HG-0228

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $17,632

Invoiced to Date: $17,247

Project Description: Eastman Oak Street-Golf Course Rd to Cochran Hwy

HG-0229 Eastman Douglas St-Rose St to dead end - Dodge


PI No: 0011916

Regional Project Id: HG-0229

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $3,447

Invoiced to Date: $3,355

Project Description: Eastman Douglas St-Rose St to dead end

HG-0248 Eastman Asbury Drive - Sheldon to Sheldon - Dodge


PI No: 0011917

Regional Project Id: HG-0248

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $17,367

Invoiced to Date: $17,007

Project Description: Eastman Asbury Drive - Sheldon to Sheldon

HG-0277 Eastman Forest Lake Rd - 4th to 9th - Dodge


PI No: 0011918

Regional Project Id: HG-0277

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $37,651

Invoiced to Date: $36,868

Project Description: Eastman Forest Lake Rd - 4th to 9th

HG-0274 Eastman 4th Ave - Congo Lane to Legion Dr - Dodge


PI No: 0011919

Regional Project Id: HG-0274

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $56,742

Invoiced to Date: $55,649

Project Description: Eastman 4th Ave - Congo Lane to Legion Dr

HG-0264 Eastman West Main - 5th to 9th Ave - Dodge


PI No: 0011920

Regional Project Id: HG-0264

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $34,072

Invoiced to Date: $33,138

Project Description: Eastman West Main - 5th to 9th Ave

HG-0251 Eastman Pine Haven Dr - College to Dead end - Dodge


PI No: 0011921

Regional Project Id: HG-0251

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $38,977

Invoiced to Date: $38,203

Project Description: Eastman Pine Haven Dr - College to Dead end

HG-0247 Eastman Norman Ave - 9th to Leitch - Dodge


PI No: 0011922

Regional Project Id: HG-0247

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $30,492

Invoiced to Date: $29,639

Project Description: Eastman Norman Ave - 9th to Leitch

HG-0243 Eastman Ward St - Hwy 46 to 1st Ave - Dodge


PI No: 0011923

Regional Project Id: HG-0243

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $6,708

Invoiced to Date: $0

Project Description: Eastman Ward St - Hwy 46 to 1st Ave

HG-0240 Eastman Bethel - 7th Ave to Anson - Dodge


PI No: 0011924

Regional Project Id: HG-0240

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $14,371

Invoiced to Date: $14,028

Project Description: Eastman Bethel - 7th Ave to Anson

HG-0280 Eastman Main St - 14th Ave to 9th Ave - Dodge


PI No: 0011925

Regional Project Id: HG-0280

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $43,219

Invoiced to Date: $42,370

Project Description: Eastman Main St - 14th Ave to 9th Ave

HG-0261 Eastman Leitch St - Livingston to 14th Ave - Dodge


PI No: 0011926

Regional Project Id: HG-0261

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $32,348

Invoiced to Date: $31,503

Project Description: Eastman Leitch St - Livingston to 14th Ave

HG-0283 Eastman South Carolina St - 5th to Gum - Dodge


PI No: 0011927

Regional Project Id: HG-0283

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $14,981

Invoiced to Date: $14,645

Project Description: Eastman South Carolina St - 5th to Gum

HG-0231 Eastman North St-14th to Dixon St - Dodge


PI No: 0011928

Regional Project Id: HG-0231

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $21,477

Invoiced to Date: $20,884

Project Description: Eastman North St-14th to Dixon St

HG-0244 Eastman James Ave - Ward St to South Carolina St - Dodge


PI No: 0011929

Regional Project Id: HG-0244

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $57,803

Invoiced to Date: $56,408

Project Description: Eastman James Ave - Ward St to South Carolina St

HG-0233 Eastman 4th Ave-Sheldon St to Hwy 46 - Dodge


PI No: 0011930

Regional Project Id: HG-0233

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $29,644

Invoiced to Date: $28,862

Project Description: Eastman 4th Ave-Sheldon St to Hwy 46

HG-0230 Eastman 8th Ave-Bay to Oak - Dodge


PI No: 0011931

Regional Project Id: HG-0230

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $17,500

Invoiced to Date: $17,158

Project Description: Eastman 8th Ave-Bay to Oak

HG-0296 Eastman 8th Ave - Sheldon to Dead End - Dodge


PI No: 0011932

Regional Project Id: HG-0296

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $8,617

Invoiced to Date: $488

Project Description: Eastman 8th Ave - Sheldon to Dead End

HG-0265 Eastman 13th Ave - Oak to Creighton - Dodge


PI No: 0011933

Regional Project Id: HG-0265

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $29,299

Invoiced to Date: $28,623

Project Description: Eastman 13th Ave - Oak to Creighton

HG-0239 Eastman Rose St - Livingston to 9th Ave - Dodge


PI No: 0011934

Regional Project Id: HG-0239

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $18,560

Invoiced to Date: $18,069

Project Description: Eastman Rose St - Livingston to 9th Ave

HG-0250 Eastman Minter Ridge Dr - Minter Dr to Pine Haven - Dodge


PI No: 0011935

Regional Project Id: HG-0250

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $10,340

Invoiced to Date: $10,091

Project Description: Eastman Minter Ridge Dr - Minter Dr to Pine Haven

HG-0252 Eastman Minter Drive - College to Pine Haven - Dodge


PI No: 0011936

Regional Project Id: HG-0252

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $10,340

Invoiced to Date: $10,113

Project Description: Eastman Minter Drive - College to Pine Haven

HG-0385 Eastman Woodlake Dr - North Lakes to Dead End - Dodge


PI No: 0011937

Regional Project Id: HG-0385

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $37,784

Invoiced to Date: $2,139

Project Description: Eastman Woodlake Dr - North Lakes to Dead End

HG-0276 Eastman 7th Ave - Odgen to Forest Lake Rd - Dodge


PI No: 0011938

Regional Project Id: HG-0276

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $61,276

Invoiced to Date: $60,074

Project Description: Eastman 7th Ave - Odgen to Forest Lake Rd

HG-0272 Eastman Pine St - 2nd to 1st - Dodge


PI No: 0011939

Regional Project Id: HG-0272

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $6,628

Invoiced to Date: $6,454

Project Description: Eastman Pine St - 2nd to 1st

HG-0246 Eastman Leitch St - Livingston to 9th - Dodge


PI No: 0011940

Regional Project Id: HG-0246

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $19,223

Invoiced to Date: $1088

Project Description: Eastman Leitch St - Livingston to 9th

HG-0236 Eastman Lee St - Dorough St to Leitch - Dodge


PI No: 0011941

Regional Project Id: HG-0236

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $7,556

Invoiced to Date: $428

Project Description: Eastman Lee St - Dorough St to Leitch

HG-0253 Eastman Lakeview Ct - 10th to Dead End - Dodge


PI No: 0011942

Regional Project Id: HG-0253

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $7,822

Invoiced to Date: $443

Project Description: Eastman Lakeview Ct - 10th to Dead End

HG-0273 Eastman Edgewood Rd - MLK Dr to MLK Dr - Dodge


PI No: 0011943

Regional Project Id: HG-0273

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $25,322

Invoiced to Date: $0

Project Description: Eastman Edgewood Rd - MLK Dr to MLK Dr

HG-0294 Eastman 7th Ave - Sheldon to Page - Dodge


PI No: 0011944

Regional Project Id: HG-0294

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $27,628

Invoiced to Date: $1564

Project Description: Eastman 7th Ave - Sheldon to Page

HG-0312 Eastman Foster St - 3rd Ave to Beulah - Dodge


PI No: 0011945

Regional Project Id: HG-0312

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $17,234

Invoiced to Date: $975

Project Description: Eastman Foster St - 3rd Ave to Beulah

HG-0234 Eastman Page St- Hwy 46 to 1st Ave - Dodge


PI No: 0011946

Regional Project Id: HG-0234

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $21,079

Invoiced to Date: $1,194

Project Description: Eastman Page St- Hwy 46 to 1st Ave

HG-0271 Eastman 1st Ave - Oak to Plum - Dodge


PI No: 0011947

Regional Project Id: HG-0271

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $10,871

Invoiced to Date: $616

Project Description: Eastman 1st Ave - Oak to Plum

HG-0263 Eastman Delacey St - 4th to 7th - Dodge


PI No: 0011948

Regional Project Id: HG-0263

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $27,443

Invoiced to Date: $1,554

Project Description: Eastman Delacey St - 4th to 7th

HG-0245 Eastman Main St - 1st Ave to Dodge Ave - Dodge


PI No: 0011949

Regional Project Id: HG-0245

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $74,242

Invoiced to Date: $4,204

Project Description: Eastman Main St - 1st Ave to Dodge Ave

HG-0241 Eastman Ada St - 14th to Dead end - Dodge


PI No: 0011950

Regional Project Id: HG-0241

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $13,787

Invoiced to Date: $0

Project Description: Eastman Ada St - 14th to Dead end

HG-0237 Eastman Lee St - Leitch to Page - Dodge


PI No: 0011951

Regional Project Id: HG-0237

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $16,174

Invoiced to Date: $916

Project Description: Eastman Lee St - Leitch to Page

HG-0235 Eastman Neese St - 14th to Lee - Dodge


PI No: 0011952

Regional Project Id: HG-0235

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $22,803

Invoiced to Date: $1,291

Project Description: Eastman Neese St - 14th to Lee

HG-0297 Eastman Park St - 5th to 3rd - Dodge


PI No: 0011953

Regional Project Id: HG-0297

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $9,545

Invoiced to Date: $541

Project Description: Eastman Park St - 5th to 3rd

HG-0286 Eastman Eastman St - 9th to 12th - Dodge


PI No: 0011954

Regional Project Id: HG-0286

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $31,287

Invoiced to Date: $1,772

Project Description: Eastman Eastman St - 9th to 12th

HG-0313 Eastman Beulah St - Mt Moriah St to Ward St - Dodge


PI No: 0011955

Regional Project Id: HG-0313

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $49,497

Invoiced to Date: $48,255

Project Description: Eastman Beulah St - Mt Moriah St to Ward St

HG-0320 Eastman College St - Oak to 5th - Dodge


PI No: 0011956

Regional Project Id: HG-0320

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $50,644

Invoiced to Date: $2,868

Project Description: Eastman College St - Oak to 5th

HG-0309 Eastman King St - 1st Ave to Hwy 46 - Dodge


PI No: 0011957

Regional Project Id: HG-0309

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $24,526

Invoiced to Date: $1,389

Project Description: Eastman King St - 1st Ave to Hwy 46

HG-0326 Eastman Morgan Creek Dr - Mary Alexander to Bypass - Dodge


PI No: 0011958

Regional Project Id: HG-0326

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $27,045

Invoiced to Date: $0

Project Description: Eastman Morgan Creek Dr - Mary Alexander to Bypass

HG-0335 Eastman Creighton St - 14th to 9th - Dodge


PI No: 0011959

Regional Project Id: HG-0335

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $40,037

Invoiced to Date: $2,267

Project Description: Eastman Creighton St - 14th to 9th

HG-0404 Eastman Greenhill - 4th to 7th Ave - Dodge


PI No: 0011960

Regional Project Id: HG-0404

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,246

Invoiced to Date: $863

Project Description: Eastman Greenhill - 4th to 7th Ave

HG-0255 Eastman Durhart St - Plum to Dead end - Dodge


PI No: 0011961

Regional Project Id: HG-0255

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $9,412

Invoiced to Date: $533

Project Description: Eastman Durhart St - Plum to Dead end

HG-0256 Eastman Morgan St - Plum to Dead End - Dodge


PI No: 0011962

Regional Project Id: HG-0256

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $9,943

Invoiced to Date: $563

Project Description: Eastman Morgan St - Plum to Dead End

HG-0257 Eastman Plum St - 2nd to MLK Dr - Dodge


PI No: 0011963

Regional Project Id: HG-0257

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $11,799

Invoiced to Date: $668

Project Description: Eastman Plum St - 2nd to MLK Dr

HG-0258 Eastman Popular St - 2nd to 1st - Dodge


PI No: 0011964

Regional Project Id: HG-0258

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $6,894

Invoiced to Date: $0

Project Description: Eastman Popular St - 2nd to 1st

HG-0259 Eastman Burch St - 2nd to MLK Dr - Dodge


PI No: 0011965

Regional Project Id: HG-0259

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $11,534

Invoiced to Date: $653

Project Description: Eastman Burch St - 2nd to MLK Dr

HG-0270 Eastman 3rd Ave - Odgen to Oak - Dodge


PI No: 0011966

Regional Project Id: HG-0270

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $32,481

Invoiced to Date: $1,839

Project Description: Eastman 3rd Ave - Odgen to Oak

HG-0278 Eastman Lee St - Main to Dorough St - Dodge


PI No: 0011967

Regional Project Id: HG-0278

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $22,935

Invoiced to Date: $1,299

Project Description: Eastman Lee St - Main to Dorough St

HG-0238 Eastman Park St - 14th Ave to Lee - Dodge


PI No: 0011968

Regional Project Id: HG-0238

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $25,984

Invoiced to Date: $1,471

Project Description: Eastman Park St - 14th Ave to Lee

HG-0267 Eastman 11th Ave - Pine Dr to Oak - Dodge


PI No: 0011969

Regional Project Id: HG-0267

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $17,234

Invoiced to Date: $0

Project Description: Eastman 11th Ave - Pine Dr to Oak

HG-0300 Eastman Legion Dr - Griffin to 3rd Ave - Dodge


PI No: 0011970

Regional Project Id: HG-0300

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $37,519

Invoiced to Date: $2,124

Project Description: Eastman Legion Dr - Griffin to 3rd Ave

HG-0299 Eastman MLK Dr - 1st to Legion Dr - Dodge


PI No: 0011971

Regional Project Id: HG-0299

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $42,159

Invoiced to Date: $2,387

Project Description: Eastman MLK Dr - 1st to Legion Dr

HG-0293 Eastman 7th Ave - Page to Norman - Dodge


PI No: 0011972

Regional Project Id: HG-0293

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $22,670

Invoiced to Date: $1,283

Project Description: Eastman 7th Ave - Page to Norman

HG-0422 Eastman 12th Ave - Fitzgerald to Oak - Dodge


PI No: 0011973

Regional Project Id: HG-0422

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $32,481

Invoiced to Date: $0

Project Description: Eastman 12th Ave - Fitzgerald to Oak

HG-0423 Eastman 11th Ave - Creighton to Pine Drive - Dodge


PI No: 0011974

Regional Project Id: HG-0423

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $18,295

Invoiced to Date: $0

Project Description: Eastman 11th Ave - Creighton to Pine Drive

HG-0336 Eastman Park St - 5th to 10th - Dodge


PI No: 0011975

Regional Project Id: HG-0336

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $36,060

Invoiced to Date: $2,042

Project Description: Eastman Park St - 5th to 10th

HG-0310 Eastman Foster St - Hwy 46 to 3rd Ave - Dodge


PI No: 0011976

Regional Project Id: HG-0310

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $16,306

Invoiced to Date: $0

Project Description: Eastman Foster St - Hwy 46 to 3rd Ave

HG-0311 Eastman Foster St - Hwy 46 to Anson Ave - Dodge


PI No: 0011977

Regional Project Id: HG-0311

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $5,674

Invoiced to Date: $0

Project Description: Eastman Foster St - Hwy 46 to Anson Ave

HG-0350 Eastman Golf Course Rd - Cochran Rd to Jack Johnson - Dodge


PI No: 0011978

Regional Project Id: HG-0350

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $30,094

Invoiced to Date: $0

Project Description: Eastman Golf Course Rd - Cochran Rd to Jack Johnson

HG-0279 Eastman Ogden St - 2nd to 5th - Dodge


PI No: 0011979

Regional Project Id: HG-0279

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $16,572

Invoiced to Date: $0

Project Description: Eastman Ogden St - 2nd to 5th

HG-0282 Eastman Livingston St - Leitch to Page - Dodge


PI No: 0011980

Regional Project Id: HG-0282

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $9,545

Invoiced to Date: $0

Project Description: Eastman Livingston St - Leitch to Page

HG-0290 Eastman North St - Page to 14th Ave - Dodge


PI No: 0011981

Regional Project Id: HG-0290

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $17,287

Invoiced to Date: $0

Project Description: Eastman North St - Page to 14th Ave

HG-0295 Eastman Dorough St - 14th to Norman - Dodge


PI No: 0011982

Regional Project Id: HG-0295

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $22,007

Invoiced to Date: $0

Project Description: Eastman Dorough St - 14th to Norman

HG-0254 Eastman 10th Ave - Forest Lake to 9th - Dodge


PI No: 0011983

Regional Project Id: HG-0254

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $38,712

Invoiced to Date: $0

Project Description: Eastman 10th Ave - Forest Lake to 9th

HG-0275 Eastman 3rd Ave - Legion Dr to Delacy St - Dodge


PI No: 0011984

Regional Project Id: HG-0275

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $6,628

Invoiced to Date: $0

Project Description: Eastman 3rd Ave - Legion Dr to Delacy St

HG-0353 Eastman 10th Ave - Main to Oak - Dodge


PI No: 0011985

Regional Project Id: HG-0353

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $13,257

Invoiced to Date: $0

Project Description: Eastman 10th Ave - Main to Oak

HG-0348 Eastman Greenwood St - 5th to 7th - Dodge


PI No: 0011986

Regional Project Id: HG-0348

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $11,269

Invoiced to Date: $0

Project Description: Eastman Greenwood St - 5th to 7th

HG-0298 Eastman Magnolia St - 5th to 3rd - Dodge


PI No: 0011987

Regional Project Id: HG-0298

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $9,280

Invoiced to Date: $0

Project Description: Eastman Magnolia St - 5th to 3rd

HG-0318 Eastman 9th Ave - Page to City Limits - Dodge


PI No: 0011988

Regional Project Id: HG-0318

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $32,878

Invoiced to Date: $0

Project Description: Eastman 9th Ave - Page to City Limits

HG-0337 Eastman Pine St - 10th to 5th - Dodge


PI No: 0011989

Regional Project Id: HG-0337

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $30,094

Invoiced to Date: $0

Project Description: Eastman Pine St - 10th to 5th

HG-0339 Eastman 7th Ave - Oak St to Dead end - Dodge


PI No: 0011990

Regional Project Id: HG-0339

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $11,931

Invoiced to Date: $0

Project Description: Eastman 7th Ave - Oak St to Dead end

HG-0354 Eastman 12th Ave - Main to Oak - Dodge


PI No: 0011991

Regional Project Id: HG-0354

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $11,534

Invoiced to Date: $0

Project Description: Eastman 12th Ave - Main to Oak

HG-0355 Eastman 13th Ave - Oak to Main - Dodge


PI No: 0011992

Regional Project Id: HG-0355

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $10,871

Invoiced to Date: $0

Project Description: Eastman 13th Ave - Oak to Main

HG-0346 Eastman 14th Ave - Main to Oak - Dodge


PI No: 0011993

Regional Project Id: HG-0346

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $13,257

Invoiced to Date: $0

Project Description: Eastman 14th Ave - Main to Oak

HG-0356 Eastman 8th Ave - Main to Oak - Dodge


PI No: 0011994

Regional Project Id: HG-0356

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $16,306

Invoiced to Date: $0

Project Description: Eastman 8th Ave - Main to Oak

HG-0357 7th Ave - Oak to Main - Dodge


PI No: 0011995

Regional Project Id: HG-0357

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $13,655

Invoiced to Date: $0

Project Description: 7th Ave - Oak to Main

HG-0358 6th Ave - Main to Oak - Dodge


PI No: 0011996

Regional Project Id: HG-0358

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $12,197

Invoiced to Date: $0

Project Description: 6th Ave - Main to Oak

HG-0362 Eastman Hardin St - Page To Dead End - Dodge


PI No: 0011997

Regional Project Id: HG-0362

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $9,015

Invoiced to Date: $0

Project Description: Eastman Hardin St - Page To Dead End

HG-0249 Eastman Minter Ct - Minter Dr to Dead end - Dodge


PI No: 0011998

Regional Project Id: HG-0249

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $10,340

Invoiced to Date: $586

Project Description: Eastman Minter Ct - Minter Dr to Dead end

HG-0260 Eastman Jessup St - 9th Ave to 4th Ave - Dodge


PI No: 0011999

Regional Project Id: HG-0260

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $31,685

Invoiced to Date: $0

Project Description: Eastman Jessup St - 9th Ave to 4th Ave

HG-0332 Eastman Park Way - 5th Ave to Main - Dodge


PI No: 0012000

Regional Project Id: HG-0332

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $5,965

Invoiced to Date: $0

Project Description: Eastman Park Way - 5th Ave to Main

HG-0317 Eastman 9th Ave - Oak to Page - Dodge


PI No: 0012006

Regional Project Id: HG-0317

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $44,015

Invoiced to Date: $0

Project Description: Eastman 9th Ave - Oak to Page

HG-0302 Eastman Oak Ct - Pine Haven to Dead End - Dodge


PI No: 0012008

Regional Project Id: HG-0302

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $7,689

Invoiced to Date: $0

Project Description: Eastman Oak Ct - Pine Haven to Dead End

HG-0301 Eastman 5th Ave - Odgen to Forest Lake Rd - Dodge


PI No: 0012009

Regional Project Id: HG-0301

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $61,647

Invoiced to Date: $60,013

Project Description: Eastman 5th Ave - Odgen to Forest Lake Rd

HG-0321 Eastman Odgen Lane - 2nd to 5th - Dodge


PI No: 0012010

Regional Project Id: HG-0321

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $17,632

Invoiced to Date: $0

Project Description: Eastman Odgen Lane - 2nd to 5th

HG-0281 Eastman Clements St - 4th to 7th - Dodge


PI No: 0012014

Regional Project Id: HG-0281

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $11,391

Invoiced to Date: $0

Project Description: Eastman Clements St - 4th to 7th

HG-0397 Eastman Harrison St - 1st Ave to Nanacy - Dodge


PI No: 0012016

Regional Project Id: HG-0397

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $26,939

Invoiced to Date: $1,525

Project Description: Eastman Harrison St - 1st Ave to Nanacy

HG-0409 Eastman 1st Ave - 5th Ave to South Carolina - Dodge


PI No: 0012017

Regional Project Id: HG-0409

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $11,931

Invoiced to Date: $0

Project Description: Eastman 1st Ave - 5th Ave to South Carolina

HG-0376 Eastman Locust Lane - Hawkinsville Rd to Dead End - Dodge


PI No: 0012020

Regional Project Id: HG-0376

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $17,500

Invoiced to Date: $0

Project Description: Eastman Locust Lane - Hawkinsville Rd to Dead End

HG-0375 Eastman Laurel Lane - Dead End to Dead End - Dodge


PI No: 0012021

Regional Project Id: HG-0375

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $14,715

Invoiced to Date: $0

Project Description: Eastman Laurel Lane - Dead End to Dead End

HG-0364 Eastman Medical Center Dr - Legion to Griffin - Dodge


PI No: 0012033

Regional Project Id: HG-0364

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $6,363

Invoiced to Date: $6,220

Project Description: Eastman Medical Center Dr - Legion to Griffin

HG-0361 Eastman 17th Ave - Main to Oak - Dodge


PI No: 0012036

Regional Project Id: HG-0361

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $9,280

Invoiced to Date: $0

Project Description: Eastman 17th Ave - Main to Oak

HG-0325 Eastman Oak Forest Rd - Plaza to Dead End - Dodge


PI No: 0012037

Regional Project Id: HG-0325

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $14,185

Invoiced to Date: $0

Project Description: Eastman Oak Forest Rd - Plaza to Dead End

HG-0322 Eastman Wright Dr - 2nd to 5th - Dodge


PI No: 0012038

Regional Project Id: HG-0322

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $17,897

Invoiced to Date: $1,013

Project Description: Eastman Wright Dr - 2nd to 5th

HG-0329 Eastman 4th Ave - 5th to Main - Dodge


PI No: 0012039

Regional Project Id: HG-0329

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $30,890

Invoiced to Date: $0

Project Description: Eastman 4th Ave - 5th to Main

HG-0405 Eastman Wendy Way - Nancy St to Russell St - Dodge


PI No: 0012040

Regional Project Id: HG-0405

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $17,977

Invoiced to Date: $0

Project Description: Eastman Wendy Way - Nancy St to Russell St

HG-0425 Eastman Pine Dr - 9th to 12th - Dodge


PI No: 0012041

Regional Project Id: HG-0425

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $25,587

Invoiced to Date: $0

Project Description: Eastman Pine Dr - 9th to 12th

HG-0292 Eastman Sheldon St - Anson Ave to Dead End - Dodge


PI No: 0012042

Regional Project Id: HG-0292

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $53,030

Invoiced to Date: $0

Project Description: Eastman Sheldon St - Anson Ave to Dead End

HG-0507 Emanuel Extension Fairground Rd


PI No: 0012043

Regional Project Id: HG-0507

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $507,823

Invoiced to Date: $394,900

Project Description: Emanuel Extension Fairground Rd

HG-0443 Emanuel Canoochee Rd


PI No: 0012044

Regional Project Id: HG-0443

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Minor Widen & Resurfacing

Band: 1:2013 to 2015

Original Project Budgeted: $840,000

Invoiced to Date: $814,500

Project Description: Emanuel Canoochee Rd

HG-0493 Emanuel Odomville Church Rd


PI No: 0012045

Regional Project Id: HG-0493

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Minor Widen & Resurfacing

Band: 2:2016 to 2019

Original Project Budgeted: $210,000

Invoiced to Date: $0

Project Description: Emanuel Odomville Church Rd

HG-0464 Emanuel Meeks Rd


PI No: 0012046

Regional Project Id: HG-0464

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Minor Widen & Resurfacing

Band: 2:2016 to 2019

Original Project Budgeted: $490,000

Invoiced to Date: $373,569

Project Description: Emanuel Meeks Rd

HG-0473 Emanuel Quick Road


PI No: 0012047

Regional Project Id: HG-0473

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Minor Widen & Resurfacing

Band: 2:2016 to 2019

Original Project Budgeted: $350,000

Invoiced to Date: $0

Project Description: Emanuel Quick Road

HG-0482 Emanuel Old Kenfield Rd


PI No: 0012048

Regional Project Id: HG-0482

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Minor Widen & Resurfacing

Band: 2:2016 to 2019

Original Project Budgeted: $840,000

Invoiced to Date: $0

Project Description: Emanuel Old Kenfield Rd

HG-0430 Emanuel Old Savannah Rd


PI No: 0012049

Regional Project Id: HG-0430

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Minor Widen & Resurfacing

Band: 3:2020 to 2022

Original Project Budgeted: $924,000

Invoiced to Date: $0

Project Description: Emanuel Old Savannah Rd

HG-0479 Emanuel Pendleton Springs Rd


PI No: 0012050

Regional Project Id: HG-0479

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Minor Widen & Resurfacing

Band: 3:2020 to 2022

Original Project Budgeted: $490,000

Invoiced to Date: $0

Project Description: Emanuel Pendleton Springs Rd

HG-0467 Emanuel Parrish Pond Rd


PI No: 0012051

Regional Project Id: HG-0467

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Minor Widen & Resurfacing

Band: 3:2020 to 2022

Original Project Budgeted: $378,000

Invoiced to Date: $0

Project Description: Emanuel Parrish Pond Rd

HG-0516 Garfield Old Augusta Rd - Emanuel


PI No: 0012052

Regional Project Id: HG-0516

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $42,000

Invoiced to Date: $23,596

Project Description: Garfield Old Augusta Rd

HG-0522 Garfield Sybil Street - Emanuel


PI No: 0012053

Regional Project Id: HG-0522

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $27,128

Invoiced to Date: $0

Project Description: Garfield Sybil Street

HG-0524 Swainsboro North Green Street - Emanuel


PI No: 0012054

Regional Project Id: HG-0524

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $86,800

Invoiced to Date: $85,977

Project Description: Swainsboro North Green Street

HG-0525 Swainsboro Lambs Bridge Road - Emanuel


PI No: 0012055

Regional Project Id: HG-0525

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $168,000

Invoiced to Date: $0

Project Description: Swainsboro Lambs Bridge Road

HG-0526 Swainsboro North Coleman St - Emanuel


PI No: 0012056

Regional Project Id: HG-0526

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $122,080

Invoiced to Date: $113,397

Project Description: Swainsboro North Coleman St

HG-0530 Swainsboro Meadow Lake East - Emanuel


PI No: 0012057

Regional Project Id: HG-0530

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $224,000

Invoiced to Date: $224,000

Project Description: Swainsboro Meadow Lake East

HG-0531 Swainsboro King Circle Dr - Emanuel


PI No: 0012058

Regional Project Id: HG-0531

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $184,800

Invoiced to Date: $184,800

Project Description: Swainsboro King Circle Dr

HG-0552 Swainsboro Braswell Blvd - Emanuel


PI No: 0012059

Regional Project Id: HG-0552

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $42,000

Invoiced to Date: $42,000

Project Description: Swainsboro Braswell Blvd

HG-0553 Swainsboro Short Street - Emanuel


PI No: 0012060

Regional Project Id: HG-0553

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $28,000

Invoiced to Date: $0

Project Description: Swainsboro Short Street

HG-0529 Swainsboro Downtown Sidewalk and Streetscape - Emanuel


PI No: 0012061

Regional Project Id: HG-0529

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Roadway Project

Band: 2:2016 to 2019

Original Project Budgeted: $299,864

Invoiced to Date: $0

Project Description: Swainsboro Downtown Sidewalk and Streetscape (Part)

HG-0532 Swainsboro Industrial Way - Emanuel


PI No: 0012062

Regional Project Id: HG-0532

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $154,000

Invoiced to Date: $0

Project Description: Swainsboro Industrial Way

HG-0537 Swainsboro Fortune Loop - Emanuel


PI No: 0012063

Regional Project Id: HG-0537

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $56,000

Invoiced to Date: $0

Project Description: Swainsboro Fortune Loop

HG-0539 Swainsboro Hill St - Emanuel


PI No: 0012064

Regional Project Id: HG-0539

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $56,000

Invoiced to Date: $0

Project Description: Swainsboro Hill St

HG-0546 Swainsboro Thigpen Dr - Emanuel


PI No: 0012065

Regional Project Id: HG-0546

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $156,800

Invoiced to Date: $0

Project Description: Swainsboro Thigpen Dr

HG-0551 Swainsboro Oaklawn Dr - Emanuel


PI No: 0012066

Regional Project Id: HG-0551

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $112,000

Invoiced to Date: $0

Project Description: Swainsboro Oaklawn Dr

HG-0554 Swainsboro William Rountree St - Emanuel


PI No: 0012067

Regional Project Id: HG-0554

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $56,000

Invoiced to Date: $0

Project Description: Swainsboro William Rountree St

HG-0555 Swainsboro Howard St - Emanuel


PI No: 0012068

Regional Project Id: HG-0555

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $70,000

Invoiced to Date: $0

Project Description: Swainsboro Howard St

HG-0536 Swainsboro Prosperity Dr - Emanuel


PI No: 0012069

Regional Project Id: HG-0536

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $84,000

Invoiced to Date: $0

Project Description: Swainsboro Prosperity Dr

HG-0538 Swainsboro West Meadow Lake - Emanuel


PI No: 0012070

Regional Project Id: HG-0538

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $224,000

Invoiced to Date: $0

Project Description: Swainsboro West Meadow Lake

HG-0540 Swainsboro Arden Dr - Emanuel


PI No: 0012071

Regional Project Id: HG-0540

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $112,000

Invoiced to Date: $0

Project Description: Swainsboro Arden Dr

HG-0533 Swainsboro Race Track St - Emanuel


PI No: 0012072

Regional Project Id: HG-0533

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $196,000

Invoiced to Date: $0

Project Description: Swainsboro Race Track St

HG-0534 Swainsboro Martin Luther King Jr - Emanuel


PI No: 0012073

Regional Project Id: HG-0534

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $147,000

Invoiced to Date: $0

Project Description: Swainsboro Martin Luther King Jr

HG-0543 Swainsboro Mcleod Bridge Rd - Emanuel


PI No: 0012074

Regional Project Id: HG-0543

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $126,000

Invoiced to Date: $0

Project Description: Swainsboro Mcleod Bridge Rd

HG-0544 Swainsboro Old Nunez Rd - Emanuel


PI No: 0012075

Regional Project Id: HG-0544

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $210,000

Invoiced to Date: $0

Project Description: Swainsboro Old Nunez Rd

HG-0545 Swainsboro East Moring St - Emanuel


PI No: 0012076

Regional Project Id: HG-0545

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $14,000

Invoiced to Date: $0

Project Description: Swainsboro East Moring St

HG-0547 Swainsboro Lake Luck Dr - Emanuel


PI No: 0012077

Regional Project Id: HG-0547

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $63,000

Invoiced to Date: $0

Project Description: Swainsboro Lake Luck Dr

HG-0549 Swainsboro Kite Rd - Emanuel


PI No: 0012078

Regional Project Id: HG-0549

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $289,800

Invoiced to Date: $0

Project Description: Swainsboro Kite Rd

HG-0550 Swainsboro Moreland Ave - Emanuel


PI No: 0012079

Regional Project Id: HG-0550

County: Emanuel

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $56,000

Invoiced to Date: $0

Project Description: Swainsboro Moreland Ave

HG-0570 EvansReg Replace Bridge over Bull Creek on Sunbury R - Evans


PI No: 0012080

Regional Project Id: HG-0570

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 2:2016 to 2019

Original Project Budgeted: $985,000

Invoiced to Date: $0

Project Description: Evans Reg Replace Bridge over Bull Creek on Sunbury R

HG-0571 EvansReg Replace Bridge over Scotts Creek on Daisy N - Evans


PI No: 0012081

Regional Project Id: HG-0571

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 2:2016 to 2019

Original Project Budgeted: $580,000

Invoiced to Date: $0

Project Description: Evans Reg Replace Bridge over Scotts Creek on Daisy N

HG-0564 Evans Reg Bill Hodges Rd Resurfacing - Evans


PI No: 0012082

Regional Project Id: HG-0564

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $434,000

Invoiced to Date: $364,651

Project Description: Evans Reg Bill Hodges Rd Resurfacing

HG-0565 EvansReg Commercial Blvd Resurfacing - Evans


PI No: 0012083

Regional Project Id: HG-0565

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $70,000

Invoiced to Date: $54,850

Project Description: EvansReg Commercial Blvd Resurfacing

HG-0572 Evans FE Beasly Rd - Evans


PI No: 0012084

Regional Project Id: HG-0572

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $154,000

Invoiced to Date: $151,690

Project Description: Evans FE Beasly Rd

HG-0574 Evans Bowen Rd - Evans


PI No: 0012085

Regional Project Id: HG-0574

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $504,000

Invoiced to Date: $388,701

Project Description: Evans Bowen Rd

HG-0566 EvansReg John W. Tippins Rd Resurfacing - Evans


PI No: 0012086

Regional Project Id: HG-0566

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $252,000

Invoiced to Date: $209,527

Project Description: EvansReg John W. Tippins Rd Resurfacing

HG-0575 Evans Stafford Rd - Evans


PI No: 0012087

Regional Project Id: HG-0575

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $266,000

Invoiced to Date: $0

Project Description: Evans Stafford Rd

HG-0577 Evans Lex Strickland Rd - Evans


PI No: 0012088

Regional Project Id: HG-0577

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $154,000

Invoiced to Date: $0

Project Description: Evans Lex Strickland Rd

HG-0578 Evans Melissa Circle


PI No: 0012089

Regional Project Id: HG-0578

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $56,000

Invoiced to Date: $0

Project Description: Evans Melissa Circle

HG-0593 Bellville Hugh Brewton St - Evans


PI No: 0012090

Regional Project Id: HG-0593

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $17,898

Invoiced to Date: $17,559

Project Description: Bellville Hugh Brewton St - (Part) (East City Limits West 675 ft)

HG-0595 Bellville Henry Street - Buckcravey Dr - Evans


PI No: 0012091

Regional Project Id: HG-0595

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $42,969

Invoiced to Date: $36,891

Project Description: Bellville Henry Street - Buckcravey Dr

HG-0596 Claxton Perry Lee Deloach - Evans


PI No: 0012092

Regional Project Id: HG-0596

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $27,708

Invoiced to Date: $31

Project Description: Claxton Perry Lee Deloach

HG-0597 Claxton West Liberty Street Seg 1 - Evans


PI No: 0012093

Regional Project Id: HG-0597

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $15,297

Invoiced to Date: $17

Project Description: Claxton West Liberty Street Seg 1

HG-0598 Claxton West Liberty Street Seg 2 - Evans


PI No: 0012094

Regional Project Id: HG-0598

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $47,980

Invoiced to Date: $53

Project Description: Claxton West Liberty Street Seg 2

HG-0599 Claxton West Liberty Street Seg 3 - Evans


PI No: 0012095

Regional Project Id: HG-0599

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $22,323

Invoiced to Date: $20,395

Project Description: Claxton West Liberty Street Seg 3

HG-0600 Claxton West Liberty Street Seg 4 - Evans


PI No: 0012096

Regional Project Id: HG-0600

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $61,994

Invoiced to Date: $40,141

Project Description: Claxton West Liberty Street Seg 4

HG-0601 Claxton West Liberty Street Seg 5 - Evans


PI No: 0012097

Regional Project Id: HG-0601

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $29,531

Invoiced to Date: $20,643

Project Description: Claxton West Liberty Street Seg 5

HG-0602 Claxton Courthouse St - Evans


PI No: 0012098

Regional Project Id: HG-0602

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $29,942

Invoiced to Date: $19,459

Project Description: Claxton Courthouse St

HG-0603 Claxton Turnpike Rd - Evans


PI No: 0012099

Regional Project Id: HG-0603

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $7,772

Invoiced to Date: $9,381

Project Description: Claxton Turnpike Rd

HG-0604 Claxton North Peters St - Evans


PI No: 0012100

Regional Project Id: HG-0604

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $48,374

Invoiced to Date: $24,034

Project Description: Claxton North Peters St

HG-0605 Claxton North College St Seg 1 - Evans


PI No: 0012101

Regional Project Id: HG-0605

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $28,613

Invoiced to Date: $0

Project Description: Claxton North College St Seg 1

HG-0606 Claxton North College Street Seg 2 - Evans


PI No: 0012102

Regional Project Id: HG-0606

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $20,565

Invoiced to Date: $0

Project Description: Claxton North College Street Seg 2

HG-0607 Claxton North Clark St - Evans


PI No: 0012103

Regional Project Id: HG-0607

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $11,287

Invoiced to Date: $0

Project Description: Claxton North Clark St

HG-0608 Claxton South Clark St - Evans


PI No: 0012104

Regional Project Id: HG-0608

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $21,329

Invoiced to Date: $0

Project Description: Claxton South Clark St

HG-0609 Claxton South Clark Street - Evans


PI No: 0012105

Regional Project Id: HG-0609

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $21,371

Invoiced to Date: $0

Project Description: Claxton South Clark Street

HG-0610 Claxton Church St - Evans


PI No: 0012106

Regional Project Id: HG-0610

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $112,673

Invoiced to Date: $0

Project Description: Claxton Church St

HG-0611 Claxton S College St - Evans


PI No: 0012107

Regional Project Id: HG-0611

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $85,800

Invoiced to Date: $0

Project Description: Claxton S College St

HG-0612 Claxton S Ralph St - Evans


PI No: 0012108

Regional Project Id: HG-0612

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $22,629

Invoiced to Date: $0

Project Description: Claxton S Ralph St

HG-0613 Claxton City Hall Alley - Evans


PI No: 0012109

Regional Project Id: HG-0613

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,989

Invoiced to Date: $0

Project Description: Claxton City Hall Alley

HG-0614 Claxton Barnes St - Evans


PI No: 0012110

Regional Project Id: HG-0614

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $40,600

Invoiced to Date: $0

Project Description: Claxton Barnes St

HG-0615 Claxton Freeman St - Evans


PI No: 0012111

Regional Project Id: HG-0615

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $13,881

Invoiced to Date: $0

Project Description: Claxton Freeman St

HG-0616 Claxton S Claxton Ave - Evans


PI No: 0012112

Regional Project Id: HG-0616

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $63,169

Invoiced to Date: $0

Project Description: Claxton S Claxton Ave

HG-0617 Claxton Ridge Street - Evans


PI No: 0012113

Regional Project Id: HG-0617

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $29,617

Invoiced to Date: $0

Project Description: Claxton Ridge Street

HG-0618 Claxton E Long St - Evans


PI No: 0012114

Regional Project Id: HG-0618

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $120,733

Invoiced to Date: $0

Project Description: Claxton E Long St

HG-0619 Claxton Bowen Lane - Evans


PI No: 0012115

Regional Project Id: HG-0619

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $10,642

Invoiced to Date: $0

Project Description: Claxton Bowen Lane

HG-0621 Claxton S Peters St - Evans


PI No: 0012116

Regional Project Id: HG-0621

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $82,197

Invoiced to Date: $0

Project Description: Claxton S Peters St

HG-0623 Claxton E Smith St - Evans


PI No: 0012117

Regional Project Id: HG-0623

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $34,035

Invoiced to Date: $0

Project Description: Claxton E Smith St - (Part) (S. Newton St. to Anderson Ave.)

HG-0629 Daisy East Main St. - Evans


PI No: 0012118

Regional Project Id: HG-0629

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $15,900

Invoiced to Date: $14,098

Project Description: Daisy East Main St.

HG-0628 Daisy East Railroad St - Evans


PI No: 0012119

Regional Project Id: HG-0628

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $18,200

Invoiced to Date: $0

Project Description: Daisy East Railroad St

HG-0627 Daisy West Railroad St


PI No: 0012120

Regional Project Id: HG-0627

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $25,189

Invoiced to Date: $0

Project Description: Daisy West Railroad St

HG-0631 Hagan Cedar Ave - Tattnall St to City Limits - Evans


PI No: 0012121

Regional Project Id: HG-0631

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $68,800

Invoiced to Date: $61,402

Project Description: Hagan Cedar Ave - Tattnall St to City Limits

HG-0632 Hagan Turnpike Rd - Hodges St to City Limts - Evans


PI No: 0012122

Regional Project Id: HG-0632

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $93,800

Invoiced to Date: $63,404

Project Description: Hagan Turnpike Rd - Hodges St to City Limts

HG-0633 Hagan Hodges St - Hwy 280 to City Limits - Evans


PI No: 0012123

Regional Project Id: HG-0633

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $39,200

Invoiced to Date: $25,344

Project Description: Hagan Hodges St - Hwy 280 to City Limits

HG-0634 Hagan Old Dublin Rd - Cemetery to Old Metter Hwy - Evans


PI No: 0012124

Regional Project Id: HG-0634

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $74,200

Invoiced to Date: $57,947

Project Description: Hagan Old Dublin Rd - Cemetery to Old Metter Hwy

HG-0635 Hagan Pine Ave - Brewton to Hodges - Evans


PI No: 0012125

Regional Project Id: HG-0635

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $19,600

Invoiced to Date: $17,199

Project Description: Hagan Pine Ave - Brewton to Hodges

HG-0636 Hagan Cemetery Rd - Turnpike to Old Dublin - Evans


PI No: 0012126

Regional Project Id: HG-0636

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $30,800

Invoiced to Date: $0

Project Description: Hagan Cemetery Rd - Turnpike to Old Dublin

HG-0637 Hagan Calhoun Street - Evans


PI No: 0012127

Regional Project Id: HG-0637

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $7,000

Invoiced to Date: $0

Project Description: Hagan Calhoun Street

HG-0630 Hagan South Railroad Ave -Perkins Mill to Calhoun St - Evans


PI No: 0012128

Regional Project Id: HG-0630

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $68,600

Invoiced to Date: $0

Project Description: Hagan South Railroad Ave -Perkins Mill to Calhoun St

HG-0638 Hagan Hodges St - Hwy 280 to Cedar - Evans


PI No: 0012129

Regional Project Id: HG-0638

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $37,800

Invoiced to Date: $0

Project Description: Hagan Hodges St - Hwy 280 to Cedar

HG-0657 Hagan Smith St - Hwy 280 to Turnpike - Evans


PI No: 0012130

Regional Project Id: HG-0657

County: Evans

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $9,800

Invoiced to Date: $0

Project Description: Hagan Smith St - Hwy 280 to Turnpike

HG-0664 Jeff Davis CA Holmes Rd


PI No: 0012131

Regional Project Id: HG-0664

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $99,400

Invoiced to Date: $97,517

Project Description: Jeff Davis CA Holmes Rd

HG-0681 Jeff Davis John Long Rd


PI No: 0012132

Regional Project Id: HG-0681

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $143,800

Invoiced to Date: $141,076

Project Description: Jeff Davis John Long Rd

HG-0677 Jeff Davis Bridgeford Church Rd - CR 296


PI No: 0012133

Regional Project Id: HG-0677

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $938,980

Invoiced to Date: $930,585

Project Description: Jeff Davis Bridgeford Church Rd - CR 296

HG-0675 Jeff Davis Pat Dixon Rd


PI No: 0012134

Regional Project Id: HG-0675

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $537,600

Invoiced to Date: $532,794

Project Description: Jeff Davis Pat Dixon Rd

HG-0670 Jeff Davis Buford Rd - CR 280


PI No: 0012135

Regional Project Id: HG-0670

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $75,600

Invoiced to Date: $74,168

Project Description: Jeff Davis Buford Rd - CR 280

HG-0676 Jeff Davis John Osburne Rd


PI No: 0012136

Regional Project Id: HG-0676

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $80,080

Invoiced to Date: $78,563

Project Description: Jeff Davis John Osburne Rd

HG-0669 Jeff Davis JA Yawn Rd - CR 245


PI No: 0012137

Regional Project Id: HG-0669

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $323,120

Invoiced to Date: $317,000

Project Description: Jeff Davis JA Yawn Rd - CR 245

HG-0666 Jeff Davis WH Smith Rd - CR 38 and 297


PI No: 0012138

Regional Project Id: HG-0666

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $637,420

Invoiced to Date: $631,721

Project Description: Jeff Davis WH Smith Rd - CR 38 and 297

HG-0671 Jeff Davis McDaniel Rd - CR 249


PI No: 0012139

Regional Project Id: HG-0671

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $78,680

Invoiced to Date: $77,190

Project Description: Jeff Davis McDaniel Rd - CR 249

HG-0667 Jeff Davis Philadelphia Church Rd - CR 294


PI No: 0012140

Regional Project Id: HG-0667

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $547,200

Invoiced to Date: $0

Project Description: Jeff Davis Philadelphia Church Rd - CR 294

HG-0672 Jeff Davis Satilla Church Rd


PI No: 0012141

Regional Project Id: HG-0672

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $245,000

Invoiced to Date: $0

Project Description: Jeff Davis Satilla Church Rd

HG-0691 Jeff Davis Elizabeth Church Rd


PI No: 0012142

Regional Project Id: HG-0691

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $412,975

Invoiced to Date: $0

Project Description: Jeff Davis Elizabeth Church Rd

HG-0695 Hazlehurst North Miller St - Jeff Davis


PI No: 0012143

Regional Project Id: HG-0695

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $84,000

Invoiced to Date: $82,409

Project Description: Hazlehurst North Miller St

HG-0696 Hazlehurst Latimer St - Jeff Davis


PI No: 0012144

Regional Project Id: HG-0696

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $112,000

Invoiced to Date: $109,879

Project Description: Hazlehurst Latimer St

HG-0697 Hazlehurst West Odum St - Jeff Davis


PI No: 0012145

Regional Project Id: HG-0697

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $98,000

Invoiced to Date: $96,113

Project Description: Hazlehurst West Odum St

HG-0698 Hazlehurst Pat Dixon Rd - Jeff Davis


PI No: 0012146

Regional Project Id: HG-0698

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $42,000

Invoiced to Date: $40,914

Project Description: Hazlehurst Pat Dixon Rd

HG-0699 Hazlehurst Hatten Still Rd - Jeff Davis


PI No: 0012147

Regional Project Id: HG-0699

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $245,000

Invoiced to Date: $193,546

Project Description: Hazlehurst Hatten Still Rd

HG-0700 Hazlehurst Pine St - Jeff Davis


PI No: 0012148

Regional Project Id: HG-0700

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $56,000

Invoiced to Date: $54,825

Project Description: Hazlehurst Pine St

HG-0701 Hazlehurst Hester St - Jeff Davis


PI No: 0012149

Regional Project Id: HG-0701

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $56,000

Invoiced to Date: $25,753

Project Description: Hazlehurst Hester St

HG-0702 Hazlehurst Girtman St - Jeff Davis


PI No: 0012150

Regional Project Id: HG-0702

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $98,000

Invoiced to Date: $63,877

Project Description: Hazlehurst Girtman St

HG-0703 Hazlehurst Williams St - Jeff Davis


PI No: 0012151

Regional Project Id: HG-0703

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $168,000

Invoiced to Date: $145,170

Project Description: Hazlehurst Williams St

HG-0704 Hazlehurst Martin Luther King Jr Dr - Jeff Davis


PI No: 0012152

Regional Project Id: HG-0704

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $105,000

Invoiced to Date: $78,308

Project Description: Hazlehurst Martin Luther King Jr Dr

HG-0705 Hazlehurst South Tallhasee St - sidewalk - Jeff Davis


PI No: 0012153

Regional Project Id: HG-0705

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 2:2016 to 2019

Original Project Budgeted: $7,500

Invoiced to Date: $0

Project Description: Hazlehurst South Tallahassee St - sidewalk

HG-0706 Hazlehurst Burketts Ferry Sidewalk - Jeff Davis


PI No: 0012154

Regional Project Id: HG-0706

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 2:2016 to 2019

Original Project Budgeted: $45,000

Invoiced to Date: $0

Project Description: Hazlehurst Burketts Ferry Sidewalk

HG-0707 Hazlehurst Collins St Sidewalk - Jeff Davis


PI No: 0012155

Regional Project Id: HG-0707

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 2:2016 to 2019

Original Project Budgeted: $125,000

Invoiced to Date: $0

Project Description: Hazlehurst Collins St Sidewalk

HG-0708 Hazlehurst Kersey St - Jeff Davis


PI No: 0012156

Regional Project Id: HG-0708

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $98,000

Invoiced to Date: $0

Project Description: Hazlehurst Kersey St

HG-0709 Hazlehurst Sycamore St - Jeff Davis


PI No: 0012157

Regional Project Id: HG-0709

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $21,000

Invoiced to Date: $0

Project Description: Hazlehurst Sycamore St

HG-0710 Hazlehurst East Plum St - Jeff Davis


PI No: 0012158

Regional Project Id: HG-0710

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $84,000

Invoiced to Date: $0

Project Description: Hazlehurst East Plum St

HG-0711 Hazlehurst Collins St - Jeff Davis


PI No: 0012159

Regional Project Id: HG-0711

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $98,000

Invoiced to Date: $0

Project Description: Hazlehurst Collins St

HG-0712 Hazlehurst Wilson St - Jeff Davis


PI No: 0012160

Regional Project Id: HG-0712

County: Jeff Davis

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $140,000

Invoiced to Date: $0

Project Description: Hazlehurst Wilson St

HG-0736 Johnson Glen Donaldson Rd


PI No: 0012161

Regional Project Id: HG-0736

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 1:2013 to 2015

Original Project Budgeted: $148,000

Invoiced to Date: $118,899

Project Description: Johnson Glen Donaldson Rd

HG-0734 Johnson Faith Tabernacle Rd


PI No: 0012162

Regional Project Id: HG-0734

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 1:2013 to 2015

Original Project Budgeted: $48,000

Invoiced to Date: $36,727

Project Description: Johnson Faith Tabernacle Rd

HG-0733 Johnson Calvary Church Rd


PI No: 0012163

Regional Project Id: HG-0733

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 1:2013 to 2015

Original Project Budgeted: $168,000

Invoiced to Date: $145,773

Project Description: Johnson Calvary Church Rd

HG-0745 Johnson Snells Bridge Rd


PI No: 0012164

Regional Project Id: HG-0745

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 2:2016 to 2019

Original Project Budgeted: $284,000

Invoiced to Date: $224,776

Project Description: Johnson Snells Bridge Rd

HG-0735 Johnson Trinity Church Rd


PI No: 0012165

Regional Project Id: HG-0735

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 1:2013 to 2015

Original Project Budgeted: $92,000

Invoiced to Date: $89,386

Project Description: Johnson Trinity Church Rd

HG-0739 Johnson James Grove Church Rd


PI No: 0012166

Regional Project Id: HG-0739

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 1:2013 to 2015

Original Project Budgeted: $144,000

Invoiced to Date: $119,638

Project Description: Johnson James Grove Church Rd

HG-0737 Johnson Cross Cedar Rd Seg 1


PI No: 0012167

Regional Project Id: HG-0737

County: Johnson

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 2:2016 to 2019

Original Project Budgeted: $320,000

Invoiced to Date: $241,162

Project Description: Johnson Cross Cedar Rd Seg 1

HG-0738 Johnson Cross Cedar Rd Seg 2


PI No: 0012168

Regional Project Id: HG-0738

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 2:2016 to 2019

Original Project Budgeted: $212,000

Invoiced to Date: $160,708

Project Description: Johnson Cross Cedar Rd Seg 2

HG-0747 Johnson Tuckers Grove Church Rd Ph 1


PI No: 0012169

Regional Project Id: HG-0747

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $574,000

Invoiced to Date: $0

Project Description: Johnson Tuckers Grove Church Rd Ph 1

HG-0741 Johnson Pringle Rd - Jeff Davis


PI No: 0012170

Regional Project Id: HG-0741

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 3:2020 to 2022

Original Project Budgeted: $200,000

Invoiced to Date: $0

Project Description: Johnson Pringle Rd

HG-0750 Kite College St Priority 1 - Johnson


PI No: 0012171

Regional Project Id: HG-0750

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $42,000

Invoiced to Date: $25,352

Project Description: Kite College St Priority 1

HG-0751 Kite Ohoopee St Pr 2 - Johnson


PI No: 0012172

Regional Project Id: HG-0751

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $17,500

Invoiced to Date: $0

Project Description: Kite Ohoopee St Pr 2

HG-0752 Kite Claxton Blvd - Johnson


PI No: 0012173

Regional Project Id: HG-0752

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $9,350

Invoiced to Date: $0

Project Description: Kite Claxton Blvd

HG-0753 Kite Hatcher St - Johnson


PI No: 0012174

Regional Project Id: HG-0753

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $28,000

Invoiced to Date: $0

Project Description: Kite Hatcher St

HG-0766 Wrightsville Idylwild Dr - Johnson


PI No: 0012175

Regional Project Id: HG-0766

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $245,000

Invoiced to Date: $208,644

Project Description: Wrightsville Idylwild Dr

HG-0765 Wrightsville Sidewalk Repair - Johnson


PI No: 0012176

Regional Project Id: HG-0765

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 1:2013 to 2015

Original Project Budgeted: $250,000

Invoiced to Date: $258,480

Project Description: Wrightsville Sidewalk Repair (Rapid Response)

HG-0764 Wrightsville Flanders Lynn Jan and Helen Sts - Johnson


PI No: 0012177

Regional Project Id: HG-0764

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $290,000

Invoiced to Date: $0

Project Description: Wrightsville Flanders Lynn Jan and Helen Sts

HG-0763 Wrightsville Lakeview Dr - Johnson


PI No: 0012178

Regional Project Id: HG-0763

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $172,000

Invoiced to Date: $0

Project Description: Wrightsville Lakeview Dr

HG-0762 Wrightsville Lee St - Johnson


PI No: 0012179

Regional Project Id: HG-0762

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $65,500

Invoiced to Date: $0

Project Description: Wrightsville Lee St

HG-0761 Wrightsville Myrtle Ave - Johnson


PI No: 0012180

Regional Project Id: HG-0761

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $185,000

Invoiced to Date: $0

Project Description: Wrightsville Myrtle Ave

HG-0767 Wrightsville Court St - Johnson


PI No: 0012181

Regional Project Id: HG-0767

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $263,000

Invoiced to Date: $0

Project Description: Wrightsville Court St

HG-0768 Wrightsville Georgia Ave - Johnson


PI No: 0012182

Regional Project Id: HG-0768

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $46,000

Invoiced to Date: $0

Project Description: Wrightsville Georgia Ave

HG-0770 Wrightsville Bradford St - Johnson


PI No: 0012183

Regional Project Id: HG-0770

County: Johnson

Congressional District: 10

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $47,000

Invoiced to Date: $0

Project Description: Wrightsville Bradford St

HG-0775 Laurens Springhaven Bridge


PI No: 0012184

Regional Project Id: HG-0775

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 1:2013 to 2015

Original Project Budgeted: $162,500

Invoiced to Date: $160,163

Project Description: Laurens Springhaven Bridge

HG-0774 Laurens Springhaven Rd


PI No: 0012185

Regional Project Id: HG-0774

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $725,000

Invoiced to Date: $714,574

Project Description: Laurens Springhaven Rd

HG-0776 Laurens Walke Dairy Bridge


PI No: 0012186

Regional Project Id: HG-0776

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 1:2013 to 2015

Original Project Budgeted: $487,500

Invoiced to Date: $480,489

Project Description: Laurens Walke Dairy Bridge

HG-0781 Old Hawkinsville Rd - Laurens


PI No: 0012188

Regional Project Id: HG-0781

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $1,040,000

Invoiced to Date: $472,435

Project Description: Old Hawkinsville Rd

HG-0780 Laurens Country Club Rd


PI No: 0012189

Regional Project Id: HG-0780

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $637,800

Invoiced to Date: $0

Project Description: Laurens Country Club Rd

HG-0779 Laurens Valambrosia Arthur Wolf Rd


PI No: 0012190

Regional Project Id: HG-0779

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $565,600

Invoiced to Date: $0

Project Description: Laurens Valambrosia Arthur Wolf Rd

HG-0786 Laurens Butler Rd


PI No: 0012191

Regional Project Id: HG-0786

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $933,000

Invoiced to Date: $13,555

Project Description: Laurens Butler Rd

HG-0798 Laurens Watkins Hall Rd


PI No: 0012192

Regional Project Id: HG-0798

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $630,000

Invoiced to Date: $0

Project Description: Laurens Watkins Hall Rd

HG-0787 Laurens Thairdell Rd


PI No: 0012193

Regional Project Id: HG-0787

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $600,000

Invoiced to Date: $0

Project Description: Laurens Thairdell Rd

HG-0788 Laurens Stanley Cemetery Rd


PI No: 0012194

Regional Project Id: HG-0788

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $831,000

Invoiced to Date: $0

Project Description: Laurens Stanley Cemetery Rd

HG-0789 Laurens Anderson Rd


PI No: 0012195

Regional Project Id: HG-0789

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $543,000

Invoiced to Date: $0

Project Description: Laurens Anderson Rd

HG-0793 Laurens Dublin Eastman Rd


PI No: 0012196

Regional Project Id: HG-0793

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $600,600

Invoiced to Date: $595,230

Project Description: Laurens Dublin Eastman Rd

HG-0802 Laurens Mark Wood Rd


PI No: 0012197

Regional Project Id: HG-0802

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $637,000

Invoiced to Date: $0

Project Description: Laurens Mark Wood Rd

HG-0807 Laurens Old Toomsboro Rd


PI No: 0012198

Regional Project Id: HG-0807

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $1,117,200

Invoiced to Date: $0

Project Description: Laurens Old Toomsboro Rd

HG-0792 Laurens Rock Springs Rd


PI No: 0012199

Regional Project Id: HG-0792

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $1,173,200

Invoiced to Date: $0

Project Description: Laurens Rock Springs Rd

HG-0805 Laurens Ed Becham Rd


PI No: 0012200

Regional Project Id: HG-0805

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $162,292

Invoiced to Date: $0

Project Description: Laurens Ed Becham Rd - (County contribution of $135,908 to complete)

HG-0812 Cadwell Coleman St Seg 1 - Laurens


PI No: 0012201

Regional Project Id: HG-0812

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $17,712

Invoiced to Date: $277

Project Description: Cadwell Coleman St Seg 1

HG-0813 Cadwell Coleman St Seg 2 - Laurens


PI No: 0012202

Regional Project Id: HG-0813

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $16,837

Invoiced to Date: $264

Project Description: Cadwell Coleman St Seg 2

HG-0808 Cadwell Colter St - Laurens


PI No: 0012203

Regional Project Id: HG-0808

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $13,151

Invoiced to Date: $15,633

Project Description: Cadwell Colter St

HG-0809 Cadwell Snowhill St - Hwy 117 to Railroad - Laurens


PI No: 0012204

Regional Project Id: HG-0809

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $12,833

Invoiced to Date: $200

Project Description: Cadwell Snowhill St - Hwy 117 to Railroad

HG-0814 Cadwell Coleman St Seg 3 - Laurens


PI No: 0012205

Regional Project Id: HG-0814

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $12,674

Invoiced to Date: $0

Project Description: Cadwell Coleman St Seg 3

HG-0811 Cadwell Walnut St - Hwy 126 to Snowhill - Laurens


PI No: 0012206

Regional Project Id: HG-0811

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $12,249

Invoiced to Date: $461

Project Description: Cadwell Walnut St - Hwy 126 to Snowhill

HG-0815 Cadwell Coleman St Seg 4 - Laurens


PI No: 0012207

Regional Project Id: HG-0815

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $25,162

Invoiced to Date: $0

Project Description: Cadwell Coleman St Seg 4

HG-0810 Cadwell Walnut McCook St - Laurens


PI No: 0012208

Regional Project Id: HG-0810

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $25,321

Invoiced to Date: $0

Project Description: Cadwell Walnut McCook St

HG-0816 Cadwell Coleman St Seg 5 - Laurens


PI No: 0012209

Regional Project Id: HG-0816

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $30,014

Invoiced to Date: $0

Project Description: Cadwell Coleman St Seg 5

HG-0818 Dexter Shy St - Hwy 339 to Cemetery - Laurens


PI No: 0012210

Regional Project Id: HG-0818

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $46,339

Invoiced to Date: $31,793

Project Description: Dexter Shy St - Hwy 339 to Cemetery

HG-0819 Dexter Railroad St - Laurens


PI No: 0012211

Regional Project Id: HG-0819

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $59,005

Invoiced to Date: $35,017

Project Description: Dexter Railroad St

HG-0821 Dexter Harvey St Seg 1 - Laurens


PI No: 0012212

Regional Project Id: HG-0821

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $50,024

Invoiced to Date: $48,280

Project Description: Dexter Harvey St Seg 1

HG-0825 Dexter Harvey St Seg 2 - Laurens


PI No: 0012213

Regional Project Id: HG-0825

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $30,182

Invoiced to Date: $32,867

Project Description: Dexter Harvey St Seg 2

HG-0822 Dexter Bryant St Seg 1 - Laurens


PI No: 0012214

Regional Project Id: HG-0822

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $40,752

Invoiced to Date: $25,078

Project Description: Dexter Bryant St Seg 1

HG-0826 Dexter Bryant St Seg 2 - Laurens


PI No: 0012215

Regional Project Id: HG-0826

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $13,255

Invoiced to Date: $0

Project Description: Dexter Bryant St Seg 2

HG-0831 Dublin Hodges St - Laurens


PI No: 0012216

Regional Project Id: HG-0831

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Intersection Improvements

Band: 1:2013 to 2015

Original Project Budgeted: $1,130,000

Invoiced to Date: $1,092,948

Project Description: Dublin Hodges St

HG-0830 Dublin Springdale Rd - Laurens


PI No: 0012217

Regional Project Id: HG-0830

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Intersection Improvements

Band: 2:2016 to 2019

Original Project Budgeted: $575,000

Invoiced to Date: $0

Project Description: Dublin Springdale Rd

HG-0832 Dublin Stubbs Park Rd - Laurens


PI No: 0012218

Regional Project Id: HG-0832

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Roadway Project

Band: 3:2020 to 2022

Original Project Budgeted: $3,530,000

Invoiced to Date: $0

Project Description: Dublin Stubbs Park Rd

HG-0834 Dudley Seventh St - Laurens


PI No: 0012219

Regional Project Id: HG-0834

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $24,287

Invoiced to Date: $22,653

Project Description: Dudley Seventh St

HG-0838 Dudley Caroll Dr - Laurens


PI No: 0012220

Regional Project Id: HG-0838

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $22,617

Invoiced to Date: $13,202

Project Description: Dudley Caroll Dr

HG-0837 Dudley Chestnut Dr - Laurens


PI No: 0012221

Regional Project Id: HG-0837

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $15,352

Invoiced to Date: $11,088

Project Description: Dudley Chestnut Dr

HG-0833 Dudley Carroll St - Laurens


PI No: 0012222

Regional Project Id: HG-0833

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $12,462

Invoiced to Date: $7,673

Project Description: Dudley Carroll St

HG-0840 Dudley West St - Laurens


PI No: 0012223

Regional Project Id: HG-0840

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $36,882

Invoiced to Date: $30,170

Project Description: Dudley West St

HG-0835 Dudley Pecan St - Laurens


PI No: 0012224

Regional Project Id: HG-0835

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $34,920

Invoiced to Date: $31,524

Project Description: Dudley Pecan St

HG-0839 Dudley Oak St - Laurens


PI No: 0012225

Regional Project Id: HG-0839

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $77,820

Invoiced to Date: $0

Project Description: Dudley Oak St

HG-0873 East Dublin Circle Dr - Laurens


PI No: 0012226

Regional Project Id: HG-0873

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $61,992

Invoiced to Date: $35,889

Project Description: East Dublin Circle Dr

HG-0842 East Dublin Celia St - Laurens


PI No: 0012227

Regional Project Id: HG-0842

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $41,231

Invoiced to Date: $24,218

Project Description: East Dublin Celia St

HG-0843 East Dublin Dwayne Dr - Laurens


PI No: 0012228

Regional Project Id: HG-0843

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $22,246

Invoiced to Date: $10,431

Project Description: East Dublin Dwayne Dr

HG-0845 East Dublin Price St - Laurens


PI No: 0012229

Regional Project Id: HG-0845

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $17,023

Invoiced to Date: $11,892

Project Description: East Dublin Price St

HG-0846 East Dublin South Elm St - Laurens


PI No: 0012230

Regional Project Id: HG-0846

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $26,780

Invoiced to Date: $25,343

Project Description: East Dublin South Elm St

HG-0844 East Dublin Rice St - Laurens


PI No: 0012231

Regional Project Id: HG-0844

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $46,269

Invoiced to Date: $29,493

Project Description: East Dublin Rice St

HG-0847 East Dublin Keen St - Laurens


PI No: 0012232

Regional Project Id: HG-0847

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $31,182

Invoiced to Date: $0

Project Description: East Dublin Keen St

HG-0848 East Dublin Stanley St - Laurens


PI No: 0012233

Regional Project Id: HG-0848

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $7,955

Invoiced to Date: $0

Project Description: East Dublin Stanley St

HG-0849 East Dublin Virginia St - Laurens


PI No: 0012234

Regional Project Id: HG-0849

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $28,159

Invoiced to Date: $0

Project Description: East Dublin Virginia St

HG-0850 East Dublin Daley St - Laurens


PI No: 0012235

Regional Project Id: HG-0850

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $32,640

Invoiced to Date: $0

Project Description: East Dublin Daley St

HG-0851 East Dublin Joiner St - Laurens


PI No: 0012236

Regional Project Id: HG-0851

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $25,905

Invoiced to Date: $0

Project Description: East Dublin Joiner St

HG-0852 East Dublin Derriso Ln - Laurens


PI No: 0012237

Regional Project Id: HG-0852

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $28,239

Invoiced to Date: $0

Project Description: East Dublin Derriso Ln

HG-0853 East Dublin North Elm St - Laurens


PI No: 0012238

Regional Project Id: HG-0853

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $39,189

Invoiced to Date: $0

Project Description: East Dublin North Elm St

HG-0856 East Dublin Piedmont Dr - Laurens


PI No: 0012239

Regional Project Id: HG-0856

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $20,417

Invoiced to Date: $0

Project Description: East Dublin Piedmont Dr

HG-0857 East Dublin Torino Dr - Laurens


PI No: 0012240

Regional Project Id: HG-0857

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $11,136

Invoiced to Date: $0

Project Description: East Dublin Torino Dr

HG-0858 East Dublin Falcon Dr - Laurens


PI No: 0012241

Regional Project Id: HG-0858

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $8,670

Invoiced to Date: $0

Project Description: East Dublin Falcon Dr

HG-0874 East Dublin Glen Dr - Laurens


PI No: 0012242

Regional Project Id: HG-0874

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $31,845

Invoiced to Date: $0

Project Description: East Dublin Glen Dr

HG-0872 East Dublin Lewis St - Laurens


PI No: 0012243

Regional Project Id: HG-0872

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $11,375

Invoiced to Date: $0

Project Description: East Dublin Lewis St

HG-0876 East Dublin Attaway - Laurens


PI No: 0012244

Regional Project Id: HG-0876

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $72,678

Invoiced to Date: $0

Project Description: East Dublin Attaway

HG-0877 East Dublin West Drive - Laurens


PI No: 0012245

Regional Project Id: HG-0877

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $32,905

Invoiced to Date: $0

Project Description: East Dublin West Drive

HG-0859 East Dublin Atwood Dr - Laurens


PI No: 0012246

Regional Project Id: HG-0859

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $28,371

Invoiced to Date: $0

Project Description: East Dublin Atwood Dr

HG-0860 East Dublin Jordan St - Laurens


PI No: 0012247

Regional Project Id: HG-0860

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $23,227

Invoiced to Date: $0

Project Description: East Dublin Jordan St

HG-0861 East Dublin Marion St - Laurens


PI No: 0012248

Regional Project Id: HG-0861

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $58,811

Invoiced to Date: $0

Project Description: East Dublin Marion St

HG-0862 East Dublin Braham St - Laurens


PI No: 0012249

Regional Project Id: HG-0862

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $37,121

Invoiced to Date: $0

Project Description: East Dublin Braham St

HG-0863 East Dublin Rosewood Dr - Laurens


PI No: 0012250

Regional Project Id: HG-0863

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $18,905

Invoiced to Date: $9

Project Description: East Dublin Rosewood Dr

HG-0864 East Dublin Larsen St - Laurens


PI No: 0012251

Regional Project Id: HG-0864

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $38,420

Invoiced to Date: $0

Project Description: East Dublin Larsen St

HG-0865 East Dublin South Dr - Laurens


PI No: 0012252

Regional Project Id: HG-0865

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $18,110

Invoiced to Date: $0

Project Description: East Dublin South Dr

HG-0866 East Dublin Buckingham - Laurens


PI No: 0012253

Regional Project Id: HG-0866

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $109,269

Invoiced to Date: $0

Project Description: East Dublin Buckingham

HG-0895 East Dublin Powell Dr - Laurens


PI No: 0012254

Regional Project Id: HG-0895

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $34,894

Invoiced to Date: $0

Project Description: East Dublin Powell Dr

HG-0867 East Dublin Ferry St Seg 1 - Laurens


PI No: 0012255

Regional Project Id: HG-0867

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $35,901

Invoiced to Date: $0

Project Description: East Dublin Ferry St Seg 1

HG-0868 East Dublin Getty St - Laurens


PI No: 0012256

Regional Project Id: HG-0868

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $34,523

Invoiced to Date: $0

Project Description: East Dublin Getty St

HG-0869 East Dublin Taylor Ln - Laurens


PI No: 0012257

Regional Project Id: HG-0869

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $12,144

Invoiced to Date: $0

Project Description: East Dublin Taylor Ln

HG-0870 East Dublin Poplar St - Laurens


PI No: 0012258

Regional Project Id: HG-0870

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $62,008

Invoiced to Date: $0

Project Description: East Dublin Poplar St

HG-0871 East Dublin Stewart St - Laurens


PI No: 0012259

Regional Project Id: HG-0871

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $33,303

Invoiced to Date: $0

Project Description: East Dublin Stewart St

HG-0875 East Dublin Dorsey St - Laurens


PI No: 0012260

Regional Project Id: HG-0875

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $20,549

Invoiced to Date: $0

Project Description: East Dublin Dorsey St

HG-0878 East Dublin Jackson St - Laurens


PI No: 0012261

Regional Project Id: HG-0878

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $25,826

Invoiced to Date: $0

Project Description: East Dublin Jackson St

HG-0879 East Dublin Ferry St Seg 2 - Part (Circle Dr to Johnson St) - Laurens


PI No: 0012262

Regional Project Id: HG-0879

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $28,769

Invoiced to Date: $0

Project Description: East Dublin Ferry St Seg 2 - Part (Circle Dr to Johnson St)

HG-0899 Montrose Spur One - Laurens


PI No: 0012263

Regional Project Id: HG-0899

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $42,000

Invoiced to Date: $30,556

Project Description: Montrose Spur One

HG-0896 Montrose Railroad St - Part (.22 mile) - Laurens


PI No: 0012264

Regional Project Id: HG-0896

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $30,606

Invoiced to Date: $26,504

Project Description: Montrose Railroad St - Part (.22 mile)

HG-0909 Rentz Pughsley Ave - Laurens


PI No: 0012265

Regional Project Id: HG-0909

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $16,465

Invoiced to Date: $15,702

Project Description: Rentz Pughsley Ave

HG-0902 Rentz Bedingfield St - Laurens


PI No: 0012266

Regional Project Id: HG-0902

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $16,121

Invoiced to Date: $14,678

Project Description: Rentz Bedingfield St

HG-0900 Rentz Bates Ave Seg 1 - Laurens


PI No: 0012267

Regional Project Id: HG-0900

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $21,901

Invoiced to Date: $20,883

Project Description: Rentz Bates Ave Seg 1

HG-0910 Rentz West Railroad St - Laurens


PI No: 0012268

Regional Project Id: HG-0910

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $24,791

Invoiced to Date: $1,091

Project Description: Rentz West Railroad St

HG-0911 Rentz Simpson Ave - Laurens


PI No: 0012269

Regional Project Id: HG-0911

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $27,973

Invoiced to Date: $880

Project Description: Rentz Simpson Ave

HG-0904 Rentz Circle Dr - Laurens


PI No: 0012270

Regional Project Id: HG-0904

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $34,946

Invoiced to Date: $0

Project Description: Rentz Circle Dr

HG-0912 Montgomery Thompson Pond Rd Ph 1


PI No: 0012271

Regional Project Id: HG-0912

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $338,997

Invoiced to Date: $206,415

Project Description: Montgomery Thompson Pond Rd Ph 1

HG-0913 Montgomery Thompson Pond Rd Ph 2


PI No: 0012272

Regional Project Id: HG-0913

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $443,520

Invoiced to Date: $314,680

Project Description: Montgomery Thompson Pond Rd Ph 2

HG-0914 Montgomery Thompson Pond Rd Ph 3


PI No: 0012273

Regional Project Id: HG-0914

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $525,000

Invoiced to Date: $421,065

Project Description: Montgomery Thompson Pond Rd Ph 3

HG-0915 Montgomery Thompson Pond Rd Ph 4


PI No: 0012274

Regional Project Id: HG-0915

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $525,000

Invoiced to Date: $470,091

Project Description: Montgomery Thompson Pond Rd Ph 4

HG-0916 Montgomery Taylor Springs Rd


PI No: 0012275

Regional Project Id: HG-0916

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $316,538

Invoiced to Date: $0

Project Description: Montgomery Taylor Springs Rd

HG-0935 Ailey West MLK Jr St Sidewalk - Montgomery


PI No: 0012276

Regional Project Id: HG-0935

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 1:2013 to 2015

Original Project Budgeted: $10,000

Invoiced to Date: $8,915

Project Description: Ailey West MLK Jr St Sidewalk (Rapid Response)

HG-0934 Ailey East MLK Jr Sidewalks - Montgomery


PI No: 0012277

Regional Project Id: HG-0934

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 1:2013 to 2015

Original Project Budgeted: $10,000

Invoiced to Date: $8,010

Project Description: Ailey East MLK Jr Sidewalks (Rapid Response)

HG-0933 Ailey South Broad St sidewalk - Montgomery


PI No: 0012278

Regional Project Id: HG-0933

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 1:2013 to 2015

Original Project Budgeted: $20,000

Invoiced to Date: $18,198

Project Description: Ailey South Broad St sidewalk (Rapid Response)

HG-0931 Ailey East Gum St - Montgomery


PI No: 0012279

Regional Project Id: HG-0931

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $32,000

Invoiced to Date: $29,443

Project Description: Ailey East Gum St

HG-0932 Ailey S Lee St - Montgomery


PI No: 0012280

Regional Project Id: HG-0932

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $16,000

Invoiced to Date: $15,857

Project Description: Ailey S Lee St

HG-0930 Ailey East Peachtree St - Montgomery


PI No: 0012281

Regional Project Id: HG-0930

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $16,000

Invoiced to Date: $11,037

Project Description: Ailey East Peachtree St

HG-0929 Ailey North Broad St - Montgomery


PI No: 0012282

Regional Project Id: HG-0929

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $64,000

Invoiced to Date: $36,547

Project Description: Ailey North Broad St

HG-0928 Ailey West Old Ailey Lothair Rd - Montgomery


PI No: 0012283

Regional Project Id: HG-0928

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $40,000

Invoiced to Date: $0

Project Description: Ailey West Old Ailey Lothair Rd

HG-0927 Ailey City Street Striping - Montgomery


PI No: 0012284

Regional Project Id: HG-0927

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Pavement Markings

Band: 3:2020 to 2022

Original Project Budgeted: $18,480

Invoiced to Date: $0

Project Description: Ailey City Street Striping

HG-0936 Alston Outler St - Montgomery


PI No: 0012285

Regional Project Id: HG-0936

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $30,000

Invoiced to Date: $29,381

Project Description: Alston Outler St

HG-0937 Alston Church St - Montgomery


PI No: 0012286

Regional Project Id: HG-0937

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $8,000

Invoiced to Date: $750

Project Description: Alston Church St

HG-0938 Alston Wilkes Circle - Montgomery


PI No: 0012287

Regional Project Id: HG-0938

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $33,302

Invoiced to Date: $0

Project Description: Alston Wilkes Circle - Part (From Carrie Drive North approximately .11 miles)

HG-0953 Mt Vernon Church St - Montgomery


PI No: 0012288

Regional Project Id: HG-0953

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $98,000

Invoiced to Date: $75,911

Project Description: Mt Vernon Church St

HG-0956 Mt Vernon Johnson St - Montgomery


PI No: 0012289

Regional Project Id: HG-0956

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $70,000

Invoiced to Date: $54,222

Project Description: Mt Vernon Johnson St

HG-0954 Mt Vernon Dobbins St - Montgomery


PI No: 0012290

Regional Project Id: HG-0954

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $28,000

Invoiced to Date: $21,689

Project Description: Mt Vernon Dobbins St

HG-0955 Mt Vernon Faye D Brewer St - Montgomery


PI No: 0012291

Regional Project Id: HG-0955

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $14,000

Invoiced to Date: $10,845

Project Description: Mt Vernon Faye D Brewer St

HG-0965 Mt Vernon Alston Rd - Montgomery


PI No: 0012292

Regional Project Id: HG-0965

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $56,000

Invoiced to Date: $0

Project Description: Mt Vernon Alston Rd

HG-0952 Mt Vernon W. Broad St - Montgomery


PI No: 0012293

Regional Project Id: HG-0952

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $67,200

Invoiced to Date: $47,018

Project Description: Mt Vernon W. Broad St

HG-0959 Mt Vernon MLK JR Dr - Montgomery


PI No: 0012294

Regional Project Id: HG-0959

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $109,200

Invoiced to Date: $0

Project Description: Mt Vernon MLK JR Dr

HG-0957 Mt Vernon Lester Robinson - Montgomery


PI No: 0012295

Regional Project Id: HG-0957

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $70,000

Invoiced to Date: $34,584

Project Description: Mt Vernon Lester Robinson

HG-0950 Mt Vernon Old Ailey Lothair Rd - Montgomery


PI No: 0012296

Regional Project Id: HG-0950

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $168,000

Invoiced to Date: $95,738

Project Description: Mt Vernon Old Ailey Lothair Rd

HG-0946 Mt Vernon Robinson St - Montgomery


PI No: 0012297

Regional Project Id: HG-0946

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $105,000

Invoiced to Date: $0

Project Description: Mt Vernon Robinson St

HG-0942 Mt Vernon North Washington St - Montgomery


PI No: 0012298

Regional Project Id: HG-0942

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $109,200

Invoiced to Date: $0

Project Description: Mt Vernon North Washington St

HG-0941 Mt Vernon South Washington St - Montgomery


PI No: 0012299

Regional Project Id: HG-0941

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $27,976

Invoiced to Date: $0

Project Description: Mt Vernon South Washington St

HG-1370 Hamilton-Tarrytown Road (resurfacing) - Montgomery


PI No: 0012300

Regional Project Id: HG-1370

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $44,100

Invoiced to Date: $26,508

Project Description: Hamilton-Tarrytown Road (resurfacing) - Part (Begin at SR 15/29 and go .315 miles)

HG-0968 Vidalia Miracle Lane - Montgomery


PI No: 0012301

Regional Project Id: HG-0968

County: Montgomery

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $60,865

Invoiced to Date: $46,291

Project Description: Vidalia Miracle Lane

HG-0972 Tattnall Dennis Oliver Rd


PI No: 0012302

Regional Project Id: HG-0972

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $467,500

Invoiced to Date: $467,500

Project Description: Tattnall Dennis Oliver Rd

HG-0975 Tattnall Raymond Bland Rd


PI No: 0012303

Regional Project Id: HG-0975

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $570,150

Invoiced to Date: $482,397

Project Description: Tattnall Raymond Bland Rd

HG-0976 Tattnall Cyril Burkhalter and Mile Field Rd


PI No: 0012304

Regional Project Id: HG-0976

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 3:2020 to 2022

Original Project Budgeted: $909,040

Invoiced to Date: $0

Project Description: Tattnall Cyril Burkhalter and Mile Field Rd (Part) (Begin at Cyril Burkhalter RD GA 23/57 and End at US 301/73

HG-0977 Tattnall Lynntown Rd


PI No: 0012305

Regional Project Id: HG-0977

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $2,052,400

Invoiced to Date: $1,730,127

Project Description: Tattnall Lynntown Rd

HG-0978 Tattnall Bubba Kennedy Rd


PI No: 0012306

Regional Project Id: HG-0978

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $966,000

Invoiced to Date: $825,961

Project Description: Tattnall Bubba Kennedy Rd

HG-0980 Tattnall Hillview Rd


PI No: 0012307

Regional Project Id: HG-0980

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $1,132,500

Invoiced to Date: $0

Project Description: Tattnall Hillview Rd

HG-0987 Tattnall Airport Rd


PI No: 0012308

Regional Project Id: HG-0987

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $610,000

Invoiced to Date: $0

Project Description: Tattnall Airport Rd

HG-1008 Collins Broad St - Tattnall


PI No: 0012309

Regional Project Id: HG-1008

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $13,710

Invoiced to Date: $12,807

Project Description: Collins Broad St

HG-1001 Collins Plant St - Tattnall


PI No: 0012310

Regional Project Id: HG-1001

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $2,800

Invoiced to Date: $5,427

Project Description: Collins Plant St

HG-1007 Collins Pine St - Tattnall


PI No: 0012311

Regional Project Id: HG-1007

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $10,267

Invoiced to Date: $15,284

Project Description: Collins Pine St

HG-1005 Collins Pearl St - Tattnall


PI No: 0012312

Regional Project Id: HG-1005

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $56,000

Invoiced to Date: $0

Project Description: Collins Pearl St

HG-1006 Collins Jones St - Tattnall


PI No: 0012313

Regional Project Id: HG-1006

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $11,550

Invoiced to Date: $0

Project Description: Collins Jones St

HG-1004 Collins Church St - Tattnall


PI No: 0012314

Regional Project Id: HG-1004

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,867

Invoiced to Date: $0

Project Description: Collins Church St

HG-1003 Collins Williams St - Tattnall


PI No: 0012315

Regional Project Id: HG-1003

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $4,375

Invoiced to Date: $0

Project Description: Collins Williams St

HG-1002 Collins Railroad St - Tattnall


PI No: 0012316

Regional Project Id: HG-1002

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $7,000

Invoiced to Date: $0

Project Description: Collins Railroad St

HG-1036 Glennville Hilltop Rd - Tattnall


PI No: 0012317

Regional Project Id: HG-1036

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $154,420

Invoiced to Date: $152,200

Project Description: Glennville Hilltop Rd

HG-1023 Glennville Durrence St - Tattnall


PI No: 0012318

Regional Project Id: HG-1023

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $12,740

Invoiced to Date: $12,557

Project Description: Glennville Durrence St

HG-1012 Glennville Bonnie St - Tattnall


PI No: 0012319

Regional Project Id: HG-1012

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $25,760

Invoiced to Date: $25,389

Project Description: Glennville Bonnie St

HG-1048 Glennville Mendel Ave East - Tattnall


PI No: 0012320

Regional Project Id: HG-1048

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $23,100

Invoiced to Date: $22,768

Project Description: Glennville Mendel Ave East

HG-1013 Glennville Caswell St - Tattnall


PI No: 0012321

Regional Project Id: HG-1013

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $140,560

Invoiced to Date: $138,539

Project Description: Glennville Caswell St

HG-1051 Glennville Park Ave - Tattnall


PI No: 0012322

Regional Project Id: HG-1051

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,960

Invoiced to Date: $12,562

Project Description: Glennville Park Ave

HG-1042 Glennville Laura St - Tattnall


PI No: 0012323

Regional Project Id: HG-1042

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $67,340

Invoiced to Date: $63,270

Project Description: Glennville Laura St

HG-1021 Glennville Cowart Ave - Tattnall


PI No: 0012324

Regional Project Id: HG-1021

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $42,700

Invoiced to Date: $36,091

Project Description: Glennville Cowart Ave

HG-1059 Glennville Sylvester Ashford Dr - Tattnall


PI No: 0012325

Regional Project Id: HG-1059

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $98,560

Invoiced to Date: $91,792

Project Description: Glennville Sylvester Ashford Dr

HG-1031 Glennville Hal St - Tattnall


PI No: 0012326

Regional Project Id: HG-1031

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $12,040

Invoiced to Date: $10,885

Project Description: Glennville Hal St

HG-1024 Glennville Gordon St - Tattnall


PI No: 0012327

Regional Project Id: HG-1024

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $49,980

Invoiced to Date: $41,541

Project Description: Glennville Gordon St

HG-1020 Glennville Corene Ave - Tattnall


PI No: 0012328

Regional Project Id: HG-1020

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $14,700

Invoiced to Date: $12,470

Project Description: Glennville Corene Ave

HG-1046 Glennville Mann St - Tattnall


PI No: 0012329

Regional Project Id: HG-1046

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $72,520

Invoiced to Date: $66,531

Project Description: Glennville Mann St

HG-1043 Glennville Lewis St - Tattnall


PI No: 0012330

Regional Project Id: HG-1043

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $29,400

Invoiced to Date: $24,065

Project Description: Glennville Lewis St

HG-1025 Glennville Adamson Ave - Tattnall


PI No: 0012331

Regional Project Id: HG-1025

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $24,920

Invoiced to Date: $21,077

Project Description: Glennville Adamson Ave

HG-1037 Glennville Institute St - Tattnall


PI No: 0012332

Regional Project Id: HG-1037

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,540

Invoiced to Date: $12,562

Project Description: Glennville Institute St

HG-1015 Glennville Charlton St - Tattnall


PI No: 0012333

Regional Project Id: HG-1015

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $42,840

Invoiced to Date: $34,348

Project Description: Glennville Charlton St

HG-1049 Glennville Oakdale Dr - Tattnall


PI No: 0012334

Regional Project Id: HG-1049

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $20,440

Invoiced to Date: $17,388

Project Description: Glennville Oakdale Dr

HG-1055 Glennville Rowland Ave - Tattnall


PI No: 0012335

Regional Project Id: HG-1055

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $14,560

Invoiced to Date: $12,382

Project Description: Glennville Rowland Ave

HG-1017 Glennville Church St - Tattnall


PI No: 0012336

Regional Project Id: HG-1017

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $85,120

Invoiced to Date: $70,182

Project Description: Glennville Church St

HG-1032 Glennville Hencart Rd (East) - Tattnall


PI No: 0012337

Regional Project Id: HG-1032

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $113,960

Invoiced to Date: $105,555

Project Description: Glennville Hencart Rd (East)

HG-1041 Glennville Lakeview Dr - Tattnall


PI No: 0012338

Regional Project Id: HG-1041

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $63,980

Invoiced to Date: $0

Project Description: Glennville Lakeview Dr

HG-1009 Glennville Azalea Rd - Tattnall


PI No: 0012339

Regional Project Id: HG-1009

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $39,620

Invoiced to Date: $33,635

Project Description: Glennville Azalea Rd

HG-1035 Glennville Herrington St - Tattnall


PI No: 0012340

Regional Project Id: HG-1035

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $119,700

Invoiced to Date: $102,652

Project Description: Glennville Herrington St

HG-1038 Glennville Irvin St - Tattnall


PI No: 0012341

Regional Project Id: HG-1038

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $31,780

Invoiced to Date: $31,059

Project Description: Glennville Irvin St

HG-1030 Glennville Greenwood Dr - Tattnall


PI No: 0012342

Regional Project Id: HG-1030

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $46,480

Invoiced to Date: $39,574

Project Description: Glennville Greenwood Dr

HG-1039 Glennville Kelley St - Tattnall


PI No: 0012343

Regional Project Id: HG-1039

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $12,040

Invoiced to Date: $10,274

Project Description: Glennville Kelley St

HG-1022 Glennville-DeLoach Lane - Tattnall


PI No: 0012344

Regional Project Id: HG-1022

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $42,140

Invoiced to Date: $35,481

Project Description: Glennville-DeLoach Lane

HG-1058 Glennville Simon St - Tattnall


PI No: 0012345

Regional Project Id: HG-1058

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $86,660

Invoiced to Date: $73,592

Project Description: Glennville Simon St

HG-1063 Glennville Water St - Tattnall


PI No: 0012346

Regional Project Id: HG-1063

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $39,760

Invoiced to Date: $35,990

Project Description: Glennville Water St

HG-1019 Glennville Continental Dr - Tattnall


PI No: 0012347

Regional Project Id: HG-1019

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $37,660

Invoiced to Date: $0

Project Description: Glennville Continental Dr

HG-1057 Glennville Sharon Rd - Tattnall


PI No: 0012348

Regional Project Id: HG-1057

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $24,220

Invoiced to Date: $0

Project Description: Glennville Sharon Rd

HG-1060 Glennville Taylor Lane - Tattnall


PI No: 0012349

Regional Project Id: HG-1060

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $24,500

Invoiced to Date: $0

Project Description: Glennville Taylor Lane

HG-1053 Glennville Queen Dr - Tattnall


PI No: 0012350

Regional Project Id: HG-1053

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $33,460

Invoiced to Date: $0

Project Description: Glennville Queen Dr

HG-1010 Glennville Baker St - Tattnall


PI No: 0012351

Regional Project Id: HG-1010

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $69,020

Invoiced to Date: $0

Project Description: Glennville Baker St

HG-1054 Glennville Railroad St - Tattnall


PI No: 0012352

Regional Project Id: HG-1054

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $135,520

Invoiced to Date: $0

Project Description: Glennville Railroad St

HG-1040 Glennville Kicklighter St - Tattnall


PI No: 0012353

Regional Project Id: HG-1040

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $40,180

Invoiced to Date: $0

Project Description: Glennville Kicklighter St

HG-1050 Glennville Oliver Ln - Tattnall


PI No: 0012354

Regional Project Id: HG-1050

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $68,180

Invoiced to Date: $59,110

Project Description: Glennville Oliver Ln

HG-1014 Glennville Cedar St - Tattnall


PI No: 0012355

Regional Project Id: HG-1014

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $61,460

Invoiced to Date: $0

Project Description: Glennville Cedar St

HG-1056 Glennville Rustin St - Tattnall


PI No: 0012356

Regional Project Id: HG-1056

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $51,380

Invoiced to Date: $0

Project Description: Glennville Rustin St

HG-1016 Glennville China St - Tattnall


PI No: 0012357

Regional Project Id: HG-1016

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $70,280

Invoiced to Date: $0

Project Description: Glennville China St

HG-1011 Glennville Banks St - Tattnall


PI No: 0012358

Regional Project Id: HG-1011

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $106,680

Invoiced to Date: $0

Project Description: Glennville Banks St

HG-1045 Glennville Loves Chapel Rd - Tattnall


PI No: 0012359

Regional Project Id: HG-1045

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $140,700

Invoiced to Date: $0

Project Description: Glennville Loves Chapel Rd

HG-1070 Reidsville Brumby Ave - Tattnall


PI No: 0012360

Regional Project Id: HG-1070

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $105,000

Invoiced to Date: $104,449

Project Description: Reidsville Brumby Ave

HG-1077 Reidsville Lloyd St - Tattnall


PI No: 0012361

Regional Project Id: HG-1077

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $174,528

Invoiced to Date: $172,651

Project Description: Reidsville Lloyd St

HG-1081 Reidsville Ohoopee St - Tattnall


PI No: 0012362

Regional Project Id: HG-1081

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $129,418

Invoiced to Date: $0

Project Description: Reidsville Ohoopee St

HG-1086 Reidsville Woodlawn Terrace - Tattnall


PI No: 0012363

Regional Project Id: HG-1086

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $57,681

Invoiced to Date: $0

Project Description: Reidsville Woodlawn Terrace

HG-1085 Reidsville Smith St - Tattnall


PI No: 0012364

Regional Project Id: HG-1085

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $110,827

Invoiced to Date: $92,842

Project Description: Reidsville Smith St

HG-1065 Reidsville Memorial Drive Sidewalk - Tattnall


PI No: 0012365

Regional Project Id: HG-1065

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 2:2016 to 2019

Original Project Budgeted: $24,223

Invoiced to Date: $0

Project Description: Reidsville Memorial Drive Sidewalk

HG-1080 Reidsville Nelson St - Tattnall


PI No: 0012366

Regional Project Id: HG-1080

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $21,587

Invoiced to Date: $0

Project Description: Reidsville Nelson St

HG-1079 Reidsville McLeod St - Tattnall


PI No: 0012367

Regional Project Id: HG-1079

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $23,179

Invoiced to Date: $0

Project Description: Reidsville McLeod St

HG-1069 Reidsville Blount St - Tattnall


PI No: 0012368

Regional Project Id: HG-1069

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $104,621

Invoiced to Date: $0

Project Description: Reidsville Blount St

HG-1067 Reidsville Anderson St - Tattnall


PI No: 0012369

Regional Project Id: HG-1067

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $112,100

Invoiced to Date: $0

Project Description: Reidsville Anderson St

HG-1071 Reidsville Chandler Ave - Tattnall


PI No: 0012370

Regional Project Id: HG-1071

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $148,883

Invoiced to Date: $0

Project Description: Reidsville Chandler Ave

HG-1072 Reidsville Church St - Tattnall


PI No: 0012371

Regional Project Id: HG-1072

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $36,651

Invoiced to Date: $0

Project Description: Reidsville Church St

HG-1074 Reidsville Glenview Dr - Tattnall


PI No: 0012372

Regional Project Id: HG-1074

County: Tattnall

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $24,743

Invoiced to Date: $0

Project Description: Reidsville Glenview Dr

HG-1094 Telfair 5311 Capital


PI No: 0012373

Regional Project Id: HG-1094

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Transit

Band: 1:2013 to 2015

Original Project Budgeted: $19,820

Invoiced to Date: $3,713

Project Description: Telfair 5311 Capitial

HG-1087 Telfair McRae Milan Rd


PI No: 0012374

Regional Project Id: HG-1087

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $216,000

Invoiced to Date: $211,909

Project Description: Telfair McRae Milan Rd

HG-1089 Telfair Owens Rd


PI No: 0012375

Regional Project Id: HG-1089

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $64,000

Invoiced to Date: $62,788

Project Description: Telfair Owens Rd

HG-1090 Telfair Tom Haley Rd


PI No: 0012376

Regional Project Id: HG-1090

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $808,000

Invoiced to Date: $4,596

Project Description: Telfair Tom Haley Rd

HG-1092 Telfair Fishing Creek Rd


PI No: 0012377

Regional Project Id: HG-1092

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $352,000

Invoiced to Date: $0

Project Description: Telfair Fishing Creek Rd

HG-1093 Telfair Kinnett and Friendship Connector - Yawn Rd


PI No: 0012378

Regional Project Id: HG-1093

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $28,263

Invoiced to Date: $0

Project Description: Telfair Kinnett and Friendship Connector - Yawn Rd

HG-1095 Telfair 5311 Operations


PI No: 0012379

Regional Project Id: HG-1095

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Transit

Band: 1:2013 to 2015

Original Project Budgeted: $178,380

Invoiced to Date: $175,815

Project Description: Telfair 5311 Operations (Part)

HG-1097 Lumber City River St - Telfair


PI No: 0012380

Regional Project Id: HG-1097

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $50,400

Invoiced to Date: $43,305

Project Description: Lumber City River St

HG-1108 Lumber City Randall St - Telfair


PI No: 0012381

Regional Project Id: HG-1108

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $15,400

Invoiced to Date: $0

Project Description: Lumber City Randall St

HG-1100 Lumber City Johnson St - Telfair


PI No: 0012382

Regional Project Id: HG-1100

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $58,800

Invoiced to Date: $57,918

Project Description: Lumber City Johnson St

HG-1101 Lumber City West Ave - Telfair


PI No: 0012383

Regional Project Id: HG-1101

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $37,800

Invoiced to Date: $0

Project Description: Lumber City West Ave

HG-1103 Lumber City Broad St - Telfair


PI No: 0012384

Regional Project Id: HG-1103

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $49,000

Invoiced to Date: $48,265

Project Description: Lumber City Broad St

HG-1096 Lumber City Central Ave - Telfair


PI No: 0012385

Regional Project Id: HG-1096

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $60,200

Invoiced to Date: $59,297

Project Description: Lumber City Central Ave

HG-1098 Lumber City Church St - Telfair


PI No: 0012386

Regional Project Id: HG-1098

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $63,000

Invoiced to Date: $0

Project Description: Lumber City Church St

HG-1099 Lumber City Virginia Ave - Telfair


PI No: 0012387

Regional Project Id: HG-1099

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $46,200

Invoiced to Date: $45,507

Project Description: Lumber City Virginia Ave

HG-1102 Lumber City Pond Rd - Telfair


PI No: 0012388

Regional Project Id: HG-1102

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $50,400

Invoiced to Date: $49,644

Project Description: Lumber City Pond Rd

HG-1107 Lumber City Burns St - Telfair


PI No: 0012389

Regional Project Id: HG-1107

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $21,000

Invoiced to Date: $19,231

Project Description: Lumber City Burns St

HG-1105 Lumber City Sand Pit Rd - Telfair


PI No: 0012390

Regional Project Id: HG-1105

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $91,000

Invoiced to Date: $0

Project Description: Lumber City Sand Pit Rd

HG-1106 Lumber City E. Railroad St - Telfair


PI No: 0012391

Regional Project Id: HG-1106

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $84,000

Invoiced to Date: $81,121

Project Description: Lumber City E. Railroad St

HG-1104 Lumber City Pine St - Telfair


PI No: 0012392

Regional Project Id: HG-1104

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $21,000

Invoiced to Date: $0

Project Description: Lumber City Pine St

HG-1110 McRae Central Ave - Telfair


PI No: 0012393

Regional Project Id: HG-1110

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $11,900

Invoiced to Date: $11,674

Project Description: McRae Central Ave

HG-1111 McRae Langley Ave - Telfair


PI No: 0012394

Regional Project Id: HG-1111

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $11,900

Invoiced to Date: $11,674

Project Description: McRae Langley Ave

HG-1112 McRae Spring Ave - Telfair


PI No: 0012395

Regional Project Id: HG-1112

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $4,200

Invoiced to Date: $4,120

Project Description: McRae Spring Ave

HG-1113 McRae Railroad St - Telfair


PI No: 0012396

Regional Project Id: HG-1113

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $9,800

Invoiced to Date: $9,614

Project Description: McRae Railroad St

HG-1114, HG-1135 (Part) McRae Bruce St - Telfair


PI No: 0012397

Regional Project Id: HG-1114,

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $74,200

Invoiced to Date: $72,795

Project Description: HG-1135 (Part) McRae Bruce St (West Willow Creek to First Avenue) - (-$8,400)

HG-1129 (Part) McRae 2nd Ave Andrew St to Oak St - Telfair


PI No: 0012398

Regional Project Id: HG-1129

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $5,600

Invoiced to Date: $34

Project Description: (Part) McRae 2nd Ave Andrew St to Oak St

HG-1120 McRae First Ave - Telfair


PI No: 0012399

Regional Project Id: HG-1120

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $63,000

Invoiced to Date: $61,807

Project Description: McRae First Ave

HG-1121 (Part) McRae 8th Ave - Telfair


PI No: 0012400

Regional Project Id: HG-1121

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $40,600

Invoiced to Date: $39,831

Project Description: (Part) McRae 8th Ave (Oak St to Graham St)

HG-1122 McRae Lakeside Ave - Telfair


PI No: 0012401

Regional Project Id: HG-1122

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $56,000

Invoiced to Date: $54,939

Project Description: McRae Lakeside Ave

HG-1123 McRae Spring Ave - Telfair


PI No: 0012402

Regional Project Id: HG-1123

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $70,000

Invoiced to Date: $51,498

Project Description: McRae Spring Ave

HG-1124 McRae Industrial Blvd - Telfair


PI No: 0012403

Regional Project Id: HG-1124

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $150,000

Invoiced to Date: $134,963

Project Description: McRae Industrial Blvd

HG-1125 (Part) McRae Magnolia St - Telfair


PI No: 0012404

Regional Project Id: HG-1125

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $68,600

Invoiced to Date: $62,042

Project Description: (Part) McRae Magnolia St (West City Limits to Ellison Ave)

HG-1126 McRae East Ave - Telfair


PI No: 0012405

Regional Project Id: HG-1126

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $56,000

Invoiced to Date: $50,713

Project Description: McRae East Ave

HG-1127 (Part) McRae Telfair Ave - Telfair


PI No: 0012406

Regional Project Id: HG-1127

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $23,800

Invoiced to Date: $19,574

Project Description: (Part) McRae Telfair Ave (MLK Blvd to Parsonage St)

HG-1128 McRae College St - Telfair


PI No: 0012407

Regional Project Id: HG-1128

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $70,000

Invoiced to Date: $68,733

Project Description: McRae College St

HG-1129 (Part) McRae 2nd Ave Huckabee St to Willow Creek Lane - Telfair


PI No: 0012408

Regional Project Id: HG-1129

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $86,800

Invoiced to Date: $77,196

Project Description: (Part) McRae 2nd Ave Huckabee St to Willow Creek Lane

HG-1131 McRae 1st Ave - Telfair


PI No: 0012409

Regional Project Id: HG-1131

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $119,000

Invoiced to Date: $108,939

Project Description: McRae 1st Ave

HG-1132 McRae 5th Ave - Telfair


PI No: 0012410

Regional Project Id: HG-1132

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $98,000

Invoiced to Date: $0

Project Description: McRae 5th Ave

HG-1133 McRae Graham St - Telfair


PI No: 0012411

Regional Project Id: HG-1133

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $126,000

Invoiced to Date: $0

Project Description: McRae Graham St

HG-1134 McRae Brewton - Telfair


PI No: 0012412

Regional Project Id: HG-1134

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $182,000

Invoiced to Date: $0

Project Description: McRae Brewton

HG-1135 (Part) McRae Bruce (Macville Ave to East Willow Creek Lane) - Telfair


PI No: 0012413

Regional Project Id: HG-1135

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $5,040

Invoiced to Date: $0

Project Description: (Part) McRae Bruce (Macville Ave to East Willow Creek Lane)

HG-1136 McRae 4th Ave - Telfair


PI No: 0012414

Regional Project Id: HG-1136

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $154,000

Invoiced to Date: $0

Project Description: McRae 4th Ave

HG-1121 (Part) McRae 8th Ave (Liberty St to Willow Creek Lane) - Telfair


PI No: 0012415

Regional Project Id: HG-1121

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $22,400

Invoiced to Date: $0

Project Description: (Part) McRae 8th Ave (Liberty St to Willow Creek Lane)

HG-1127 (Part) McRae Telfair Ave (Smith to Willow Creek Lane) - Telfair


PI No: 0012416

Regional Project Id: HG-1127

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $104,918

Invoiced to Date: $0

Project Description: (Part) McRae Telfair Ave (Smith to Willow Creek Lane)

HG-1116 McRae Strozier Street - Telfair


PI No: 0012417

Regional Project Id: HG-1116

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $42,000

Invoiced to Date: $0

Project Description: McRae Strozier Street

HG-1137 Scotland Resurface 4th Ave to 4th Ave Ext - Telfair


PI No: 0012418

Regional Project Id: HG-1137

County: Telfair

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $98,000

Invoiced to Date: $47,876

Project Description: Scotland Resurface 4th Ave to 4th Ave Ext

HG-1141 Toombs Lyons Center Rd


PI No: 0012419

Regional Project Id: HG-1141

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $628,600

Invoiced to Date: $0

Project Description: Toombs Lyons Center Rd

HG-1140 Toombs County wide Striping


PI No: 0012420

Regional Project Id: HG-1140

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Pavement Markings

Band: 3:2020 to 2022

Original Project Budgeted: $279,900

Invoiced to Date: $0

Project Description: Toombs County wide Striping

HG-1147 Toombs 130 Accel-Decel Lane


PI No: 0012421

Regional Project Id: HG-1147

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Accel / Decel Lanes

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $165,974

Invoiced to Date: $161,902

Project Description: Toombs 130 Accel-Decel Lane

HG-1145 Toombs Providence Church Rd


PI No: 0012422

Regional Project Id: HG-1145

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $511,000

Invoiced to Date: $506,431

Project Description: Toombs Providence Church Rd

HG-1146 Toombs Donald Anderson


PI No: 0012423

Regional Project Id: HG-1146

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $319,200

Invoiced to Date: $316,346

Project Description: Toombs Donald Anderson

HG-1148 Toombs Five Point Resurfacing


PI No: 0012424

Regional Project Id: HG-1148

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $214,200

Invoiced to Date: $0

Project Description: Toombs Five Point Resurfacing

HG-1143 Toombs Mt Moriah Church Rd


PI No: 0012425

Regional Project Id: HG-1143

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $548,800

Invoiced to Date: $543,893

Project Description: Toombs Mt Moriah Church Rd

HG-1142 Toombs Marvin Church Rd


PI No: 0012426

Regional Project Id: HG-1142

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $845,600

Invoiced to Date: $838,040

Project Description: Toombs Marvin Church Rd

HG-1149 Toombs Ezra Taylor Rd


PI No: 0012427

Regional Project Id: HG-1149

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $1,140,000

Invoiced to Date: $963,930

Project Description: Toombs Ezra Taylor Rd

HG-1144 Toombs New Normantown Rd


PI No: 0012428

Regional Project Id: HG-1144

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $631,929

Invoiced to Date: $0

Project Description: Toombs New Normantown Rd

HG-1150 Lyons South Victory Dr - Toombs


PI No: 0012429

Regional Project Id: HG-1150

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $200,000

Invoiced to Date: $196,212

Project Description: Lyons South Victory Dr

HG-1151 Lyons West Oglethorpe Ave - Toombs


PI No: 0012430

Regional Project Id: HG-1151

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $200,000

Invoiced to Date: $0

Project Description: Lyons West Oglethorpe Ave

HG-1152 Lyons North Lanier and North Lexington - Toombs


PI No: 0012431

Regional Project Id: HG-1152

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $201,316

Invoiced to Date: $0

Project Description: Lyons North Lanier and North Lexington

HG-1154 Lyons SR 292 and Oxley Dr - Toombs


PI No: 0012432

Regional Project Id: HG-1154

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Intersection Improvements

Band: 2:2016 to 2019

Original Project Budgeted: $1,059,000

Invoiced to Date: $0

Project Description: Lyons SR 292 and Oxley Dr

HG-1157 Vidalia Mose Coleman Rd - Toombs


PI No: 0012433

Regional Project Id: HG-1157

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Roadway Project

Band: 2:2016 to 2019

Original Project Budgeted: $1,136,567

Invoiced to Date: $16,513

Project Description: Vidalia Mose Coleman Rd

HG-1156 Vidalia Michael Collins Dr - Toombs


PI No: 0012434

Regional Project Id: HG-1156

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Roadway Project

Band: 2:2016 to 2019

Original Project Budgeted: $125,000

Invoiced to Date: $1,816

Project Description: Vidalia Michael Collins Dr

HG-1159 Vidalia Airport Rd - Toombs


PI No: 0012435

Regional Project Id: HG-1159

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Roadway Project

Band: 2:2016 to 2019

Original Project Budgeted: $891,445

Invoiced to Date: $591,827

Project Description: Vidalia Airport Rd

HG-1155 Vidalia Adams Street - Toombs


PI No: 0012436

Regional Project Id: HG-1155

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $1,624,052

Invoiced to Date: $1,624,052

Project Description: Vidalia Adams Street

HG-1158 Vidalia Pete Phillips Rd - Toombs


PI No: 0012437

Regional Project Id: HG-1158

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $218,029

Invoiced to Date: $0

Project Description: Vidalia Pete Phillips Rd

HG-1160 Vidalia Brinson Rd - Toombs


PI No: 0012438

Regional Project Id: HG-1160

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 3:2020 to 2022

Original Project Budgeted: $221,010

Invoiced to Date: $0

Project Description: Vidalia Brinson Rd

HG-1161 Vidalia Lowery Place - Toombs


PI No: 0012439

Regional Project Id: HG-1161

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 3:2020 to 2022

Original Project Budgeted: $62,755

Invoiced to Date: $0

Project Description: Vidalia Lowery Place

HG-1162 Vidalia Curry St - Toombs


PI No: 0012440

Regional Project Id: HG-1162

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 3:2020 to 2022

Original Project Budgeted: $50,120

Invoiced to Date: $0

Project Description: Vidalia Curry St

HG-1163 Vidalia Truman St - Toombs


PI No: 0012441

Regional Project Id: HG-1163

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 3:2020 to 2022

Original Project Budgeted: $64,002

Invoiced to Date: $0

Project Description: Vidalia Truman St

HG-1164 Vidalia Rudell Rd - Toombs


PI No: 0012442

Regional Project Id: HG-1164

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 3:2020 to 2022

Original Project Budgeted: $114,975

Invoiced to Date: $0

Project Description: Vidalia Rudell Rd

HG-1165 Vidalia Semco Rd - Toombs


PI No: 0012443

Regional Project Id: HG-1165

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 3:2020 to 2022

Original Project Budgeted: $114,975

Invoiced to Date: $0

Project Description: Vidalia Semco Rd

HG-1167 Vidalia Upgrade Railroad Crossing (Part) (8 crossings) - Toombs


PI No: 0012444

Regional Project Id: HG-1167

County: Toombs

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Railroad Crossings

Band: 3:2020 to 2022

Original Project Budgeted: $157,500

Invoiced to Date: $0

Project Description: Vidalia Upgrade Railroad Crossing (Part) (8 crossings)

HG-1170 Treutlen Miller Pond Rd


PI No: 0012445

Regional Project Id: HG-1170

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $157,160

Invoiced to Date: $162,035

Project Description: Treutlen Miller Pond Rd (Part - 1.96 miles) (From Soperton City Limits to .4 miles beyond John Deere Rd)

HG-1174 Treutlen Lonesome Pine Rd


PI No: 0012446

Regional Project Id: HG-1174

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $136,000

Invoiced to Date: $154,510

Project Description: Treutlen Lonesome Pine Rd

HG-1187 Treutlen Anderson Pond Rd


PI No: 0012447

Regional Project Id: HG-1187

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $312,000

Invoiced to Date: $309,211

Project Description: Treutlen Anderson Pond Rd

HG-1180 Treutlen Holton Chapel Rd


PI No: 0012448

Regional Project Id: HG-1180

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $224,000

Invoiced to Date: $186,289

Project Description: Treutlen Holton Chapel Rd (Part - 2.8 miles) (From SR 56 to Ohoopee Bend Circle)

HG-1169 Treutlen Old Dair Rd - Wommack Rd


PI No: 0012449

Regional Project Id: HG-1169

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $80,000

Invoiced to Date: $79,285

Project Description: Treutlen Old Dair Rd - Wommack Rd

HG-1186 Treutlen Rosemont Church Rd


PI No: 0012450

Regional Project Id: HG-1186

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $188,000

Invoiced to Date: $186,319

Project Description: Treutlen Rosemont Church Rd (Part - 2.35 miles) (From SR 199 and go 2.35 miles)

HG-1177 Treutlen Ohoopee Bend Rd


PI No: 0012451

Regional Project Id: HG-1177

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $168,000

Invoiced to Date: $0

Project Description: Treutlen Ohoopee Bend Rd (2.1 miles) (From SR 86 to Ohoopee Bend Rd. Dead End)

HG-1176 Treutlen Deer Run Rd


PI No: 0012452

Regional Project Id: HG-1176

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $64,000

Invoiced to Date: $0

Project Description: Treutlen Deer Run Rd (Part - 0.8 miles) (From Oglethorpe Rd to Holton Chapel Rd)

HG-1182 Treutlen Tobacco Trail


PI No: 0012453

Regional Project Id: HG-1182

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $112,000

Invoiced to Date: $0

Project Description: Treutlen Tobacco Trail

HG-1178 Treutlen Norristown Rd


PI No: 0012454

Regional Project Id: HG-1178

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $24,000

Invoiced to Date: $0

Project Description: Treutlen Norristown Rd (Part - 0.3 miles) (3 bad spots of 0.1 mile each from Crooked Run Rd. to SR 171/US 221 at County Line)

HG-1181 Treutlen Crooked Run Rd


PI No: 0012455

Regional Project Id: HG-1181

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $100,000

Invoiced to Date: $0

Project Description: Treutlen Crooked Run Rd (Part - 1.25 miles, Segment 2) (From begin at Twin Pond Rd and go 1.25 miles)

HG-1173 Treutlen Secret Forest Rd


PI No: 0012456

Regional Project Id: HG-1173

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $80,000

Invoiced to Date: $0

Project Description: Treutlen Secret Forest Rd

HG-1216 Soperton Center Dr - Treutlen


PI No: 0012457

Regional Project Id: HG-1216

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $87,648

Invoiced to Date: $85,988

Project Description: Soperton Center Dr

HG-1191 Soperton Varnedo St - Treutlen


PI No: 0012458

Regional Project Id: HG-1191

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $35,000

Invoiced to Date: $16,721

Project Description: Soperton Varnedo St

HG-1232 Soperton Parkway Dr - Treutlen


PI No: 0012459

Regional Project Id: HG-1232

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $87,648

Invoiced to Date: $85,988

Project Description: Soperton Parkway Dr

HG-1222 Soperton Belk St - Treutlen


PI No: 0012460

Regional Project Id: HG-1222

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $91,000

Invoiced to Date: $87,663

Project Description: Soperton Belk St

HG-1200 Soperton Robby Lane - Treutlen


PI No: 0012461

Regional Project Id: HG-1200

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $15,400

Invoiced to Date: $6,070

Project Description: Soperton Robby Lane

HG-1217 Soperton Varnedo St - Treutlen


PI No: 0012462

Regional Project Id: HG-1217

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $38,552

Invoiced to Date: $0

Project Description: Soperton Varnedo St

HG-1211 Soperton Roydon Dr - Treutlen


PI No: 0012463

Regional Project Id: HG-1211

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $15,400

Invoiced to Date: $10,604

Project Description: Soperton Roydon Dr

HG-1189 Soperton Railroad Avenue Overlay - Treutlen


PI No: 0012464

Regional Project Id: HG-1189

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $21,000

Invoiced to Date: $7,345

Project Description: Soperton Railroad Avenue Overlay

HG-1227 Soperton Westend Dr - Treutlen


PI No: 0012465

Regional Project Id: HG-1227

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $38,552

Invoiced to Date: $3,896

Project Description: Soperton Westend Dr

HG-1225 Soperton Omega St - Treutlen


PI No: 0012466

Regional Project Id: HG-1225

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $87,648

Invoiced to Date: $5,380

Project Description: Soperton Omega St

HG-1228 Soperton Straight St - Treutlen


PI No: 0012467

Regional Project Id: HG-1228

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $38,552

Invoiced to Date: $3,321

Project Description: Soperton Straight St

HG-1210 Soperton Sessions St - Treutlen


PI No: 0012468

Regional Project Id: HG-1210

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $72,800

Invoiced to Date: $38,750

Project Description: Soperton Sessions St

HG-1214 Soperton Woodland Dr - Treutlen


PI No: 0012469

Regional Project Id: HG-1214

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $91,000

Invoiced to Date: $45,043

Project Description: Soperton Woodland Dr

HG-1223 Soperton Texas Ave - Treutlen


PI No: 0012470

Regional Project Id: HG-1223

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,400

Invoiced to Date: $9,251

Project Description: Soperton Texas Ave

HG-1193 Soperton Edwin St - Treutlen


PI No: 0012471

Regional Project Id: HG-1193

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $35,000

Invoiced to Date: $23,320

Project Description: Soperton Edwin St

HG-1208 Soperton Florida Ave - Treutlen


PI No: 0012472

Regional Project Id: HG-1208

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $119,000

Invoiced to Date: $91,302

Project Description: Soperton Florida Ave

HG-1197 Soperton Canady Ave - Treutlen


PI No: 0012473

Regional Project Id: HG-1197

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $35,000

Invoiced to Date: $22,364

Project Description: Soperton Canady Ave

HG-1192 Soperton Arch St - Treutlen


PI No: 0012474

Regional Project Id: HG-1192

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $35,000

Invoiced to Date: $34,687

Project Description: Soperton Arch St

HG-1226 Soperton Pitus Rd - Treutlen


PI No: 0012475

Regional Project Id: HG-1226

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $87,648

Invoiced to Date: $0

Project Description: Soperton Pitus Rd

HG-1230 Soperton Alpha Rd - Treutlen


PI No: 0012476

Regional Project Id: HG-1230

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $38,552

Invoiced to Date: $0

Project Description: Soperton Alpha Rd

HG-1229 Soperton Faith Circle - Treutlen


PI No: 0012477

Regional Project Id: HG-1229

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $38,552

Invoiced to Date: $0

Project Description: Soperton Faith Circle

HG-1231 Soperton Flordia Ave Ext - Treutlen


PI No: 0012478

Regional Project Id: HG-1231

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $59,670

Invoiced to Date: $0

Project Description: Soperton Flordia Ave Ext

HG-1198 Soperton Kelly St - Treutlen


PI No: 0012479

Regional Project Id: HG-1198

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $15,400

Invoiced to Date: $0

Project Description: Soperton Kelly St

HG-1224 Soperton Highland Dr - Treutlen


PI No: 0012480

Regional Project Id: HG-1224

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $87,648

Invoiced to Date: $86,980

Project Description: Soperton Highland Dr

HG-1196 Soperton Ivy Circle - Treutlen


PI No: 0012481

Regional Project Id: HG-1196

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $35,000

Invoiced to Date: $0

Project Description: Soperton Ivy Circle

HG-1199 Soperton Maple St - Treutlen


PI No: 0012482

Regional Project Id: HG-1199

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $15,400

Invoiced to Date: $0

Project Description: Soperton Maple St

HG-1219 Soperton Clover St - Treutlen


PI No: 0012483

Regional Project Id: HG-1219

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $15,400

Invoiced to Date: $0

Project Description: Soperton Clover St

HG-1194 Soperton Berry St (-$32,758) - Treutlen


PI No: 0012484

Regional Project Id: HG-1194

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $35,000

Invoiced to Date: $0

Project Description: Soperton Berry St

HG-1195 Soperton Norman St - Treutlen


PI No: 0012485

Regional Project Id: HG-1195

County: Treutlen

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $35,000

Invoiced to Date: $0

Project Description: Soperton Norman St

HG-1245 Wayne Widen Rayonier Rd


PI No: 0012486

Regional Project Id: HG-1245

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 2:2016 to 2019

Original Project Budgeted: $1,000,000

Invoiced to Date: $0

Project Description: Wayne Widen Rayonier Rd

HG-1248 Wayne Gardi-Broadhurst Rd


PI No: 0012487

Regional Project Id: HG-1248

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Raise the Grade

Band: 2:2016 to 2019

Original Project Budgeted: $275,000

Invoiced to Date: $69,811

Project Description: Wayne Gardi-Broadhurst Rd

HG-1243 Wayne Replace Bridge on Walter Griffis at Goose Creek


PI No: 0012488

Regional Project Id: HG-1243

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 1:2013 to 2015

Original Project Budgeted: $900,000

Invoiced to Date: $361,003

Project Description: Wayne Replace Bridge on Walter Griffis at Goose Creek

HG-1234 WayneReg Reclamation and Widening Broadhurst Rd West


PI No: 0012489

Regional Project Id: HG-1234

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 2:2016 to 2019

Original Project Budgeted: $2,500,000

Invoiced to Date: $0

Project Description: WayneReg Reclamation and Widening Broadhurst Rd West

HG-1255 Wayne Railroad Crossing at Louisiana Rd


PI No: 0012490

Regional Project Id: HG-1255

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Railroad Crossings

Band: 2:2016 to 2019

Original Project Budgeted: $33,000

Invoiced to Date: $200

Project Description: Wayne Railroad Crossing at Louisiana Rd

HG-1256 Wayne Railroad Crossing at Ed Harrell Rd


PI No: 0012491

Regional Project Id: HG-1256

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Railroad Crossings

Band: 2:2016 to 2019

Original Project Budgeted: $33,000

Invoiced to Date: $200

Project Description: Wayne Railroad Crossing at Ed Harrell Rd

HG-1254 Wayne Railroad Crossing at Slover Rd


PI No: 0012492

Regional Project Id: HG-1254

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Railroad Crossings

Band: 2:2016 to 2019

Original Project Budgeted: $33,000

Invoiced to Date: $200

Project Description: Wayne Railroad Crossing at Slover Rd

HG-1258 Wayne Whaley Rd


PI No: 0012493

Regional Project Id: HG-1258

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $103,400

Invoiced to Date: $102,476

Project Description: Wayne Whaley Rd

HG-1246 Wayne Collins Loop Rd


PI No: 0012494

Regional Project Id: HG-1246

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 1:2013 to 2015

Original Project Budgeted: $409,400

Invoiced to Date: $301,515

Project Description: Wayne Collins Loop Rd

HG-1241 Wayne Replace Bridge on Holmesville Rd


PI No: 0012495

Regional Project Id: HG-1241

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 2:2016 to 2019

Original Project Budgeted: $600,000

Invoiced to Date: $344,743

Project Description: Wayne Replace Bridge on Holmesville Rd

HG-1242 Wayne US 341 Industrial Pk Rd


PI No: 0012496

Regional Project Id: HG-1242

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Roadway Project

Band: 3:2020 to 2022

Original Project Budgeted: $533,000

Invoiced to Date: $0

Project Description: Wayne US 341 Industrial Pk Rd

HG-1251 Wayne Linden Bluff Rd


PI No: 0012497

Regional Project Id: HG-1251

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $49,529

Invoiced to Date: $0

Project Description: Wayne Linden Bluff Rd

HG-1252 Wayne Killingsworth Road


PI No: 0012498

Regional Project Id: HG-1252

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $92,000

Invoiced to Date: $0

Project Description: Wayne Killingsworth Road

HG-1253 Wayne Holmesville Rd Resurfacing


PI No: 0012499

Regional Project Id: HG-1253

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $330,000

Invoiced to Date: $0

Project Description: Wayne Holmesville Rd Resurfacing

HG-1240 Wayne Holemesville Rd Construction


PI No: 0012500

Regional Project Id: HG-1240

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $828,400

Invoiced to Date: $0

Project Description: Wayne Holemesville Rd Construction (from Odum Rd South 2.5 miles)

HG-1280 Jesup Cedar St - Wayne


PI No: 0012501

Regional Project Id: HG-1280

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $59,250

Invoiced to Date: $32,632

Project Description: Jesup Cedar St

HG-1279 Jesup West Orange St Mill/Resurface - Wayne


PI No: 0012502

Regional Project Id: HG-1279

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $239,250

Invoiced to Date: $205,398

Project Description: Jesup West Orange St Mill/Resurface

HG-1267 Jesup West Orange St/US 84 Intersection - Wayne


PI No: 0012503

Regional Project Id: HG-1267

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Intersection Improvements

Band: 3:2020 to 2022

Original Project Budgeted: $900,000

Invoiced to Date: $0

Project Description: Jesup West Orange St/US 84 Intersection

HG-1281 Jesup South Macon St - Wayne


PI No: 0012504

Regional Project Id: HG-1281

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $900,000

Invoiced to Date: $0

Project Description: Jesup South Macon St

HG-1266 Jesup West Cherry St - Wayne


PI No: 0012505

Regional Project Id: HG-1266

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Intersection Improvements

Band: 2:2016 to 2019

Original Project Budgeted: $900,000

Invoiced to Date: $0

Project Description: Jesup West Cherry St

HG-1282 Jesup East Plum St - Wayne


PI No: 0012506

Regional Project Id: HG-1282

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Project Progress Photos

Band: 1:2013 to 2015

Original Project Budgeted: $154,200

Invoiced to Date: $116,260

Project Description: Jesup East Plum St

HG-1274 Jesup Eleventh St - Wayne


PI No: 0012507

Regional Project Id: HG-1274

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $148,600

Invoiced to Date: $0

Project Description: Jesup Eleventh St

HG-1278 Jesup Robert Hunter Circle - Wayne


PI No: 0012508

Regional Project Id: HG-1278

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $60,000

Invoiced to Date: $0

Project Description: Jesup Robert Hunter Circle

HG-1276 Jesup Hunter St - Wayne


PI No: 0012509

Regional Project Id: HG-1276

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $16,400

Invoiced to Date: $0

Project Description: Jesup Hunter St

HG-1265 Jesup West Pine St - Wayne


PI No: 0012510

Regional Project Id: HG-1265

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Intersection Improvements

Band: 2:2016 to 2019

Original Project Budgeted: $900,000

Invoiced to Date: $0

Project Description: Jesup West Pine St

HG-1271 Jesup Bay Acres Rd Sidewalk - Wayne


PI No: 0012511

Regional Project Id: HG-1271

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 3:2020 to 2022

Original Project Budgeted: $136,000

Invoiced to Date: $0

Project Description: Jesup Bay Acres Rd Sidewalk

HG-1270 Jesup New East Plum St Sidewalk - Wayne


PI No: 0012512

Regional Project Id: HG-1270

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 3:2020 to 2022

Original Project Budgeted: $41,500

Invoiced to Date: $0

Project Description: Jesup New East Plum St Sidewalk

HG-1268 Jesup New US 301 S Sidewalk - Wayne


PI No: 0012513

Regional Project Id: HG-1268

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 3:2020 to 2022

Original Project Budgeted: $52,000

Invoiced to Date: $0

Project Description: Jesup New US 301 S Sidewalk

HG-1284 Odum North Church St - Wayne


PI No: 0012514

Regional Project Id: HG-1284

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $95,200

Invoiced to Date: $68,338

Project Description: Odum North Church St

HG-1285 Odum Ivey St - Wayne


PI No: 0012515

Regional Project Id: HG-1285

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,400

Invoiced to Date: $0

Project Description: Odum Ivey St

HG-1290 Odum Tillman St - Railroad to Hires - Wayne


PI No: 0012516

Regional Project Id: HG-1290

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $17,920

Invoiced to Date: $0

Project Description: Odum Tillman St - Railroad to Hires

HG-1286 Odum Tillman St - (Part) (Main St. to Roberson Rd.) - Wayne


PI No: 0012517

Regional Project Id: HG-1286

County: Wayne

Congressional District: 1

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $74,082

Invoiced to Date: $0

Project Description: Odum Tillman St - (Part) (Main St. to Roberson Rd.)

HG-1292 Wheeler Snowhill Baptist Church Rd - CR 178


PI No: 0012518

Regional Project Id: HG-1292

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: SrfTrt

Band: 1:2013 to 2015

Original Project Budgeted: $376,000

Invoiced to Date: $315,392

Project Description: Wheeler Snowhill Baptist Church Rd - CR 178 (Part - 4.7 miles) (Begin at CR 40 and end at SR 46)

HG-1294 Wheeler Mt Olivet Church Rd Bridge


PI No: 0012520

Regional Project Id: HG-1294

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 3:2020 to 2022

Original Project Budgeted: $277,500

Invoiced to Date: $0

Project Description: Wheeler Mt Olivet Church Rd Bridge

HG-1296 Alamo Broad St - Wheeler


PI No: 0012522

Regional Project Id: HG-1296

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $154,000

Invoiced to Date: $136,437

Project Description: Alamo Broad St

HG-1297 Alamo Lucille Ave Sidewalk - Wheeler


PI No: 0012523

Regional Project Id: HG-1297

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Sidewalks

Band: 2:2016 to 2019

Original Project Budgeted: $316,800

Invoiced to Date: $0

Project Description: Alamo Lucille Ave Sidewalk

HG-1298 Alamo Railroad St - Wheeler


PI No: 0012524

Regional Project Id: HG-1298

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $84,000

Invoiced to Date: $93,622

Project Description: Alamo Railroad St

HG-1299 Alamo Kent St - Wheeler


PI No: 0012525

Regional Project Id: HG-1299

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $28,000

Invoiced to Date: $0

Project Description: Alamo Kent St

HG-1300 Alamo Second St - Wheeler


PI No: 0012526

Regional Project Id: HG-1300

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $56,000

Invoiced to Date: $0

Project Description: Alamo Second St

HG-1301 Alamo West Railroad - Wheeler


PI No: 0012527

Regional Project Id: HG-1301

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $56,000

Invoiced to Date: $0

Project Description: Alamo West Railroad

HG-1302 Alamo Snowhill Rd - Wheeler


PI No: 0012528

Regional Project Id: HG-1302

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $14,000

Invoiced to Date: $0

Project Description: Alamo Snowhill Rd

HG-1303 Glenwood SW Third Ave - Wheeler


PI No: 0012529

Regional Project Id: HG-1303

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $56,000

Invoiced to Date: $41,243

Project Description: Glenwood SW Third Ave

HG-1304 Glenwood N 5th St - Wheeler


PI No: 0012530

Regional Project Id: HG-1304

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $63,000

Invoiced to Date: $46,399

Project Description: Glenwood N 5th St

HG-1312 Glenwood N 5th St - Wheeler


PI No: 0012531

Regional Project Id: HG-1312

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $70,000

Invoiced to Date: $34,584

Project Description: Glenwood N 5th St

HG-1310 Glenwood N First St - Wheeler


PI No: 0012532

Regional Project Id: HG-1310

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $72,000

Invoiced to Date: $58,346

Project Description: Glenwood N First St

HG-1306 Glenwood West 4th Ave and West 1st Ave - Wheeler


PI No: 0012533

Regional Project Id: HG-1306

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $35,000

Invoiced to Date: $0

Project Description: Glenwood West 4th Ave and West 1st Ave (Part) (Only West 4th Ave)

HG-1305 Glenwood West 6th and 5th Ave - Wheeler


PI No: 0012534

Regional Project Id: HG-1305

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $70,000

Invoiced to Date: $0

Project Description: Glenwood West 6th and 5th Ave

HG-1308 Glenwood S 4th St and N 4th St - Wheeler


PI No: 0012535

Regional Project Id: HG-1308

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $29,638

Invoiced to Date: $0

Project Description: Glenwood S 4th St and N 4th St

HG-1313 Wilcox Mount Olive Rd


PI No: 0012536

Regional Project Id: HG-1313

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $177,216

Invoiced to Date: $1,074

Project Description: Wilcox Mount Olive Rd

HG-1314 Wilcox Troutman Rd


PI No: 0012537

Regional Project Id: HG-1314

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $32,216

Invoiced to Date: $31,928

Project Description: Wilcox Troutman Rd

HG-1315 Wilcox Thistle Rd


PI No: 0012538

Regional Project Id: HG-1315

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $150,000

Invoiced to Date: $0

Project Description: Wilcox Thistle Rd

HG-1321 Wilcox Statham Shoals Rd


PI No: 0012539

Regional Project Id: HG-1321

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $390,000

Invoiced to Date: $0

Project Description: Wilcox Statham Shoals Rd

HG-1322 Wilcox Walker Rd


PI No: 0012540

Regional Project Id: HG-1322

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $450,000

Invoiced to Date: $0

Project Description: Wilcox Walker Rd

HG-1320 Wilcox Lebanon Rd


PI No: 0012541

Regional Project Id: HG-1320

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $154,000

Invoiced to Date: $0

Project Description: Wilcox Lebanon Rd

HG-1348 Abbeville E Neapolis St - Wilcox


PI No: 0012542

Regional Project Id: HG-1348

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $39,879

Invoiced to Date: $29,535

Project Description: Abbeville E Neapolis St

HG-1337 Abbeville Palm Dr - Wilcox


PI No: 0012543

Regional Project Id: HG-1337

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 1:2013 to 2015

Original Project Budgeted: $70,511

Invoiced to Date: $427

Project Description: Abbeville Palm Dr

HG-1327 Abbeville Bowen St - Wilcox


PI No: 0012544

Regional Project Id: HG-1327

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $29,830

Invoiced to Date: $26,201

Project Description: Abbeville Bowen St

HG-1341 Abbeville Bell St - Wilcox


PI No: 0012545

Regional Project Id: HG-1341

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $43,193

Invoiced to Date: $31,576

Project Description: Abbeville Bell St

HG-1331 Abbeville Isabella St - Wilcox


PI No: 0012546

Regional Project Id: HG-1331

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $20,947

Invoiced to Date: $15,843

Project Description: Abbeville Isabella St

HG-1330 Abbeville W Ocmulgee St - Wilcox


PI No: 0012547

Regional Project Id: HG-1330

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $9,148

Invoiced to Date: $13,541

Project Description: Abbeville W Ocmulgee St

HG-1329 Abbeville Wilson Rd - Wilcox


PI No: 0012548

Regional Project Id: HG-1329

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $50,856

Invoiced to Date: $0

Project Description: Abbeville Wilson Rd

HG-1338 Abbeville West Neopolis - Wilcox


PI No: 0012549

Regional Project Id: HG-1338

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 3:2020 to 2022

Original Project Budgeted: $36,061

Invoiced to Date: $0

Project Description: Abbeville West Neopolis

HG-1336 Abbeville East Monroe - Wilcox


PI No: 0012550

Regional Project Id: HG-1336

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $11,826

Invoiced to Date: $0

Project Description: Abbeville East Monroe

HG-1345 Abbeville Reid St - Wilcox


PI No: 0012551

Regional Project Id: HG-1345

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $30,652

Invoiced to Date: $0

Project Description: Abbeville Reid St

HG-1342 Abbeville Riverside Dr - Wilcox


PI No: 0012552

Regional Project Id: HG-1342

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $15,485

Invoiced to Date: $0

Project Description: Abbeville Riverside Dr

HG-1343 Abbeville Barnes St - Wilcox


PI No: 0012553

Regional Project Id: HG-1343

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $26,886

Invoiced to Date: $0

Project Description: Abbeville Barnes St

HG-1346 Abbeville W Neapolis St - Wilcox


PI No: 0012554

Regional Project Id: HG-1346

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $39,110

Invoiced to Date: $0

Project Description: Abbeville W Neapolis St

HG-1339 Abbeville West Monroe - Wilcox


PI No: 0012555

Regional Project Id: HG-1339

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Grade Drain Base and Pave

Band: 2:2016 to 2019

Original Project Budgeted: $32,945

Invoiced to Date: $0

Project Description: Abbeville West Monroe

HG-1334 Abbeville Depot St - Wilcox


PI No: 0012556

Regional Project Id: HG-1334

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $43,591

Invoiced to Date: $0

Project Description: Abbeville Depot St

HG-1340 Abbeville Church St - Wilcox


PI No: 0012557

Regional Project Id: HG-1340

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $11,455

Invoiced to Date: $0

Project Description: Abbeville Church St

HG-1328 Abbeville Simon Keen Rd - Wilcox


PI No: 0012558

Regional Project Id: HG-1328

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $59,527

Invoiced to Date: $0

Project Description: Abbeville Simon Keen Rd

HG-1326 Abbeville College St - Wilcox


PI No: 0012559

Regional Project Id: HG-1326

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $6,841

Invoiced to Date: $0

Project Description: Abbeville College St

HG-1335 Abbeville College St Seg 2 - Wilcox


PI No: 0012560

Regional Project Id: HG-1335

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $59,792

Invoiced to Date: $0

Project Description: Abbeville College St Seg 2

HG-1347 Abbeville Sibbie Rd - Wilcox


PI No: 0012561

Regional Project Id: HG-1347

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $13,098

Invoiced to Date: $0

Project Description: Abbeville Sibbie Rd

HG-1344 Abbeville Burkett St - Wilcox


PI No: 0012562

Regional Project Id: HG-1344

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $11,402

Invoiced to Date: $0

Project Description: Abbeville Burkett St

HG-1333 Abbeville West Park Ave - Wilcox


PI No: 0012563

Regional Project Id: HG-1333

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $7,822

Invoiced to Date: $0

Project Description: Abbeville West Park Ave

HG-1332 Abbeville East Park Ave - Wilcox


PI No: 0012564

Regional Project Id: HG-1332

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $12,913

Invoiced to Date: $0

Project Description: Abbeville East Park Ave

HG-1351 Rochelle Bessie Ave - Wilcox


PI No: 0012565

Regional Project Id: HG-1351

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 1:2013 to 2015

Original Project Budgeted: $110,000

Invoiced to Date: $28,437

Project Description: Rochelle Bessie Ave

HG-1352 Rochelle Ruben St - Wilcox


PI No: 0012566

Regional Project Id: HG-1352

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $70,000

Invoiced to Date: $32,439

Project Description: Rochelle Ruben St

HG-1353 Rochelle Jessie St - Wilcox


PI No: 0012567

Regional Project Id: HG-1353

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $110,000

Invoiced to Date: $25,694

Project Description: Rochelle Jessie St

HG-1355 Rochelle Ginhouse St - Wilcox


PI No: 0012568

Regional Project Id: HG-1355

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $110,000

Invoiced to Date: $0

Project Description: Rochelle Ginhouse St

HG-1356 Rochelle Pine St - Wilcox


PI No: 0012569

Regional Project Id: HG-1356

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 2:2016 to 2019

Original Project Budgeted: $35,000

Invoiced to Date: $35,970

Project Description: Rochelle Pine St

HG-1357 Rochelle Mill St - Wilcox


PI No: 0012570

Regional Project Id: HG-1357

County: Wilcox

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Resurfacing & Maintenance

Band: 3:2020 to 2022

Original Project Budgeted: $35,000

Invoiced to Date: $0

Project Description: Rochelle Mill St

HG-1295 Wheeler Ochwalkee Creek Bridge


PI No: 0014178

Regional Project Id: HG-1295

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 3:2020 to 2022

Original Project Budgeted: $200,000

Invoiced to Date: $45,500

Project Description: Wheeler Ochwalkee Creek Bridge

SR 341/Northwest Eastman Bypass


PI No: 221975-

Regional Project Id: RC09-000013

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Roadway Project

Band: 1:2013 to 2015

Original Project Budgeted: $8,515,626 (Blended Project - Total Budget)

Invoiced to Date: $1,703,125

Project Description: SR 341/Northwest Eastman Bypass from SR 27/US 341 Northeast to SR 87/US 23

SR 87/US 23 Widening


PI No: 222410-

Regional Project Id: RC09-000014

County: Dodge

Congressional District: 8

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 2:2016 to 2019

Original Project Budgeted: $8,515,626 (Blended Project - Total Budget)

Invoiced to Date: $0

Project Description: SR 87/US 23 Widening from CR 8/Log Cabin Rd to South of SR 257

HG-0777 Laurens Chappel Mill Bridge


PI No: 270724-

Regional Project Id: HG-0777

County: Laurens

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 2:2016 to 2019

Original Project Budgeted: $400,000

Invoiced to Date: $396,424

Project Description: Laurens Chappel Mill Bridge

US 1/SR 4 Widening


PI No: 522220-

Regional Project Id: RC09-000077

County: Toombs

Congressional District:

Regional Commission: Heart of Georgia Altamaha

Project Type: Widening

Band: 3:2020 to 2022

Original Project Budgeted: $101,927,957 (Blended Project - Total Budget)

Invoiced to Date: $0

Project Description: Widening of U.S. 1/SR 4 from North of Williams Creek (near Appling line) to Green Oak Road, 522190, 522180

HG-1291 Wheeler Alligator Creek Bridge


PI No: 532342-

Regional Project Id: HG-1291

County: Wheeler

Congressional District: 12

Regional Commission: Heart of Georgia Altamaha

Project Type: Bridge

Band: 3:2020 to 2022

Original Project Budgeted: $562,500

Invoiced to Date: $0

Project Description: Wheeler Alligator Creek Bridge